Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 19-Sep-2021 02:32:05 PM 
Back  
DPR Frozen Status Report

S.No Work Name(Work Code) Work Status
1 2105017499/DP/21064 (Road side Jackfruit Plantation in convergence with Horticulture Department at Zikzak 1km) Approved
2 2105017499/DP/21065 (Road side Mango plantation in Convergence with Horticulture Department at Zikzak 1km) Approved
3 2105017499/LD/14508 ((A) Construction of Retaining wall at Block Playground river in Zikzak) Approved
4 2105017499/LD/14509 ((B) Construction of Retaining wall at Bank river in Zikzak ) Approved
5 2105017499/LD/5974 (436. Construction of retaining wall with staircase including earth filling at Zikzak (27.00m3)) Completed
6 2105017499/WC/6468 (7 Construction Of CC Checkdam At Domapara road (150.320m3)) Completed
7 2105017499/FP/10492 (179 A Construction Of Flood Protection Wall At Zikzak Ashram River Length 70 00M 2020 2021) On Going
8 2105017499/FP/10493 (179 B Construction Of Flood Protection Wall At Zikzak Ashram River Length 65 00M 2020 2021) On Going
9 2105017499/FP/1137 (146. Providing B/S including E/F at Rakhaldubi) On Going
10 2105017499/FP/4375 (401. Providing boulder sausage including earth filling near Durga Mandir (River at Zikzak. (62.65m)) On Going
11 2105017499/LD/10183 (821 Construction Of Erosion Control Protection Wall At Zikzak Length 53 00M 2019 2020) On Going
12 2105017499/LD/13354 (Construction Of Retaining Wall At Bajar River 100M 2021 2022) On Going
13 2105017499/LD/5447 (416. Improvement of School Play ground. At Zikzak (1272.888m3).) On Going
14 2105017499/LD/7110 (128. Construction Of Retaining Wall With Earth Filling At Zikzak. (18.72m) (2018-2019)) On Going
15 2105017499/LD/7111 (129. Construction Of Retaining Wall With Earth Filling At Zikzak.(20.05m) (2018-2019)) On Going
16 2105017499/LD/7184 (194 Construction Of Retaining Wall With Earth Filling At L.P. School Ground At Zikzak (25.05m)18-19) On Going
17 2105017499/LD/8607 (598 Improvement Of Play Ground Durga Mandir At Zikzak 9874 13M 2018 2019) On Going
18 2105017499/LD/9534 (578 Construction Of Flood Protection Retaining Wall At Zikzak Length 67 00M 2019 2020) On Going
19 2105017499/RC/44113 (624 Construction Of CC Jeepable Road From Cooperative To Creation At Zikzak Length 250 00M 2019 2020) On Going
20 2105017499/WC/14108 (380 Construction Of Erosion Control Gabion Check Dam At Zikzak 9M 2019 2020) On Going
21 2105017499/WC/15293 (453 (A) Construction Of Community Water Tank At Zikzak (15 88M3) 2019 2020) On Going
22 2105017499/WC/15295 (453 (B) Construction Of Community Water Tank At Zikzak (15 88M3) 2019 2020) On Going

Download In Excel