Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 17-Sep-2021 10:26:15 AM 
Back  
DPR Frozen Status Report

S.No Work Name(Work Code) Work Status
1 2105017599/FP/4157 (226. Construction of CC Check dam at Torangpara. (52.440m3+19.643m3=72.083m3)) Completed
2 2105017599/RC/15869 (296. Improvement of road from Turangpara to Nolbaripara with 1nos of culverts at Turangpara) Completed
3 2105017599/FP/6041 (152. Providing Boulder sausage including earth filling at Torang Chiring (35.00m)) On Going
4 2105017599/FP/9937 (768 Construction of Erosion Gabion wall as per PWD SOR Road Bridge at Torangpara length 30.00m) On Going
5 2105017599/RC/51762 (249 Construction of CC Jeepable road at Torangpara length 300m ) On Going
6 2105017599/WC/15077 (439 (E) Construction of Ringwell at Torangpara 9 232m3) On Going
7 2105017599/WC/15080 (439-A Construction of Ring well at Torangpara 9 232m3 ) On Going
8 2105017599/WC/15083 (439-B Construction of Ring well at Torangpara 9 232m3) On Going
9 2105017599/WC/15085 (439-C Construction of Ring well at Torangpara (9.232m3)) On Going
10 2105017599/WC/15086 (439-D Construction of Ring well at Torangpara (9.232m3)) On Going

Download In Excel