Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 20-Sep-2021 01:08:40 PM 
Back  
DPR Frozen Status Report

S.No Work Name(Work Code) Work Status
1 2105017656/DP/5974 (110 - A Arecnaut Plantation at Silbaripara Sapendra Hajong 4086 2 Hec) Completed
2 2105017656/DP/5975 (110 - B Arecanut Plantation at Silbaripara Basanta Hajong 4080 2 Hec) Completed
3 2105017656/DP/5976 (110 - C Arecanut Plantation at Silbaripara Jahir Hajong 4097 2 Hec) Completed
4 2105017656/DP/5977 (110 - D Arecanut Plantation at Silbaripara British Ch Hajong 4078 2 Hec) Completed
5 2105017656/DP/5980 (110 - E Arecanut Plantation at Silbaripara Ratnakar Hajong 4079 2 Hec) Completed
6 2105017656/DP/5981 (110 - F Arecanut Plantation at Silbaripara Mitab Hajong 4072 2 Hec) Completed
7 2105017656/DP/5982 (110 - G Arecanut Plantation at Silbaripara Kritya Hajong 4115 2 Hec) Completed
8 2105017656/DP/5983 (110 - H Arecanut Plantation at Silbaripara Bhagyadhar Hajong 4116 2 Hec) Completed
9 2105017656/DP/5985 (110 - I Arecanut Plantation at Silbaripara Kostomohan Hajong 4093 2 Hec) Completed
10 2105017656/FR/1282 (124. Excavation 2 nos. Dug out Pond at Silbaripara. ( 1345.276 m3x2 = 2690.552 m3)) Completed
11 2105017656/IC/1522 (376. Construction of Kutcha Irrigation canal at Silbaripara. (515.00)) Completed
12 2105017656/LD/5691 (249 Improvement Of L.P School Playground With Retaining Wall At Silbaripara (463.57m3)) Completed
13 2105017656/WC/8611 (506. Excavation of community dug out pond 2 nos at Silbaripara. (1863.900m3)) Completed
14 2105017656/AV/954 (325 Construction Of Anganwadi Centre Upto Plinth Level In Convergence With MGNREGA Zikzak (10258m3)) On Going
15 2105017656/DP/20881 (Road Side Mango Plantation In Convergence With Horticulture Department At Silbaripara Length 1Km) On Going
16 2105017656/DP/8470 (441 Road Side Jackfruit Latex Free Plantation For 1 Km Both Side Of The Road at Silbaripara 18-19) On Going
17 2105017656/IC/2885 (217Construction Of Kutcha Irrigation Canal At Silbaripara Length 300 0M 2020 2021) On Going
18 2105017656/LD/8262 (586 Construction Of Retaining Wall With Earth Filling At Silbaripara Extension 72 92M 2018 2019) On Going
19 2105017656/RC/15918 (270. Improvement of road from Silbaripara to Katabari with boulder sausage. At Silbaripara. (0.43 km) On Going
20 2105017656/RC/30963 (126. Construction Of CC Jeepable Road At Silbaripara. (295.60m) 2018-2019) On Going
21 2105017656/RC/44093 (720 Construction Of CC Foothpath At Silbaripara Length 500 00M 2019 2020) On Going
22 2105017656/RC/52309 (400 Construction Of CC Jeepable Road From PWD Road To Silbaripara At Silbaripara Length 250 00M 20) On Going
23 2105017656/WC/15012 (468 Construction Of Ringwell 1Nos At Silbaripara (11 00m3) 2019 2020) On Going

Download In Excel