DPR Frozen Status Report

S.No Work Name(Work Code) Work Status
1 2105017677/FP/2535 (183.Construction of bund at Santogre. (292.05m3)) Completed
2 2105017677/FP/4064 (2 Construction of Kutcha bund at Santogre (57.10m)) Completed
3 2105017677/LD/4306 (312. Improvement of Community of ground. At Santogre (1127.439m3) ) Completed
4 2105017677/RC/29498 (497 Improvement of road from Sisogitok to Songitalgre at Santogre.(1.8km)) Completed
5 2105017625/WC/18634 (182 Construction of rcc spring chamber at santogre MLAMP in convergence with MGNREGA length 2 50m) On Going
6 2105017677/AV/3124 (47 Construction of rcc Anganwadi centre in convergence with MGNREGA under Zikzak C&RD Block length 8) On Going
7 2105017677/DP/20844 (2 Road side Mango Plantation in convergence with Horticulture Department at Santogre ) On Going
8 2105017677/DP/20845 (3 Road side Jackfruit plantation in convergence with Horticulture Department at Santogre ) On Going
9 2105017677/DP/8305 (292 Arecanut Cultivation at Santogre.(10-Bigha)(Spacing:2.5x.5)(2018-19)) On Going
10 2105017677/LD/10621 (877 Improvement of Playground at Santogre Length 100 00m) On Going
11 2105017677/RC/26942 (57 Construction of CC Footpath at Santogre.(300.50m)(2018-19)) On Going
12 2105017677/RC/32903 (342 Construction of CC road from PMGSY road to Kendith gittim at Santogre 229.00m 2018-19) On Going
13 2105017677/RC/57430 (Construction of CC Jeepable road at Santogre) On Going
14 2105017677/RC/61971 (B Construction of CC Jeepable road at Santogre 2021 2022) On Going
15 2105017677/WC/10183 (774 A Construction of Community Spring Chamber at Santogre Length 2 5m) On Going
16 2105017677/WC/15337 (392 A Construction of Contour Trenches at Santogre 100nos per hactars 8bigha) On Going
17 2105017677/WC/15338 (392 B Construction of Contour Trenches 100nos per hactars at Santogre 8 bigha ) On Going
18 2105017677/WC/18175 (774 B Construction of Community Spring Chamber at Santogre Length 2 5m) On Going
19 2105017677/WC/18188 (774 C Construction of Community Spring Chamber at Santogre Length 2 5m) On Going
20 2105017677/WC/18191 (774 D Construction of Community Spring Chamber at Santogre Length 2 5m) On Going
21 2105017677/WC/18192 (774 E Construction of Community Spring Chamber at Santogre Length 2 5m) On Going
22 2105017677/WC/18416 (75 Construction of contour trenches 100nos per hac as per pwd sor for road and bridge at Santogre) On Going
23 2105017677/WC/28221 (Construction of CC checkdam at Santogre 2021 2022) On Going
24 2105017677/WC/6952 (417 Construction of Rcc Check dam at Santogre.(52.440m3)) On Going
25 2105017690/RC/45471 (300 Construction of CC Jeepable road from Agatchi gittim to Bentera gittim at Santogre Length 480m) On Going