Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Sep-2021 06:14:16 PM 
Back  
DPR Frozen Status Report

S.No Work Name(Work Code) Work Status
1 2105017671/LD/14713 (Construction of Retaining wall at Nachilpara) Approved
2 2105017671/RC/57470 (Constriction of CC Jeepable road at Nachilpara) Approved
3 2105017671/RC/57471 (Constriction of CC Jeepable road at Nachilpara) Approved
4 2105017671/FP/4119 (165 Construction of retaining wall with earth filling at Teenkigitok (30.00m)) Completed
5 2105017671/LD/3946 (100. Improvement of Playground at Nachilpara) Completed
6 2105017671/RC/23215 (277 Construction of road from Transrormer to Ninggan gittim with 2nos of culverts atNachilpara(1.5k)) Completed
7 2105017671/RC/24102 (366 Improvement of road from Bolcheng gittim to Mancheng gittim at Nachilpara.(0.7km)) Completed
8 2105017671/WC/4573 (267(3)Const. of Water Harvesting structure at Salmanpara in Convergence with water resources) Completed
9 2105017671/WC/6441 (1 Excavation of dug out pond 3nos at Nachilpara (19944.137m3x3= 5832.411m3).) Completed
10 2105017646/DP/13303 (209 Catchment are Protection actives model norms for Aforestation with Pine non pine 6 7 hac at ) On Going
11 2105017671/DP/21031 (6 Road side Mango plantation at Nachilpara with technical support of horticulture department 2km ) On Going
12 2105017671/DP/8360 (340.Arecanut Cultivation at Nachilpara.(10 Bigha)(Spacing:2.5x2.5)(2018-19)) On Going
13 2105017671/IF/43983 (387 Individual Pineapple Cultivation 1bigha with Construction of Trenches at Nachilpara) On Going
14 2105017671/RC/26845 (38 Construction of CC Footpath from PMGSY road to Salmanpara at Nachilpara.(503.00m)(2018-19)) On Going
15 2105017671/RC/33058 (512 Construction of road from Nachilpara to Darugre with 2nos of culverts at Nachilpara. (1.3km)) On Going
16 2105017671/RC/36109 (698 Construction CC Jeepable raod from PMGSY road to Ningan gittim at Nachilpara Length 560 00m) On Going
17 2105017671/RC/45329 (143 Improvement of road from nikem gittim to smart gittim at Nachilpara length 1 2km) On Going
18 2105017671/WC/10187 (374 A Construction of Community ringwell at Nachilpara 10 77m3) On Going
19 2105017671/WC/12569 (220 Construction of Trenches in convergence with IBDLP 100nos hac as per pwd SOR for road and Bridge) On Going
20 2105017671/WC/14224 (374 B Construction of Community ringwell at Nachilpara 10 77m3) On Going
21 2105017671/WC/14225 (374 C Construction of Community ringwell at Nachilpara 10 77m3) On Going
22 2105017671/WC/14227 (374 D Construction of Community ringwell at Nachilpara 10.77m3) On Going
23 2105017671/WC/14231 (374 E Construction of Community ringwell at Nachilpara 10 77m3) On Going
24 2105017671/WC/18394 (256 Construction of rcc spring chamber at Nachilpara MLAMP inconvergence with MGNREGA length 3 00m) On Going
25 2105017671/WC/21271 (19 Construction Of Contour Trenches 100Nos Per Hactres Asper PWD SOR For Road And Bridge Length ) On Going
26 2105017671/WC/26272 (Construction of Spring Chamber at Nachilpara) On Going
27 2105017671/WC/28046 (B Construction of Spring chamber at Nachilpara 2021 2022) On Going
28 2105017671/WC/28047 (C Construction of Spring chamber at Nachilpara 2021 2022) On Going
29 2105017671/WC/28048 (D Construction of Spring chamber at Nachilpara 2021 2022) On Going
30 2105017671/WC/28049 (E Construction of Spring chamber at Nachilpara 2021 2022) On Going
31 2105017702/RC/45780 (315 Improvement of road from nokmagittim to apalgre with 1nos of culvert at nachilpara length0 840k) On Going
32 2105017705/RC/45783 (299 Construction of CC Jeepable road from Apalgre to chambu Ading at Nachilpara Length 485m) On Going

Download In Excel