DPR Frozen Status Report

S.No Work Name(Work Code) Work Status
1 2105017661/DP/6142 (182 - A Black Pepper Cultivation Mekdual 2 Bigha J C No 501) Completed
2 2105017661/IF/26144 (182-D Black Pepper Cultivation at Mekdual 2-Bigha (J.C. N0.3830)) Completed
3 2105017661/IF/26145 (182 (C) Black Pepper Cultivation at Mekdual 2 Bigha to Job card No.662) Completed
4 2105017661/IF/26146 (182 - B Black Pepper Cultivation At Mekdual J C No 649 2 Bigha) Completed
5 2105017661/IF/26147 (182 - E Black Pepper Cultivation at Mekdual 2 Bigha (J.C.No - 641)) Completed
6 2105017661/IF/26148 (182 - F Black Pepper Cultivation at Mekdual 2-Bigha (J.C.N0-3840)) Completed
7 2105017661/IF/33794 (531. Excavation of dug out pond 1 nos at Mekdual JC No. 66) Completed
8 2105017661/LD/3936 (21.Improvement of playground at Mekdual.(1597.5m3)) Completed
9 2105017661/RC/24488 (402. Construcation of CC Footpath Cum step at Mekdual. (125.50m)) Completed
10 2105017661/WC/4560 (250. Construction of CC Checkdam At Mekdual. (59.805 m3)) Completed
11 2105017661/DP/8415 (309 Arecanut Cultivation At Mekdual 4 Bigha 2018 2019) On Going
12 2105017661/FP/4239 (266 Construction of earth canal at Mekdual (659.00m)) On Going
13 2105017661/FR/1841 (445 Excavation of dug out pond at Mekdual) On Going
14 2105017661/RC/30916 (36. Construction Of CC Foothpath At Mekdual. (154.90m) 2018-2019) On Going
15 2105017661/RC/32548 (422 Construction Of CC Road From Nokma Gittim To Mekdual 141.00m 2018 2019) On Going
16 2105017661/RC/44108 (710 Construction Of CC Foothpath At Mekdual Length 350 00M 2019 2020) On Going
17 2105017661/RC/48527 (885 Improvement Of Road From Nokma Gittim To Behar Gittim Village Link Road At Mekdual Length 0 4M ) On Going
18 2105017661/RC/51869 (269Construction Of CC Jeepable Road From Adinggre PWD Road To Mekdual Nokma Gittim At Mekdual 20 21) On Going
19 2105017661/WC/12004 (204 Construction Of Trench In Convergence With IBDLP 100Nos Hac As Per PWD Sor For Road And Bridges ) On Going
20 2105017661/WC/15483 (484 (A) Construction Of Spring Chamber At Mekdual (5 84m3) 2019 2020) On Going
21 2105017661/WC/15696 (484 (B) Construction Of Spring Chamber At Mekdual (5 84M) 2019 2020) On Going
22 2105017661/WC/21792 (171 Construction Of Spring Chamber At Mekdual MLAMP In Convergence With MGNREGA Length 2020 2021) On Going
23 2105017661/WC/28735 (A Construction of Community spring Chamber at Himalya Sangma gittim in Mekdual) On Going
24 2105017661/WC/28736 (B Construction of Community spring chamber at Behalson marak Gittim in Mekdual ) On Going
25 2105017661/WC/28737 (C Construction of Community spring Chamber at Kanding Marak gittim in Mekdual) On Going