Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 20-Sep-2021 02:12:14 PM 
Back  
DPR Frozen Status Report

S.No Work Name(Work Code) Work Status
1 2105017660/LD/14390 (Construction of Retaining wall with earth filling at Jigapara SS LP School 190m at Koraitola ) Approved
2 2105017660/FP/2594 (208. Providing Bolder Sausage Inlcuding Earth Filling At Koraitola. ) Completed
3 2105017660/IC/1463 (50 Construction Of Pucca Irregation Canal At Koraitola (180.50)) Completed
4 2105017660/IF/26112 (185-B Excavation of Dug out pond at Koraitola-1-nos (J.C.No-3797) (1459.294m3)) Completed
5 2105017660/IF/26113 (185-A Excavation of Dug out pond at Koraitola-1nos (J.C.No-3749)(1459.294m3)) Completed
6 2105017660/LD/3909 (82.Improvement of community ground at Koraitola. (736.992m3)) Completed
7 2105017660/RC/24489 (391. Improvement of road from PWD road to Konapara via Jigapara at Koraitola Koraitola. (0.7km)) Completed
8 2105017660/DP/8433 (279 Arecanut Cultivation At Koraitola 2 Bigha 2018 2019) On Going
9 2105017660/IC/1905 (465 Construction Of Pucca Irrigation Canal At Koraitola (259.10M) 2018 2019) On Going
10 2105017660/IF/45267 (521 SBM Waste Collection From Village Koraitola Rural Sanitation For Debanan Hajong Job Card No 3780) On Going
11 2105017660/LD/11967 (348 Improvement Of Community Ground With Protection Wall At Koraitola Length 130 00M 2020 2021) On Going
12 2105017660/LD/9719 (691 Construction Of Retaining Wall For Erosion Control At Koraitola Length 200 00 2019 2020) On Going
13 2105017660/RC/30962 (103. Construction Of CC Jeepable Road At Koraitola. (120.00m) 2018-2019) On Going
14 2105017660/RC/32109 (335 Construction Of CC Road At Koraitola. (130.00m) 2018-2019) On Going
15 2105017660/RC/36154 (535 Construction Of CC Foothpath At Koraitola Length 200M 2019 2020) On Going
16 2105017660/WC/14664 (427 Construction Of Spring Chamber At Koraitola (5 85m3) 2019 2020) On Going
17 2105017660/WC/21255 (08 A Excavation Of Dug Out Pond At Koraitola Bidyadhor Hajong Length 20 00M 2020 2021) On Going
18 2105017660/WC/21256 (08 B Excavation Of Dug Out Pond At Koraitola Brojendra Hajong Length 20 00M 2020 2021) On Going
19 2105017660/WC/28278 (A Construction of Ringwell at Koraitola Giridhar) On Going
20 2105017660/WC/28279 (B Construction of Ringwell at Koraitola Sujendra) On Going
21 2105017660/WC/28280 (C Construction of Ringwell at Koraitola Gokul) On Going
22 2105017660/WC/28281 (D Construction of Ringwell at Koraitola Chandranath) On Going

Download In Excel