Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Sep-2021 06:19:08 PM 
Back  
DPR Frozen Status Report

S.No Work Name(Work Code) Work Status
1 2105017531/RC/62197 (Construction of CC Jeepable road from Katuligre village to katuligre nokma gittim at Katuligre 21 22) Approved
2 2105017531/DW/1637 (468 Construction of Community Ringwell 3 Nos at Katuligre (18.110m3)) Completed
3 2105017531/FP/2571 (201 Providing boulder sausage including earth filling at Katuligre (2185.95m3)) Completed
4 2105017531/FR/1200 (36 Excavation of Dug out pond at Katuligre (2620.224m3)) Completed
5 2105017531/RC/22605 (139 Construction of road from Katuli bill to Rubber Bagan with 3 Nos of Culverts (816.063m3)) Completed
6 2105017531/RC/23766 (331 Construction of CC footpath at Katuligre (360.50m)) Completed
7 2105017531/DP/20836 (2 Road side Mago Plantation in Convergence with Horticulture Department at Katuligre 2km 2021 2022) On Going
8 2105017531/DP/8363 (253 Mango Plantation for 1 km at Katuligre both side of the road (spacing 6m)18-19)) On Going
9 2105017531/IF/45504 (531 SBM Waste Collection from village Katuligre Rural Sanitation for Chepstone Marak Jc No. 8174) On Going
10 2105017531/LD/9498 (540 Construction of Boundary Protection wall for community Hall at Katuligre 95m) On Going
11 2105017531/RC/31032 (150 Construction of CC Jeepable road at Katuligre (351.50m) 2018-19) On Going
12 2105017531/RC/32197 (322 Construction of CC road Katuligre (Extension) (307.60m)18-19)) On Going
13 2105017531/RC/32708 (449 Improvement of village link road at Katuligre with 2nos of culverts 0.3 Km 2018-19) On Going
14 2105017531/RC/44757 (702 Construction of Cc Jeepable road from PWD road to Katuli Mosotigre 400 m) On Going
15 2105017531/RC/48426 (872 Improvement of road from PWD road to Katuli bil lennth 1.6 km) On Going
16 2105017531/RC/50296 (63 Improvement of road from Mosotigre to Katuli Bill at Katuligre Length 1.38 km) On Going
17 2105017531/RC/52334 (378 Construction of CC Jeepable road at Katuligre 352 m) On Going
18 2105017531/WC/14293 (350 Construction of contour Trenches at Katuligre 1.5m) On Going
19 2105017531/WC/27916 (Excavation of Dugout pond 1nos at Katuligre 2021 2022) On Going
20 2105017531/WC/6447 (26 Excavation of dug out pond 2nos at Katuligre (4112m3)) On Going

Download In Excel