Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 20-Sep-2021 01:47:57 PM 
Back  
DPR Frozen Status Report

S.No Work Name(Work Code) Work Status
1 2105017603/FR/1797 (396 Excavation of dug out pond 1nos at Hatibelpara songgital nokma gittim 1418.454) Completed
2 2105017603/LD/3869 (35 Improvement of LP school ground at Hatibelpara (1967.63m3)) Completed
3 2105017603/RC/22908 (188 Improvement of road from PWD road to Hatibelpara Songma gittim with 2nos of culverts) Completed
4 2105017603/RC/23435 (287 Improvement of road fro PWD road to WVR English school at Hatibelpara (7.0Km)) Completed
5 2105017603/WC/4504 (186 Const. of CC check dam at Wadro stream at Hatibelpara (125.933)) Completed
6 2105017603/WC/6443 (12 Construction of CC check Dam at Wadro Stream 2nos (133.44m3) ) Completed
7 2105017602/LD/10138 (176 B Construction of toe wall for road protectation at playgroun road length 85m) On Going
8 2105017603/DP/11756 (228 Catchment area protection activities Model norms for Afforestation with Pine/non Pine convergenc) On Going
9 2105017603/DP/20834 (Road Side Mango Plantation In Convergence With Horticulture Department At Hatibelpara Length Km 2.2) On Going
10 2105017603/IC/2344 (499 Construction of Lining minor for Community at Hatibelpara 529.93m3) On Going
11 2105017603/IC/2428 (751 Construction of Pucca lining minor canal for community at Hatibelpara Length 125m) On Going
12 2105017603/IC/2789 (33 Construction of minor earth canal at Hatibelpara) On Going
13 2105017603/LD/10139 (176 A Construction of toe wall for road protection at plaground road length 115.00m) On Going
14 2105017603/RC/27269 (6 Construction of CC footpath at Hatibelpara (201 m) 2018-19) On Going
15 2105017603/RC/30996 (142 Construction of Toe wall both side of road at Hatibelpara (30.40m) 2018-19) On Going
16 2105017603/RC/30997 (141 Construction of CC footpath at Hatibelpara (154.00m) 2018-19) On Going
17 2105017603/RC/31455 (206 Improvement of road from Hatibelpara to songgitcham with 2nos of culvert at Hatibelpara 1.8Km) ) On Going
18 2105017603/RC/36115 (801 Construction of cc footpath village link road to Songgitalgre at Hatibelpara length 250m) On Going
19 2105017603/WC/12632 (202 Construction Of Trench In Convergence With IBDLP 100Nos Hac As Per PWD Sor For Road And Bridges ) On Going
20 2105017603/WC/14492 (425 Construction of CC check dam at Hatibelpara lenght 15m) On Going
21 2105017603/WC/16197 (552 A Const. or cc Ringwell at Hatibelpara MGNREGA inconvergence with Megha LAMP 6.50m deep) On Going
22 2105017603/WC/16198 (552 B Const. of cc ringwell at Hatibelpara MGNREGA inconvergence with Megha LAMP 6.50m deep) On Going
23 2105017603/WC/20870 (922 Construction of kutcha bund at Hatibelpara 22.30m) On Going
24 2105017603/WC/21208 (34 Construction of kutcha bund at Hatibelpara length 25.44m) On Going
25 2105017704/RC/45782 (356 Construction of cc jeepable road from L.P. shcool junction to near Drengsan house 355m) On Going

Download In Excel