DPR Frozen Status Report

S.No Work Name(Work Code) Work Status
1 2105017673/DP/21048 (1 Road side Jackfruit Plantation at Damalgre with Technical support of Horticulture Department) Approved
2 2105017673/WC/28919 (A Construction of Spring Chamber at Sabbath Sangma Gittim in Damalgre) Approved
3 2105017673/WC/28920 (B Construction of Spring Chamber at Senggrang D Sangma Boldakgre Gittim in Damalgre) Approved
4 2105017673/WC/28921 (C Construction of Spring Chamber at Merunisha N Marak Boldakgre Gittim in Damalgre) Approved
5 2105017673/WC/28922 (D Construction of Spring Chamber at Menatsing Gittim in Damalgre) Approved
6 2105017673/WC/28923 (E Construction of Spring Chamber at Bollok D Sangma Gittim in Damalgre) Approved
7 2105017673/WC/28924 (F Construction of Spring Chamber at Sengkal K Sangma Gittim in Damalgre) Approved
8 2105017673/FR/1192 (61.Excavation of 2nos of Dug out pond at Damalgre 1958.276m3) Completed
9 2105017673/IF/25110 (196-(A) Excavation of Dug out pond at Damalgre 1-Nos (J.C No-5655) (442.359m3)) Completed
10 2105017673/IF/25115 (196-(B) Excavation of Dug out pond at Damalgre 1-Nos (J.C No-5647) (442.359m3)) Completed
11 2105017673/IF/25118 (196-(C) Exacavation of Dug out pond at Damalgre 1-Nos (J.C No-5660) (442.359m3)) Completed
12 2105017673/IF/25120 (196-(D) Excavation of Doug out pond at Damalgre 1-Nos (J.C No-5693) (442.359m3)) Completed
13 2105017673/LD/5755 (309 Improvement of Play ground with Protection wall at Damalgre. (4130.00m3)) Completed
14 2105017673/RC/15373 (203 Improvement of road from Damalgre to nagolpara gittim with retaining wall at damalgre (1.5Km)) Completed
15 2105017673/WC/4577 (267(6)Const. of Water Harvesting structure at Salmanpara in Convergence with water resources) Completed
16 2105017673/WC/8433 (444 Construction of RCC Water Tank 2-nos at Damalgre.(3.60mx2=7.2m)) Completed
17 2105017673/AV/3120 (53 Construction of rcc Anganwadi Centre in convergence with MGNREGA under Zikzak C&RD Block length 8) On Going
18 2105017673/RC/26846 (31.Construction of CC Footpath from PWD Road to Nokma gittim at Damalgre.(254.20m)(2018-19)) On Going
19 2105017673/RC/33444 (528 Construction of CC road from PWD road to Songmagittim at Damalgre.(165.50m)2018-19)) On Going
20 2105017673/RC/35722 (773 Construction of CC Jeepable Road from PWD road to Monjeng gittim at Damalgre Length 580 00m) On Going
21 2105017673/WC/13523 (324 Construction of gully plug erosin control at Damalgre ) On Going

Download In Excel