Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 19-Sep-2021 01:25:56 PM 
Back  
DPR Frozen Status Report

S.No Work Name(Work Code) Work Status
1 2105017513/FP/2456 (102. Construction of Kutcha Bund at Chibongbongre) Completed
2 2105017513/FP/4067 (6. Construction of CC Checkdam at Darapa stream at Chibongbonggre) Completed
3 2105017513/LD/5852 (354. Providing Boulder Sausage including earth filling at Chibongchibonggre (16.60m)) Completed
4 2105017513/RC/15443 (230. Construction of road from Banggal rama to Abagre with culvert at Chibongbonggre) Completed
5 2105017513/AV/3319 (397 Const Of Anganwadi Centre In Convergence with MGNREGA Under Zikzak C&RD Block 2020 2021) On Going
6 2105017513/DP/8393 (318. Arecanut Cultivation for 12-bigha at Chibongbonggre (Spacing:2.5x2.5m)) On Going
7 2105017513/LD/7109 (34. Construction of retaining wall with earth filling at Chibongbonggre (28.17m)) On Going
8 2105017513/LD/9581 (613 Construction of Retaining wall with Earth filling at Chibongbonggre length 27 00m) On Going
9 2105017513/RC/44357 (669 Construction of CC Jeepable road at Chibongbonggre length 220.00m) On Going
10 2105017513/RC/51942 (215 Improvement of road at Chibongbonggre length 0.5m) On Going
11 2105017513/RC/61678 (Construction of CC Jeepable road at Chibongbonggre 2021 2022) On Going
12 2105017513/WC/14675 (351- A Construction of Spring Chamber at Chibongbonggre 5 84m3) On Going
13 2105017513/WC/14682 (351-B Construction of Spring Chamber at Chibongbonggre 5 84m3) On Going
14 2105017513/WC/14684 (351-C Construction of Spring Chamber at Chibongbonggre 5 84m3) On Going
15 2105017513/WC/14686 (351-D Construction of Spring Chamber at Chibongbonggre 5 84m3) On Going
16 2105017513/WC/9236 (446. Construction of RCC water tank 1-nos at Chibongbonggre (4.00m)) On Going

Download In Excel