DPR Frozen Status Report

S.No Work Name(Work Code) Work Status
1 2105017559/FP/2617 (256.Improvement of road from Chepagre to Tallingre with retaining wall at Chepagre. ( 1.98 km)) Completed
2 2105017559/LD/3962 (117. Improvement of Community ground at Chepagre. (3102.84m3)) Completed
3 2105017559/RC/22864 (205 Construction of CC Footpath at Chepagre (415.00m)) Completed
4 2105017559/RC/30318 (452 Improvement of road from PWD road to Tallinggre via Abrenggitim at Chepagre.(1.8km)) Completed
5 2105017559/WC/6711 (314 Construction of CC Check dam at Chepagre Makbilkol stream (58.800m3)) Completed
6 2105017559/RC/26790 (484 Construction of CC Jeepable road at Chepatre (439.50m)2018-19) On Going
7 2105017559/RC/26795 (43.Construction of CC footpath from PWD road to Abrenggittim at Chepagre.(296.80m)(2018-19)) On Going
8 2105017559/RC/36086 (573 Construction of CC Jeepable road from Abrenggre to Nokma gittim at Chepagre length 400m) On Going
9 2105017559/RC/45317 (305 Construction of CC Jeepable road from PMGSY road to Gondu gittim at Chepaggre length 400m) On Going
10 2105017559/RC/48428 (876 Imrovement of road from Nokmagittim to ading at Chepagre Length 1 98km) On Going
11 2105017559/WC/15185 (494 Construction of Contour Trenches 100 nos per hac 10 hac at Chepagre) On Going
12 2105017559/WC/18385 (210 Construction of RCC spring chamber at Chepaggre MLAMP inconvergence with MGNREGA length 2 50m) On Going
13 2105017559/WC/21273 (26 Construction Of Contour Trenches 100Nos Per Hactres Asper PWD SOR For Road From And Bridge Length) On Going
14 2105017559/WC/27844 (A Construction Of Ringwell Apalgri Gittim At Chepagre 2021 2022) On Going
15 2105017559/WC/27845 (B Construction Of Ringwell Simsang Gittim At Chepagre 2021 2022) On Going
16 2105017559/WC/27847 (C Construction Of Ringwell At Songgitalgri Gittim At Chepagre 2021 2022) On Going
17 2105017559/WC/27848 (D Construction Of Ringwell Gondugre Gittim At Chepagre 2021 2022) On Going
18 2105017559/WC/27849 (E Construction Of Ringwell Bolsalgri Gittim At Chepagre 2021 2022) On Going
19 2105017559/WC/27850 (F Construction Of Ringwell Gimbilgri Gittim At Chepagre 2021 2022) On Going
20 2105017559/WC/27851 (G Construction Of Ringwell At Nokma Gittim At Chepagre 2021 2022) On Going
21 2105017559/WC/27852 (H Construction Of Ringwell At Adinggre Gittim At Chepagre 2021 2022) On Going
22 2105017694/RC/45467 (306 Construction of cc Jeepable road from PWD road to Sorok gittim at Chepagre Length 280m) On Going