DPR Frozen Status Report

S.No Work Name(Work Code) Work Status
1 2105017617/FP/4240 (292 Providing Boulder sausage including earth filling at jonjona stream (30.00m)) Completed
2 2105017617/FR/1287 (143 Excavation of Dug out pond at Boldam Akonggre (1696.212m3)) Completed
3 2105017617/RC/17834 (60 Improvement of road form Upper boldamgre to boldam Akonggre with culverts at Boldam Akonggre) Completed
4 2105017617/RC/22598 (137 Construction of road from Boldom Akonggre to Dangsapara with 1nos of culvert 1738m3) Completed
5 2105017617/WC/6458 (61 Excavation of Dug out pond at Boldam Akonggre (1567.55m3)) Completed
6 2105017581/RC/45481 (272 Construvtion of cc jeepable road at Boldam Akonggre 335m) On Going
7 2105017617/DP/20913 (Roadside Mango plantation at Boldam Akonggre with technical support of Horticulture department 1Km) On Going
8 2105017617/IF/46101 (746 SBM Waste collection from village Boldam Akonggre Rural sanitation for Debaloy Marak Jc 34093) On Going
9 2105017617/LD/10301 (819 Const of boundary protection wall with improv of ground for community at Boldam Akonggre lt 145m) On Going
10 2105017617/RC/31004 (144 Construction of cc Jeepabe road at Boldam Akonggre (260m) 2018-19) On Going
11 2105017617/RC/31561 (212 Construction of cc footpath cum step at Boldam Akonggre (230.50m) 2018-19) On Going
12 2105017617/RC/61224 (Construction of cc jeepable road at Boldam Akonggre 300 meter) On Going
13 2105017617/WC/15535 (487 A Construction of Ringwell at Boldam Akonggre 9.2316m3) On Going
14 2105017617/WC/15536 (487 B Construction of Ringwell at Boldam Akonggre 9.2316m3) On Going
15 2105017617/WC/15537 (487 C Construction of ringwell at Boldam Akonggre 9.2316m3) On Going
16 2105017617/WC/15538 (487 D Construction of Ringwell at Boldam Akonggre 9.2316m3) On Going
17 2105017617/WC/17338 (704 A Construction of spring chamber at Boldam Akonggre Length 3.50m) On Going
18 2105017617/WC/17339 (704 B Construction of spring camber at Boldam Akonggre Length 3.50m) On Going
19 2105017621/RC/46027 (128 Construction of road from Boldam Akonggre to Dangsapara length 420m) On Going