DPR Frozen Status Report

S.No Work Name(Work Code) Work Status
1 2105017573/FP/2615 (253. Providing boulder sausage including earth filling .At Bhoirakupi. (60.00 m).) Completed
2 2105017573/FP/3861 (436 Const. of Kutcha bund 2nos at Bhoirakupi) Completed
3 2105017573/IF/29200 (315. A Excavation of community dug out pond at 1nos at Bhoirakupi J. C No 7492 (3646.244) Completed
4 2105017573/IF/29205 (315. B Excavation of community dug out pond at 1nos at Bhoirakupi J. C No 7376 (3646.244)) Completed
5 2105017573/IF/33832 (541 Excavation of Dug out pond 1-Nos at Bhoirakupi.(J.C.No.7466)(3496.256m3)) Completed
6 2105017573/LD/5978 (414. Construction of retaining wall earth filling at Bhoirakupi (30.65m)) Completed
7 2105017573/RC/14617 (103.Construction of road from PWD road to School field via Beltuli (1.49km).) Completed
8 2105017573/RC/22880 (191 Improvement Of Road From PWD Road To Rakhaldubi Via Nolbari With 2 NOs Of Culverth) Completed
9 2105017573/RC/29605 (454 Construction of CC footpath at Bhoirakupi 0.150m) Completed
10 2105017573/WC/6490 (22 Construction of CC Checkdam at Bhairakupi(116.886m3)) Completed
11 2105017573/LD/10264 (827 Construction Of Retaining Wall For Erosion Control At Bhoirakupi Length 100 00M 2019 2020) On Going
12 2105017573/LD/7200 (233 Construction Of Retaining Wall With Earth Filling at Bhoirakupi. (63.05m) 2018-2019) On Going
13 2105017573/LD/7202 (234 Construction Of Brick Walling With RCC Post At Bhoirakupi SSA UP School L=(103m)(H=2.00m) 18-19 ) On Going
14 2105017573/LD/7402 (509 Construction Of Retaining Wall With Earth Filling At Bhoirakupi 44.78M 2018 2019) On Going
15 2105017573/LD/9533 (576 Construction Of Retaining Wall For Erosion Control At Bhoirakupi Length 60 00M 2019 2020) On Going
16 2105017573/RC/30843 (20. Construction Of CC Foothpath At Bhoirakupi 2018-2019) On Going
17 2105017573/RC/43064 (623 Construction Of CC Jeepable Road At From PWD Road To Rongkaigre River At Bhoirakupi Length 600M) On Going
18 2105017573/WC/13486 (360 Construction Of CC Checkdam At Bhoirakupi (6.35M) 2019 2020) On Going
19 2105017573/WC/16510 (580 A Construction Of Community Water Tank At Bhoirakupi Length 3 50M 2019 2020) On Going
20 2105017573/WC/16511 (580 B Construction Of Community Water Tank At Bhoirakupi Length 3 50M 2019 2020) On Going
21 2105017573/WC/19388 (780 A Construction Of Spring Chamber At Bhoirakupi Length 3 5M 2019 2020) On Going
22 2105017573/WC/19390 (780 B Construction Of Spring Chamber At Bhoirakupi Length 3 5M 2019 2020) On Going