DPR Frozen Status Report

S.No Work Name(Work Code) Work Status
1 2105017511/FP/4076 (11. Construction of Kutcha Bund with boulder pitching at Baksapara. (86.25)) Completed
2 2105017511/FR/1209 (68.Excavation of 3nos Dug out pond at Baksapara 1001.596m3) Completed
3 2105017511/LD/4228 (254. Improvement of Community ground with protection wall at Baksapara ) Completed
4 2105017511/LD/5686 (254. Improvement of School ground with Protaction wall at Baksapara. (4630.00m3)) Completed
5 2105017511/RC/25250 (408. Improvement of road from kusupara to chintakona with 1-nos of culverts at Baksapara (1.5km)) Completed
6 2105017511/DP/12004 (282 Catchment area Protection activities Model norms for Afforestation with Pine non pine Plant dens) On Going
7 2105017511/DP/16224 (211 Construction of Contour Trenches 100 nos per hac. as per PWD SOR for road and Bridge 10hac.) On Going
8 2105017511/DP/4150 (97. Community Arecanut Plantation at Baksapara (2Hec)) On Going
9 2105017511/LD/9590 (671 Construction of retaining wall with earth filling at Baksapara length 109 00m) On Going
10 2105017511/RC/30866 (123. Construction of CC Jeepable road at Baksapara (318.00m)) On Going
11 2105017511/RC/43104 (584 construction of CC Jeepable road at Baksapara (length 480m)) On Going
12 2105017511/RC/61352 (Construction of CC Jeepable road at Baksapara ( 500m)) On Going
13 2105017511/WC/13293 (262 Const of Trenches in Convergence with IBDLP 100nos hac6as per PWD SOR for Road and bridges 13-14) On Going
14 2105017511/WC/14988 (424 Construction of CC Check dam 15m at Baksapara ) On Going
15 2105017511/WC/22913 (278 Excavation of Dugout pound at Baksapra Jontila Marak J.C.No.6356 length 20.00m) On Going
16 2105017511/WC/22917 (274 Excavation of dug out pound at Baksapara Alena Marak J.C no. 6375 length 20.00m) On Going
17 2105017511/WC/23286 (412 B Construction of RCC Spring Chamber at Baksapara MLAMP in convergence with MGNREGA length 300m) On Going
18 2105017511/WC/23287 (412-A Construction of RCC Spring Chamber at Baksapara MLAMP in Convergence with MGNREGA length 300m) On Going