DPR Frozen Status Report

S.No Work Name(Work Code) Work Status
1 2105017595/RC/61880 (Construction of CC Jeepable road at Arakgittim ) Approved
2 2105017595/WC/22832 (259 Construction of RCC spring chamber at Arakgittim MLAMP Inconvergence with MLAMP length 2.50m) Approved
3 2105017595/DW/1207 (253. Construction of Community Ringwell 6-nos at Arakgittim (25.354m3×6=152.124m3)) Completed
4 2105017595/FP/2573 (206. Providing Boulder Sausage including Earth filling at Arakgittim) Completed
5 2105017595/FR/1204 (74.Excavation of 2nos of Dug out pond at Arakgittim (1973.128m3)) Completed
6 2105017595/FR/1817 (399 Excavation of dug out pond 1nos at Arakgittim1483.124m3) Completed
7 2105017595/RC/30303 (512. Improvement of road from PWD road to Arakgittim LP School at Arakgittim (0.97km)) Completed
8 2105017595/WC/6459 (49. Construction of RCC Water tank 4-Nos at Arakgittim (4.15m x 4=16.6m)) Completed
9 2105017595/DP/20666 (Road side mango plantation in Convergence with Horticulture Department at Arakgittim 2km) On Going
10 2105017595/DP/8383 (317. Road side Manggo Plantation 2-Km both side of the road at Arakgittim (Spacing:6m)) On Going
11 2105017595/LD/11765 (205 Improvement of Play ground at Arakgittim length 0.75m) On Going
12 2105017595/LD/8696 (620 Construction of retaining wall with earth filling at Arakgittim 29 85m) On Going
13 2105017595/RC/30772 (18. Construction of CC Foothpath at Arakgittim (134.90m)) On Going
14 2105017595/RC/32477 (362. Construction of CC road at Arakgittim 164.50m) On Going
15 2105017595/RC/43162 (582 Construction of CC Jeepable road at Arakgittim (length 500.00m)) On Going
16 2105017595/WC/14274 (366-A Construction of Community Water Tank at Arakgittim 14 00m3) On Going
17 2105017595/WC/14275 (366-B Construction of Community water tank at Arakgittim 14 00m3) On Going
18 2105017595/WC/14279 (366-C Construction of Community Water tank at Arakgittim 14 00m3) On Going
19 2105017595/WC/21436 (24 Const. of contour Trenches 100nos per Hactres as per PWD SOR for Road and Bridge length 1.50m 10.) On Going
20 2105017595/WC/22601 (277 Construction of retaining wall with earth filling at Arakgittim length 49.00m) On Going
21 2105017595/WC/23288 (259 Construction of RCC Spring Chamber at Arakgittim MLAMP in convergence with MLAMP length 2.50m) On Going
22 2105017595/WC/28091 (Construction of RCC Spring Chamber at Arakgittim ( A)) On Going
23 2105017595/WC/28137 (Construction of RCC Spring Chamber at Arakgittim (B)) On Going
24 2105017595/WC/28138 (Construction of RCC Spring Chamber at Arakgittim ( C)) On Going
25 2105017595/WC/28139 (Construction of RCC Spring Chamber at Arakgittim ( D)) On Going
26 2105017595/WC/28140 (Construction of RCC Spring Chamber at Arakgittim ( E)) On Going