Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Oct-2021 10:50:52 PM 
Back  
State: MEGHALAYA District: SOUTH WEST GARO HILLS Block: ZIKZAK Panchayat: RABIDASPARA II
Work Code: 2105017698/IC/2967 (Construction of pucca irrigation canal at Rabidaspara II)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2020-2021 Execution Level : GP
Execution Agency : Gram Panchayat (3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/4/2020 Work start date : 23/11/2020
Present status : Not Exist Proposed Status : Construction of minor Canal for Community
Tech Sanction Details
Technical Sanction No. : 2105017/2021-2022/6013/TS Sanction Date : 28/6/2021
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
798253.47 603251.2 6548.4 71169.06 0 0 0 681000 0 1479222.13
Financial Sanction Details
Financial\Administrative Sanction No: 2105017/2021-2022/6013/AS Financial\Administrative Sanction Date 30/6/2021
Fin. Sanc. Amt. (in Rs) NREGA:1479222 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1480000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement:6 coarse sand: 12 graded stone aggregate 20mm nominal size) up to plinth level with cement mortar 1:6 (1 cement: 6 coarse sand)487231.8347126.4
212 mm cement plaster of mix 1:4 (1 cement: 4 fine sand)9278.22503.8
3Earthwork in excavation for structures in foundation, sub structures, retaining walls, footings, plinth beams etc in ordinary soil by manual means upto 3 m depth60207.9212475.2
4Construction of embankment with approved materials obtained from borrow pits with a lift upto 1.5m transporting to site, spreading and grading to required slope and compacted etc346.5433.92150353.28
5Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering- All work upto plinth level: 1:2:4 (1 Cement: 2 Coarse sand: 4 graded stone aggregate 20mm nominal size) (where stone is locally available)127.57386.38941763.45
Total Activity 1455000
S.NoMaterialQuantityUnit PriceTotal
10367-Portland Cement46.64111200522379.2
210-Miscellaneous /Contingencies charges12000020000
32209-Cement46.64100
43-Display Board150005000
57753-Boulder 50 mm to 200 mm46.56120055872
69999-Sundries1866.5400
Total Material 604000