State: MEGHALAYA District: SOUTH WEST GARO HILLS Block: ZIKZAK Panchayat: CHELAPARA
Work Code: 2105017636/LD/7359 (423 B Construction of Toe Wall at Bokman Chiring at Chelapara 150.40m)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2018-2019 Execution Level : GP
Execution Agency : Gram Panchayat (3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/4/2018 Work start date : 28/9/2018
Present status : Not Exist Proposed Status : Constr of Stone peripheral Bund for Community
Tech Sanction Details
Technical Sanction No. : TS-8/zikzak/..456 B Sanction Date : 21/8/2018
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
543000 380000 0 0 0 0 0 380000 0 923000
Financial Sanction Details
Financial\Administrative Sanction No: ZDBM.179/MGNREGA/AS/18-19/423 B Financial\Administrative Sanction Date 28/9/2018
Fin. Sanc. Amt. (in Rs) NREGA:923000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
923000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work exavation in ordinary soil with all lead and lift including rough dressing and breaking of clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 m in depth as per direction of engineer in charge.1923000923000
Total Activity 923000
S.NoMaterialQuantityUnit PriceTotal
116 mm -  M.S. rod000
240 mm Metal000
3Bamboo000
4Binding wire000
5Boulder Stone000
6Bricks000
7Cement000
8Centering and Shuttering000
9Nail000
10Project Management Cost11800018000
11PVC pipes000
12River Sand000
13Signboard000
14Skilled Labour000
15Stone Chips000
16T.S rod -20mm000
17Transportation charges000
18VAT1362000362000
Total Material 380000