State: MEGHALAYA District: SOUTH WEST GARO HILLS Block: BETASING Panchayat: TALBARI
Work Code: 2105016695/RC/57039 (const. of cc jeepable road at village Talbari from bamboo bridges to church 100m. )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2020-2021 Execution Level : GP
Execution Agency : Gram Panchayat (3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 9/2/2021 Work start date : 12/2/2021
Present status : Cement concrete Proposed Status : Constr of Cement Concrete Roads for Comm
Tech Sanction Details
Technical Sanction No. : 2105016/2020-2021/2211/TS Sanction Date : 10/2/2021
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
256614.09 218348.9 0 39870.3 0 0 0 259000 0 514833.29
Financial Sanction Details
Financial\Administrative Sanction No: 2105016/2020-2021/2211/AS Financial\Administrative Sanction Date 15/2/2021
Fin. Sanc. Amt. (in Rs) NREGA:514833 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
515000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared6003.41042046.24
21:2:4 )1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size)307292.42218772.6
3Providing and laying stone soling of 100mm thickness on prepared earth surface of foundation, plinth walls, masonry walls etc30021564500
4Back filling behind abudments, wingwall and returnwall etc complete as per granular materials by manual means267460.81123036.27
5Earthwork in excavation for structures in foundation, sub structure, retaining walls, footings, plinth beams etc in ordinary rocks (not required blasting) by manual means upto 3 m depth267342.2691383.42
Total Activity 500000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper2.130546413.4
20012-Vibrator (Needle type 40 mm)2.110802268
30293-Stone Aggregate(single size): 40 mm nominal size15.6280043680
40295-Stone Aggregate(single size):20 mm nominal size6.6315020790
50297-Stone Aggregate(single size): 10 mm nominal size3.3332510972.5
60367-Portland Cement9.611200107520
70982-Coarse sand (zone III)13.356008010
810-Miscellaneous /Contingencies charges11009510095
92202-Stone aggregate below 40 mm nominal size9.900
102203-Coarse sand13.3500
112206-Stone aggregate 40 mm nominal size and above15.600
122209-Cement9.600
133-Display Board150005000
147753-Boulder 50 mm to 200 mm312003600
159999-Sundries405.600
Total Material 219000