S.No Name of Applicant Age Bank/Postoffice
1 Espal Rymbai Male 42
2 Obarnel rymbai Male 34
3 Bishar Rymbai Male 22 thadlaskein
4 Soverly Rymbai Female 50 State Bank of India


                  



S.No Name of Applicant
1 22418 Bishar Rymbai 06/10/2008~~11/10/2008~~6 6
2 22491 13/10/2008~~18/10/2008~~6 6
3 22720 20/10/2008~~25/10/2008~~6 6
4 22784 27/10/2008~~31/10/2008~~5 5
5 22930 03/11/2008~~08/11/2008~~6 6
6 23165 10/11/2008~~12/11/2008~~3 3
7 23222 17/11/2008~~22/11/2008~~6 6
8 37318 18/12/2008~~19/12/2008~~2 2
9 62690 Obarnel rymbai 07/12/2009~~12/12/2009~~6 6
10 62721 15/12/2009~~17/12/2009~~3 3
11 61582 Espal Rymbai 01/02/2010~~06/02/2010~~6 6
12 1112 01/04/2010~~02/04/2010~~2 2
13 1112 01/04/2010~~02/04/2010~~2 2
14 5486 09/04/2010~~11/04/2010~~3 3
15 5486 09/04/2010~~11/04/2010~~3 3
16 18224 Bishar Rymbai 01/05/2010~~06/05/2010~~6 6
17 18224 01/05/2010~~06/05/2010~~6 6
18 19428 08/05/2010~~13/05/2010~~6 6
19 19428 08/05/2010~~13/05/2010~~6 6
20 10338 Espal Rymbai 15/05/2010~~18/05/2010~~4 4
21 10338 15/05/2010~~18/05/2010~~4 4
22 13828 Obarnel rymbai 22/05/2010~~22/05/2010~~1 1
23 13828 22/05/2010~~22/05/2010~~1 1
24 26092 Bishar Rymbai 18/06/2010~~23/06/2010~~6 6
25 26092 18/06/2010~~23/06/2010~~6 6
26 26791 Espal Rymbai 25/06/2010~~30/07/2010~~36 6
27 26791 25/06/2010~~30/07/2010~~36 36
28 27901 Bishar Rymbai 19/07/2010~~20/07/2010~~2 2
29 27901 19/07/2010~~20/07/2010~~2 2
30 27624 Obarnel rymbai 19/07/2010~~24/07/2010~~6 6
31 27624 19/07/2010~~24/07/2010~~6 6
32 33697 Bishar Rymbai 26/07/2010~~31/07/2010~~6 6
33 33697 26/07/2010~~31/07/2010~~6 6
34 31029 Obarnel rymbai 26/07/2010~~31/07/2010~~6 6
35 31029 26/07/2010~~31/07/2010~~6 6
36 36332 Espal Rymbai 02/08/2010~~06/08/2010~~5 5
37 36332 02/08/2010~~06/08/2010~~5 5
38 46907 09/08/2010~~14/08/2010~~6 6
39 46907 09/08/2010~~14/08/2010~~6 6
40 46570 Bishar Rymbai 16/08/2010~~21/08/2010~~6 6
41 46570 16/08/2010~~21/08/2010~~6 6
42 56864 Espal Rymbai 21/09/2010~~26/09/2010~~6 6
43 56864 21/09/2010~~26/09/2010~~6 6
44 53793 Bishar Rymbai 04/10/2010~~09/10/2010~~6 6
45 53793 04/10/2010~~09/10/2010~~6 6
46 58015 11/10/2010~~16/10/2010~~6 6
47 58015 11/10/2010~~16/10/2010~~6 6
48 58290 18/10/2010~~21/10/2010~~4 4
49 58290 18/10/2010~~21/10/2010~~4 4
50 58761 08/11/2010~~13/11/2010~~6 6
51 58761 08/11/2010~~13/11/2010~~6 6
52 69128 15/11/2010~~20/11/2010~~6 6
53 69128 15/11/2010~~20/11/2010~~6 6
54 2282 04/04/2011~~06/04/2011~~3 3
55 1884 25/04/2011~~30/04/2011~~6 6
56 1918 02/05/2011~~08/05/2011~~7 6
57 12145 13/06/2011~~18/06/2011~~6 6
58 12304 20/06/2011~~26/06/2011~~7 6
59 12226 04/07/2011~~10/07/2011~~7 6
60 12213 11/07/2011~~16/07/2011~~6 6
61 27276 Obarnel rymbai 05/09/2011~~10/09/2011~~6 6
62 26552 Espal Rymbai 12/09/2011~~17/09/2011~~6 6
63 25293 Bishar Rymbai 05/10/2011~~10/10/2011~~6 6
64 45892 09/01/2012~~12/01/2012~~4 4
65 46553 16/01/2012~~21/01/2012~~6 6
66 47739 23/01/2012~~28/01/2012~~6 6
67 58523 13/02/2012~~18/02/2012~~6 6
68 58767 20/02/2012~~25/02/2012~~6 6
69 72814 27/02/2012~~04/03/2012~~7 7
70 71899 06/03/2012~~12/03/2012~~7 7
71 10390 09/06/2012~~15/06/2012~~7 7
72 10790 18/06/2012~~24/06/2012~~7 7
73 10096 26/06/2012~~30/06/2012~~5 5
74 12443 02/07/2012~~09/07/2012~~8 7
75 16778 10/07/2012~~16/07/2012~~7 7
76 16404 18/07/2012~~24/07/2012~~7 7
77 19669 01/08/2012~~07/08/2012~~7 7
78 19303 Obarnel rymbai 01/08/2012~~07/08/2012~~7 7
79 19594 Espal Rymbai 09/08/2012~~15/08/2012~~7 7
80 16428 Bishar Rymbai 16/07/2013~~23/07/2013~~8 7
81 17248 24/07/2013~~30/07/2013~~7 7
82 88183 08/01/2014~~14/01/2014~~7 7
83 89297 Obarnel rymbai 16/01/2014~~22/01/2014~~7 7
84 88877 Bishar Rymbai 24/01/2014~~30/01/2014~~7 7
85 9658 05/08/2014~~23/08/2014~~19 17
86 67180 Soverly Rymbai 04/10/2017~~19/10/2017~~16 14
87 122083 20/11/2018~~05/12/2018~~16 14
88 140171 14/12/2018~~29/12/2018~~16 14
89 151528 08/01/2019~~23/01/2019~~16 14
90 179789 04/02/2019~~19/02/2019~~16 14
91 105382 23/09/2019~~08/10/2019~~16 14
92 129263 15/10/2019~~30/10/2019~~16 14
93 193782 10/01/2020~~25/01/2020~~16 14
94 146826 15/10/2020~~30/10/2020~~16 14
95 175510 27/11/2020~~12/12/2020~~16 14
96 4656 22/04/2021~~07/05/2021~~16 14
97 248883 08/03/2022~~23/03/2022~~16 14
98 1302 07/04/2022~~22/04/2022~~16 14


S.No Name of Applicant Work Name
1 22418 Bishar Rymbai 06/10/2008~~11/10/2008~~6 6 Construction of Jeepable Road at Moodymmai
2 22491 13/10/2008~~18/10/2008~~6 6 Construction of Jeepable Road at Moodymmai
3 22720 20/10/2008~~25/10/2008~~6 6 Construction of Jeepable Road at Moodymmai
4 22784 27/10/2008~~31/10/2008~~5 5 Construction of Jeepable Road at Moodymmai
5 22930 03/11/2008~~08/11/2008~~6 6 Construction of Jeepable Road at Moodymmai
6 23165 10/11/2008~~12/11/2008~~3 3 Construction of Jeepable Road at Moodymmai
7 23222 17/11/2008~~22/11/2008~~6 6 Construction of Jeepable Road at Moodymmai
8 37318 18/12/2008~~19/12/2008~~2 2 Construction of Jeepable Road at Moodymmai
9 62690 Obarnel rymbai 07/12/2009~~12/12/2009~~6 6 Construction of Village Road at Modymmai
10 62721 15/12/2009~~17/12/2009~~3 3 Construction of Village Road at Modymmai
11 61582 Espal Rymbai 01/02/2010~~06/02/2010~~6 6 Construction of Village Road at Modymmai
12 1112 01/04/2010~~02/04/2010~~2 18 Construction of Footpath at Moodymmai
13 5486 09/04/2010~~11/04/2010~~3 27 Construction of Footpath at Moodymmai
14 18224 Bishar Rymbai 01/05/2010~~06/05/2010~~6 47 Construction of Village Road at Modymmai
15 19428 08/05/2010~~13/05/2010~~6 42 Construction of Village Road at Modymmai
16 10338 Espal Rymbai 15/05/2010~~18/05/2010~~4 36 Construction of Village Road at Modymmai
17 13828 Obarnel rymbai 22/05/2010~~22/05/2010~~1 9 Construction of Village Road at Modymmai
18 26092 Bishar Rymbai 18/06/2010~~23/06/2010~~6 36 Construction of Agri Link Road at Moodymmai
19 26791 Espal Rymbai 25/06/2010~~30/07/2010~~36 78 Construction of Agri Link Road at Moodymmai
20 27901 Bishar Rymbai 19/07/2010~~20/07/2010~~2 16 Construction of Agri Link Road at Moodymmai
21 27624 Obarnel rymbai 19/07/2010~~24/07/2010~~6 48 Construction of Agri Link Road at Moodymmai
22 33697 Bishar Rymbai 26/07/2010~~31/07/2010~~6 24 Construction of Agri Link Road at Moodymmai
23 31029 Obarnel rymbai 26/07/2010~~31/07/2010~~6 24 Construction of Agri Link Road at Moodymmai
24 36332 Espal Rymbai 02/08/2010~~06/08/2010~~5 20 Construction of Agri Link Road at Moodymmai
25 46907 09/08/2010~~14/08/2010~~6 12 Construction of Agri Link Road at Moodymmai
26 46570 Bishar Rymbai 16/08/2010~~21/08/2010~~6 12 Construction of Agri Link Road at Moodymmai
27 56864 Espal Rymbai 21/09/2010~~26/09/2010~~6 12 Construction of Fishery Pond at Moodymmai
28 53793 Bishar Rymbai 04/10/2010~~09/10/2010~~6 12 Construction of Fishery Pond at Moodymmai
29 58015 11/10/2010~~16/10/2010~~6 12 Construction of Fishery Pond at Moodymmai
30 58290 18/10/2010~~21/10/2010~~4 8 Construction of Fishery Pond at Moodymmai
31 58761 08/11/2010~~13/11/2010~~6 12 Construction of Fishery Pond at Moodymmai
32 69128 15/11/2010~~20/11/2010~~6 12 Construction of Fishery Pond at Moodymmai
33 2282 04/04/2011~~06/04/2011~~3 15 Construction of Fishery Pond at Moodymmai
34 1884 25/04/2011~~30/04/2011~~6 30 Construction of Fishery Pond at Moodymmai
35 1918 02/05/2011~~08/05/2011~~7 30 Construction of Fishery Pond at Moodymmai
36 12145 13/06/2011~~18/06/2011~~6 30 Construction of Fishery Pond at Moodymmai
37 12304 20/06/2011~~26/06/2011~~7 30 Construction of Fishery Pond at Moodymmai
38 12226 04/07/2011~~10/07/2011~~7 30 Construction of Fishery Pond at Moodymmai
39 12213 11/07/2011~~16/07/2011~~6 30 Construction of Fishery Pond at Moodymmai
40 27276 Obarnel rymbai 05/09/2011~~10/09/2011~~6 30 Construction of Village Road at Niriang
41 26552 Espal Rymbai 12/09/2011~~17/09/2011~~6 30 Construction of Village Road at Moodymmai
42 25293 Bishar Rymbai 05/10/2011~~10/10/2011~~6 24 Construction of Village Road at Moodymmai
43 45892 09/01/2012~~12/01/2012~~4 8 Construction of Internal Road at Moodymmai (Wah Sukha)
44 46553 16/01/2012~~21/01/2012~~6 12 Construction of Internal Road at Moodymmai (Wah Sukha)
45 47739 23/01/2012~~28/01/2012~~6 12 Construction of Internal Road at Moodymmai (Wah Sukha)
46 58523 13/02/2012~~18/02/2012~~6 6 Construction of Internal Road at Moodymmai (Wah Sukha)
47 58767 20/02/2012~~25/02/2012~~6 6 Construction of Internal Road at Moodymmai (Lum Sabah)
48 72814 27/02/2012~~04/03/2012~~7 7 Internal road at moodymmai
49 71899 06/03/2012~~12/03/2012~~7 14 Internal road at moodymmai
50 24585 09/06/2012~~15/06/2012~~7 20 Construction of Footpath at Moodymmai
51 25215 18/06/2012~~24/06/2012~~7 21 Construction of Footpath at Moodymmai
52 10096 26/06/2012~~30/06/2012~~5 30 Construction of Footpath at Moodymmai
53 12443 02/07/2012~~09/07/2012~~8 42 Construction of Footpath at Moodymmai
54 16778 10/07/2012~~16/07/2012~~7 26 Construction of Footpath at Moodymmai
55 16404 18/07/2012~~24/07/2012~~7 28 Construction of Footpath at Moodymmai
56 19669 01/08/2012~~07/08/2012~~7 28 Construction of Footpath at Moodymmai
57 19303 Obarnel rymbai 01/08/2012~~07/08/2012~~7 35 Bharat Nirman Rajeev Gandhi Sewa Kendra ,Moodymmai
58 19594 Espal Rymbai 09/08/2012~~15/08/2012~~7 28 Construction of Footpath at Moodymmai
59 16428 Bishar Rymbai 16/07/2013~~23/07/2013~~8 21 Construction of Fencing at Modymmai (2013-14)
60 17248 24/07/2013~~30/07/2013~~7 19 Construction of Fencing at Modymmai (2013-14)
61 88183 08/01/2014~~14/01/2014~~7 7 Construction of Fishery pond cum retaining wall at
62 89297 Obarnel rymbai 16/01/2014~~22/01/2014~~7 7 Construction of Fishery pond cum retaining wall at
63 88877 Bishar Rymbai 24/01/2014~~30/01/2014~~7 7 Construction of Fishery pond cum retaining wall at
64 9658 05/08/2014~~23/08/2014~~19 17 Construction of Fishery pond cum retaining wall at
65 67180 Soverly Rymbai 04/10/2017~~19/10/2017~~16 14 Construction of Drinking Well at Moodymmai 2015-16
66 122083 20/11/2018~~05/12/2018~~16 14 Construction of Side Drain at Moodymmai Lumwahsukha Two 201819
67 140171 14/12/2018~~29/12/2018~~16 14 Construction of Side Drain at Moodymmai Lumwahsukha Two 201819
68 151528 08/01/2019~~23/01/2019~~16 14 Construction of Side Drain at Moodymmai Lumwahsukha Two 201819
69 179789 04/02/2019~~19/02/2019~~16 14 Construction of Side Drain at Moodymmai Lumwahsukha Two 201819
70 105382 23/09/2019~~08/10/2019~~16 14 Construction of Side Drain at Moodymmai Lumwahsukha Two 201819
71 129263 15/10/2019~~30/10/2019~~16 14 Construction of Side Drain at Moodymmai Lumwahsukha Two 201819
72 193782 10/01/2020~~25/01/2020~~16 14 Construction of Side Drain at Moodymmai Lumwahsukha One 201819
73 146826 15/10/2020~~30/10/2020~~16 14 Construction of improvement of playfield at Moodymmai Phase I 2021
74 175510 27/11/2020~~12/12/2020~~16 14 Construction of improvement of playfield at Moodymmai Phase I 2021
75 4656 22/04/2021~~07/05/2021~~16 14 Construction of improvement of playfield at Moodymmai Phase I 2021
76 248883 08/03/2022~~23/03/2022~~16 14 Construction of Internal Cement Concrete Road at Moodymmai 2021-22
77 1302 07/04/2022~~22/04/2022~~16 14 Construction of Internal Cement Concrete Road at Moodymmai 2021-22


S.No Name of Applicant Work Name Total Amount of Work Done Payment Due
1 Bishar Rymbai 06/10/2008 6 Construction of Jeepable Road at Moodymmai 7453 420 0
2 Bishar Rymbai 13/10/2008 6 Construction of Jeepable Road at Moodymmai 7560 420 0
3 Bishar Rymbai 20/10/2008 6 Construction of Jeepable Road at Moodymmai 7582 420 0
4 Bishar Rymbai 27/10/2008 5 Construction of Jeepable Road at Moodymmai 7622 350 0
5 Bishar Rymbai 03/11/2008 6 Construction of Jeepable Road at Moodymmai 7630 420 0
6 Bishar Rymbai 10/11/2008 3 Construction of Jeepable Road at Moodymmai 7656 210 0
7 Bishar Rymbai 17/11/2008 6 Construction of Jeepable Road at Moodymmai 7679 420 0
8 Bishar Rymbai 18/12/2008 1 Construction of Jeepable Road at Moodymmai 7743 70 0
Sub Total FY 0809 39 2730 0
9 Obarnel rymbai 07/12/2009 6 Construction of Village Road at Modymmai 9470 600 0
10 Obarnel rymbai 15/12/2009 3 Construction of Village Road at Modymmai 9471 300 0
11 Espal Rymbai 01/02/2010 6 Construction of Village Road at Modymmai 16036 600 0
Sub Total FY 0910 15 1500 0
12 Espal Rymbai 01/04/2010 2 Construction of Footpath at Moodymmai 23267 200 0
13 Espal Rymbai 09/04/2010 3 Construction of Footpath at Moodymmai 23304 300 0
14 Bishar Rymbai 01/05/2010 2 Construction of Village Road at Modymmai 50 200 0
15 Bishar Rymbai 03/05/2010 3 Construction of Village Road at Modymmai 24363 300 0
16 Bishar Rymbai 06/05/2010 1 Construction of Village Road at Modymmai 53 100 0
17 Bishar Rymbai 08/05/2010 2 Construction of Village Road at Modymmai 25865 200 0
18 Bishar Rymbai 10/05/2010 3 Construction of Village Road at Modymmai 60 300 0
19 Bishar Rymbai 13/05/2010 1 Construction of Village Road at Modymmai 68 100 0
20 Espal Rymbai 15/05/2010 4 Construction of Village Road at Modymmai 25988 400 0
21 Obarnel rymbai 22/05/2010 1 Construction of Village Road at Modymmai 26040 100 0
22 Bishar Rymbai 18/06/2010 6 Construction of Agri Link Road at Moodymmai 28115 600 0
23 Espal Rymbai 25/06/2010 2 Construction of Agri Link Road at Moodymmai 98 200 0
24 Espal Rymbai 27/06/2010 4 Construction of Agri Link Road at Moodymmai 26312 400 0
25 Espal Rymbai 12/07/2010 6 Construction of Agri Link Road at Moodymmai 28192 600 0
26 Bishar Rymbai 19/07/2010 2 Construction of Agri Link Road at Moodymmai 28197 200 0
27 Espal Rymbai 19/07/2010 6 Construction of Agri Link Road at Moodymmai 28200 600 0
28 Obarnel rymbai 19/07/2010 6 Construction of Agri Link Road at Moodymmai 28157 600 0
29 Bishar Rymbai 26/07/2010 6 Construction of Agri Link Road at Moodymmai 26351 600 0
30 Obarnel rymbai 26/07/2010 6 Construction of Agri Link Road at Moodymmai 29934 600 0
31 Espal Rymbai 02/08/2010 5 Construction of Agri Link Road at Moodymmai 26369 500 0
32 Espal Rymbai 09/08/2010 6 Construction of Agri Link Road at Moodymmai 26579 600 0
33 Bishar Rymbai 16/08/2010 6 Construction of Agri Link Road at Moodymmai 33752 600 0
34 Espal Rymbai 21/09/2010 6 Construction of Fishery Pond at Moodymmai 26619 600 0
35 Bishar Rymbai 04/10/2010 6 Construction of Fishery Pond at Moodymmai 33060 600 0
36 Bishar Rymbai 11/10/2010 6 Construction of Fishery Pond at Moodymmai 39874 600 0
37 Bishar Rymbai 18/10/2010 4 Construction of Fishery Pond at Moodymmai 39883 400 0
Sub Total FY 1011 105 10500 0
38 Bishar Rymbai 04/04/2011 3 Construction of Fishery Pond at Moodymmai 54557 300 0
39 Bishar Rymbai 25/04/2011 6 Construction of Fishery Pond at Moodymmai 54603 600 0
40 Bishar Rymbai 02/05/2011 6 Construction of Fishery Pond at Moodymmai 54611 600 0
41 Bishar Rymbai 13/06/2011 6 Construction of Fishery Pond at Moodymmai 54625 702 0
42 Bishar Rymbai 20/06/2011 6 Construction of Fishery Pond at Moodymmai 54631 702 0
43 Bishar Rymbai 04/07/2011 6 Construction of Fishery Pond at Moodymmai 54637 702 0
44 Bishar Rymbai 11/07/2011 6 Construction of Fishery Pond at Moodymmai 54948 702 0
45 Obarnel rymbai 05/09/2011 6 Construction of Village Road at Niriang 57214 702 0
46 Espal Rymbai 12/09/2011 6 Construction of Village Road at Moodymmai 59839 702 0
47 Bishar Rymbai 09/01/2012 4 Construction of Internal Road at Moodymmai (Wah Sukha) 72014 468 0
48 Bishar Rymbai 16/01/2012 6 Construction of Internal Road at Moodymmai (Wah Sukha) 60054 702 0
49 Bishar Rymbai 23/01/2012 6 Construction of Internal Road at Moodymmai (Wah Sukha) 72054 702 0
50 Bishar Rymbai 13/02/2012 6 Construction of Internal Road at Moodymmai (Wah Sukha) 72525 702 0
51 Bishar Rymbai 20/02/2012 6 Construction of Internal Road at Moodymmai (Lum Sabah) 73733 702 0
52 Bishar Rymbai 27/02/2012 7 Internal road at moodymmai 73766 819 0
53 Bishar Rymbai 06/03/2012 7 Internal road at moodymmai 74957 819 0
Sub Total FY 1112 93 10626 0
54 Bishar Rymbai 09/06/2012 7 Construction of Footpath at Moodymmai 78520 896 0
55 Bishar Rymbai 18/06/2012 7 Construction of Footpath at Moodymmai 87622 896 0
56 Bishar Rymbai 26/06/2012 5 Construction of Footpath at Moodymmai 87655 640 0
57 Bishar Rymbai 02/07/2012 7 Construction of Footpath at Moodymmai 88069 896 0
58 Bishar Rymbai 10/07/2012 7 Construction of Footpath at Moodymmai 88101 896 0
59 Bishar Rymbai 18/07/2012 7 Construction of Footpath at Moodymmai 92830 896 0
60 Bishar Rymbai 01/08/2012 7 Construction of Footpath at Moodymmai 92862 896 0
61 Obarnel rymbai 01/08/2012 7 Bharat Nirman Rajeev Gandhi Sewa Kendra ,Moodymmai 87594 896 0
62 Espal Rymbai 09/08/2012 7 Construction of Footpath at Moodymmai 92892 896 0
Sub Total FY 1213 61 7808 0
63 Bishar Rymbai 16/07/2013 7 Construction of Fencing at Modymmai (2013-14) 116412 1015 0
64 Bishar Rymbai 24/07/2013 7 Construction of Fencing at Modymmai (2013-14) 116439 1015 0
65 Bishar Rymbai 08/01/2014 7 Construction of Fishery pond cum retaining wall at 136199 1015 0
66 Obarnel rymbai 16/01/2014 7 Construction of Fishery pond cum retaining wall at 136248 1015 0
67 Bishar Rymbai 24/01/2014 7 Construction of Fishery pond cum retaining wall at 136272 1015 0
Sub Total FY 1314 35 5075 0
68 Bishar Rymbai 05/08/2014 10 Construction of Fishery pond cum retaining wall at 9 1530 0
69 Bishar Rymbai 16/08/2014 7 Construction of Fishery pond cum retaining wall at 51 1071 0
Sub Total FY 1415 17 2601 0
70 Soverly Rymbai 04/10/2017 13 Construction of Drinking Well at Moodymmai 2015-16 1752 2275 0
Sub Total FY 1718 13 2275 0
71 Soverly Rymbai 20/11/2018 14 Construction of Side Drain at Moodymmai Lumwahsukha Two 201819 4438 2534 0
72 Soverly Rymbai 14/12/2018 14 Construction of Side Drain at Moodymmai Lumwahsukha Two 201819 5280 2534 0
73 Soverly Rymbai 08/01/2019 14 Construction of Side Drain at Moodymmai Lumwahsukha Two 201819 5823 2534 0
74 Soverly Rymbai 04/02/2019 14 Construction of Side Drain at Moodymmai Lumwahsukha Two 201819 6473 2534 0
Sub Total FY 1819 56 10136 0
75 Soverly Rymbai 15/10/2019 14 Construction of Side Drain at Moodymmai Lumwahsukha Two 201819 4246 2618 0
76 Soverly Rymbai 10/01/2020 8 Construction of Side Drain at Moodymmai Lumwahsukha One 201819 7049 1496 0
Sub Total FY 1920 22 4114 0
77 Soverly Rymbai 15/10/2020 6 Construction of improvement of playfield at Moodymmai Phase I 2021 4104 1218 0
78 Soverly Rymbai 27/11/2020 14 Construction of improvement of playfield at Moodymmai Phase I 2021 4998 2842 0
Sub Total FY 2021 20 4060 0
79 Soverly Rymbai 22/04/2021 14 Construction of improvement of playfield at Moodymmai Phase I 2021 472 3164 0
80 Soverly Rymbai 08/03/2022 14 Construction of Internal Cement Concrete Road at Moodymmai 2021-22 10408 3164 0
Sub Total FY 2122 28 6328 0
81 Soverly Rymbai 07/04/2022 10 Construction of Internal Cement Concrete Road at Moodymmai 2021-22 75 2300 0
Sub Total FY 2223 10 2300 0