Back

Job card
MAHATMA GANDHI NATIONAL RURAL EMPLOYMENT GUARANTEE ACT
Job card No.: MG-01-006-031-002/100 Family-Id: 100
Name of Head of Household: AINAM POHLONG
Name of Father/Husband: BELL SYNGKREM
Category: ST
Date of Registration: 7/15/2008
Address:
Villages:
Panchayat: Shnongpdeng
Block: AMLAREM
District: WEST JAINTIA HILLS(MEGHALAYA)
: NO Family-Id: 100
Epic No.:
Details of the Applicants of the household willing to work
S.No Name of Applicant Gender Age Bank/Postoffice
1 AIMAM POHLONG Female 24 DAWKI
2 BADLUCK LYMBA Male 21 DAWKI
3 SMT AINAM POHLONG Female 29 Meghalaya Co-operative Apex Bank


Signature/Thumb impression of Applicant
                  
Seal & Signature of Registering Authority

Requested Period of Employment

S.No Name of Applicant Month & Date from which employment requested No of Days
1 4892 AIMAM POHLONG 18/05/2009~~29/05/2009~~12 12
2 5024 BADLUCK LYMBA 01/06/2009~~14/06/2009~~14 14
3 12357 AIMAM POHLONG 01/07/2009~~14/07/2009~~14 14
4 12488 17/07/2009~~29/07/2009~~13 13
5 8643 01/09/2009~~07/09/2009~~7 7
6 11231 BADLUCK LYMBA 09/09/2009~~15/09/2009~~7 7
7 11362 17/09/2009~~23/09/2009~~7 7
8 1421 AIMAM POHLONG 01/04/2010~~07/04/2010~~7 7
9 99120 01/04/2010~~07/04/2010~~7 7
10 1871 08/04/2010~~14/04/2010~~7 7
11 99241 08/04/2010~~14/04/2010~~7 7
12 9299 06/09/2010~~12/09/2010~~7 7
13 108078 06/09/2010~~12/09/2010~~7 7
14 11327 14/09/2010~~20/09/2010~~7 7
15 111983 14/09/2010~~20/09/2010~~7 7
16 11919 22/09/2010~~28/09/2010~~7 7
17 112117 22/09/2010~~28/09/2010~~7 7
18 16431 30/09/2010~~13/10/2010~~14 14
19 113676 30/09/2010~~13/10/2010~~14 14
20 17537 14/10/2010~~20/10/2010~~7 7
21 116276 14/10/2010~~20/10/2010~~7 7
22 19206 21/10/2010~~27/10/2010~~7 7
23 116916 21/10/2010~~27/10/2010~~7 7
24 20413 01/11/2010~~07/11/2010~~7 7
25 117946 01/11/2010~~07/11/2010~~7 7
26 22156 14/12/2010~~27/12/2010~~14 14
27 119058 14/12/2010~~27/12/2010~~14 14
28 27948 01/01/2011~~14/01/2011~~14 14
29 1450 01/04/2011~~16/04/2011~~16 14
30 26764 05/12/2011~~20/12/2011~~16 14
31 31479 02/01/2012~~17/01/2012~~16 14
32 31613 16/02/2012~~02/03/2012~~16 14
33 5295 02/04/2012~~17/04/2012~~16 14
34 23644 02/04/2012~~15/04/2012~~14 14
35 6707 23/04/2012~~08/05/2012~~16 14
36 12939 11/10/2012~~18/10/2012~~8 7
37 3456 18/05/2013~~24/05/2013~~7 6
38 117819 SMT AINAM POHLONG 05/03/2015~~20/03/2015~~16 14
39 28623 01/05/2015~~01/06/2015~~32 28
40 36871 04/06/2015~~05/06/2015~~2 2
41 52884 02/11/2015~~17/11/2015~~16 14
42 56636 18/11/2015~~03/12/2015~~16 14
43 68601 14/12/2015~~15/12/2015~~2 2
44 88980 10/11/2016~~23/11/2016~~14 12
45 35640 04/08/2017~~24/08/2017~~21 18
46 64690 26/09/2017~~20/11/2017~~56 48
47 121750 29/01/2018~~01/03/2018~~32 28
48 143791 12/03/2018~~22/03/2018~~11 10
49 18723 07/05/2018~~15/05/2018~~9 8
50 174277 BADLUCK LYMBA 30/01/2019~~23/02/2019~~25 22
51 174278 SMT AINAM POHLONG 30/01/2019~~24/02/2019~~26 23
52 91276 04/09/2019~~05/10/2019~~32 28
53 131849 16/10/2019~~09/11/2019~~25 22
54 83515 05/08/2020~~05/09/2020~~32 28
55 123119 14/09/2020~~15/10/2020~~32 28
56 166376 12/11/2020~~13/12/2020~~32 28
57 221621 19/01/2021~~08/02/2021~~21 18

Period and Work on which Employment Offered

S.No Name of Applicant Month & Date from which employment requested No of Days Work Name
1 4892 AIMAM POHLONG 18/05/2009~~29/05/2009~~12 48 Const of C.C Footpath at Shnongpdeng
2 5024 BADLUCK LYMBA 01/06/2009~~14/06/2009~~14 45 Const of C.C Footpath at Shnongpdeng
3 12357 AIMAM POHLONG 01/07/2009~~14/07/2009~~14 38 Const of C.C Footpath at Shnongpdeng
4 12488 17/07/2009~~29/07/2009~~13 40 Const of C.C Footpath at Shnongpdeng
5 8643 01/09/2009~~07/09/2009~~7 28 Const of C.C Footpath at Shnongpdeng
6 11231 BADLUCK LYMBA 09/09/2009~~15/09/2009~~7 28 Const of C.C Footpath at Shnongpdeng
7 11362 17/09/2009~~23/09/2009~~7 28 Const of C.C Footpath at Shnongpdeng
8 99120 AIMAM POHLONG 01/04/2010~~07/04/2010~~7 7 Const of C.C Footpath at Shnongpdeng
9 99241 08/04/2010~~14/04/2010~~7 7 Const of C.C Footpath at Shnongpdeng
10 108078 06/09/2010~~12/09/2010~~7 7 Construction of R/Wall at Shnongpdeng
11 111983 14/09/2010~~20/09/2010~~7 7 Construction of R/Wall at Shnongpdeng
12 112117 22/09/2010~~28/09/2010~~7 7 Construction of R/Wall at Shnongpdeng
13 113676 30/09/2010~~13/10/2010~~14 14 Construction of R/Wall at Shnongpdeng
14 116276 14/10/2010~~20/10/2010~~7 7 Construction of R/Wall at Shnongpdeng
15 116916 21/10/2010~~27/10/2010~~7 7 Construction of R/Wall at Shnongpdeng
16 117946 01/11/2010~~07/11/2010~~7 7 Construction of R/Wall at Shnongpdeng
17 119058 14/12/2010~~27/12/2010~~14 14 Construction of R/Wall at Shnongpdeng
18 27948 01/01/2011~~14/01/2011~~14 83 Construction of R/Wall at Shnongpdeng
19 1450 01/04/2011~~16/04/2011~~16 37 Construction of R/Wall at Shnongpdeng
20 26764 05/12/2011~~20/12/2011~~16 44 Construction of R/Wall at Shnongpdeng
21 31479 02/01/2012~~17/01/2012~~16 34 Construction of R/Wall at Shnongpdeng
22 31613 16/02/2012~~02/03/2012~~16 34 Construction of R/Wall at Shnongpdeng
23 5295 02/04/2012~~17/04/2012~~16 42 Construction of R/Wall at Shnongpdeng
24 23644 02/04/2012~~15/04/2012~~14 32 Construction of R/Wall at Shnongpdeng
25 6707 23/04/2012~~08/05/2012~~16 41 Construction of R/Wall at Shnongpdeng
26 12939 11/10/2012~~18/10/2012~~8 42 Construction of R/Wall at Shnongpdeng
27 3456 18/05/2013~~24/05/2013~~7 24 Construction of R/Wall at Shnongpdeng
28 117819 SMT AINAM POHLONG 05/03/2015~~20/03/2015~~16 14 Constructin of Retaining Wall at shnongpdeng Vec
29 28623 01/05/2015~~01/06/2015~~32 28 Construction of R/Wall at Shnongpdeng Vec Phase - II Length=0.650 M
30 36871 04/06/2015~~05/06/2015~~2 2 Construction of R/Wall at Shnongpdeng Vec Phase - II Length=0.650 M
31 52884 02/11/2015~~17/11/2015~~16 14 Construction of R/Wall ( Erosion Control ) Length=650 M at Shnongpdeng Vec PH-III FY=2015-16
32 56636 18/11/2015~~03/12/2015~~16 14 Construction of R/Wall ( Erosion Control ) Length=650 M at Shnongpdeng Vec PH-III FY=2015-16
33 68601 14/12/2015~~15/12/2015~~2 2 Construction of R/Wall ( Erosion Control ) Length=650 M at Shnongpdeng Vec PH-III FY=2015-16
34 88980 10/11/2016~~23/11/2016~~14 12 Const of R/W PH-IV at Shongpdeng VEC L= 210 m W/O 2016-17/119
35 35640 04/08/2017~~24/08/2017~~21 18 Constn of Anganwadi Centre at Shnongpdeng VEC (S. East) Convergence with ICDS W/O 2017-18/AWC-2
36 64690 26/09/2017~~20/11/2017~~56 48 Construction of R/Wall PH- VI at Shnongpdeng Vec L:380 M FY:2017-18/FP-53
37 121750 29/01/2018~~01/03/2018~~32 28 Construction of Retaining Wall at Shnongpdeng VEC Ph VIII Length - 432 WO: 2017-18/FP-103
38 143791 12/03/2018~~22/03/2018~~11 10 Construction of Retaining Wall at Shnongpdeng VEC Ph VIII Length - 432 WO: 2017-18/FP-103
39 18723 07/05/2018~~15/05/2018~~9 8 Constn of Anganwadi Centre at Shnongpdeng VEC (S. East) Convergence with ICDS W/O 2017-18/AWC-2
40 174277 BADLUCK LYMBA 30/01/2019~~23/02/2019~~25 22 Construction of R Wall cum fencing PH II at Shnongpdeng VEC L 123m WO 2018 19 FP 114
41 174278 SMT AINAM POHLONG 30/01/2019~~24/02/2019~~26 23 Construction of R Wall cum fencing PH II at Shnongpdeng VEC L 123m WO 2018 19 FP 114
42 91276 04/09/2019~~05/10/2019~~32 28 Construction of Piggery shed and Soak pit A 112.2msq at Shnongpdeng VEC WO 2019 20 IF 43519
43 131849 16/10/2019~~09/11/2019~~25 22 Construction of Piggery shed and Soak pit A 112.2msq at Shnongpdeng VEC WO 2019 20 IF 43519
44 83515 05/08/2020~~05/09/2020~~32 28 Construction of R Wall Ph V at Shnongpdeng VEC WO 2020 21 FP 10263
45 123119 14/09/2020~~15/10/2020~~32 28 Construction of R Wall Ph V at Shnongpdeng VEC WO 2020 21 FP 10263
46 166376 12/11/2020~~13/12/2020~~32 28 Construction of R Wall Ph V at Shnongpdeng VEC WO 2020 21 FP 10263
47 221621 19/01/2021~~08/02/2021~~21 18 Construction of R Wall Ph V at Shnongpdeng VEC WO 2020 21 FP 10263

Period and Work on which Employment Given

S.No Name of Applicant Month & Date from which employment requested No of Days Work Name MSR No. Total Amount of Work Done Payment Due
1 AIMAM POHLONG 18/05/2009 12 Const of C.C Footpath at Shnongpdeng 8286 840 0
2 BADLUCK LYMBA 01/06/2009 14 Const of C.C Footpath at Shnongpdeng 8380 980 0
3 AIMAM POHLONG 01/07/2009 14 Const of C.C Footpath at Shnongpdeng 8611 980 0
4 AIMAM POHLONG 17/07/2009 13 Const of C.C Footpath at Shnongpdeng 8519 910 0
5 AIMAM POHLONG 01/09/2009 7 Const of C.C Footpath at Shnongpdeng 12458 700 0
6 BADLUCK LYMBA 09/09/2009 7 Const of C.C Footpath at Shnongpdeng 8717 700 0
7 BADLUCK LYMBA 17/09/2009 7 Const of C.C Footpath at Shnongpdeng 12754 700 0
Sub Total FY 0910 74 5810 0
8 AIMAM POHLONG 01/04/2010 7 Const of C.C Footpath at Shnongpdeng 21666 700 0
9 AIMAM POHLONG 08/04/2010 4 Const of C.C Footpath at Shnongpdeng 21680 400 0
10 AIMAM POHLONG 06/09/2010 7 Construction of R/Wall at Shnongpdeng 30902 700 0
11 AIMAM POHLONG 14/09/2010 7 Construction of R/Wall at Shnongpdeng 38693 700 0
12 AIMAM POHLONG 22/09/2010 7 Construction of R/Wall at Shnongpdeng 38707 700 0
13 AIMAM POHLONG 30/09/2010 14 Construction of R/Wall at Shnongpdeng 38963 1400 0
14 AIMAM POHLONG 14/10/2010 7 Construction of R/Wall at Shnongpdeng 41858 700 0
15 AIMAM POHLONG 21/10/2010 7 Construction of R/Wall at Shnongpdeng 41982 700 0
16 AIMAM POHLONG 01/11/2010 7 Construction of R/Wall at Shnongpdeng 42236 700 0
17 AIMAM POHLONG 14/12/2010 14 Construction of R/Wall at Shnongpdeng 44146 1400 0
18 AIMAM POHLONG 01/01/2011 14 Construction of R/Wall at Shnongpdeng 44414 1400 1400
Sub Total FY 1011 95 9500 1400
19 AIMAM POHLONG 05/12/2011 14 Construction of R/Wall at Shnongpdeng 62340 1638 0
20 AIMAM POHLONG 02/01/2012 14 Construction of R/Wall at Shnongpdeng 9119 1638 0
21 AIMAM POHLONG 16/02/2012 15 Construction of R/Wall at Shnongpdeng 9132 1755 0
Sub Total FY 1112 43 5031 0
22 AIMAM POHLONG 02/04/2012 14 Construction of R/Wall at Shnongpdeng 83541 1638 0
23 AIMAM POHLONG 23/04/2012 14 Construction of R/Wall at Shnongpdeng 86271 1638 0
24 AIMAM POHLONG 11/10/2012 7 Construction of R/Wall at Shnongpdeng 102216 819 0
Sub Total FY 1213 35 4095 0
25 AIMAM POHLONG 18/05/2013 6 Construction of R/Wall at Shnongpdeng 102460 870 0
Sub Total FY 1314 6 870 0
26 SMT AINAM POHLONG 05/03/2015 7 Constructin of Retaining Wall at shnongpdeng Vec 147266 1071 0
27 SMT AINAM POHLONG 13/03/2015 7 Constructin of Retaining Wall at shnongpdeng Vec 148573 1071 0
Sub Total FY 1415 14 2142 0
28 SMT AINAM POHLONG 01/05/2015 14 Construction of R/Wall at Shnongpdeng Vec Phase - II Length=0.650 M 1108 2282 0
29 SMT AINAM POHLONG 17/05/2015 14 Construction of R/Wall at Shnongpdeng Vec Phase - II Length=0.650 M 1132 2282 0
30 SMT AINAM POHLONG 04/06/2015 2 Construction of R/Wall at Shnongpdeng Vec Phase - II Length=0.650 M 1563 326 0
31 SMT AINAM POHLONG 02/11/2015 14 Construction of R/Wall ( Erosion Control ) Length=650 M at Shnongpdeng Vec PH-III FY=2015-16 2433 2282 0
32 SMT AINAM POHLONG 18/11/2015 14 Construction of R/Wall ( Erosion Control ) Length=650 M at Shnongpdeng Vec PH-III FY=2015-16 2502 2282 0
33 SMT AINAM POHLONG 14/12/2015 2 Construction of R/Wall ( Erosion Control ) Length=650 M at Shnongpdeng Vec PH-III FY=2015-16 2931 326 0
Sub Total FY 1516 60 9780 0
34 SMT AINAM POHLONG 10/11/2016 12 Const of R/W PH-IV at Shongpdeng VEC L= 210 m W/O 2016-17/119 3626 2028 0
Sub Total FY 1617 12 2028 0
35 SMT AINAM POHLONG 04/08/2017 14 Constn of Anganwadi Centre at Shnongpdeng VEC (S. East) Convergence with ICDS W/O 2017-18/AWC-2 1924 2450 0
36 SMT AINAM POHLONG 26/09/2017 14 Construction of R/Wall PH- VI at Shnongpdeng Vec L:380 M FY:2017-18/FP-53 3788 2450 0
37 SMT AINAM POHLONG 12/10/2017 14 Construction of R/Wall PH- VI at Shnongpdeng Vec L:380 M FY:2017-18/FP-53 3798 2450 0
38 SMT AINAM POHLONG 28/10/2017 14 Construction of R/Wall PH- VI at Shnongpdeng Vec L:380 M FY:2017-18/FP-53 4282 2450 0
39 SMT AINAM POHLONG 13/11/2017 6 Construction of R/Wall PH- VI at Shnongpdeng Vec L:380 M FY:2017-18/FP-53 4292 1050 0
40 SMT AINAM POHLONG 29/01/2018 14 Construction of Retaining Wall at Shnongpdeng VEC Ph VIII Length - 432 WO: 2017-18/FP-103 6032 2450 0
41 SMT AINAM POHLONG 14/02/2018 14 Construction of Retaining Wall at Shnongpdeng VEC Ph VIII Length - 432 WO: 2017-18/FP-103 6042 2450 0
42 SMT AINAM POHLONG 12/03/2018 10 Construction of Retaining Wall at Shnongpdeng VEC Ph VIII Length - 432 WO: 2017-18/FP-103 6801 1750 0
Sub Total FY 1718 100 17500 0
43 SMT AINAM POHLONG 07/05/2018 8 Constn of Anganwadi Centre at Shnongpdeng VEC (S. East) Convergence with ICDS W/O 2017-18/AWC-2 479 1448 0
44 BADLUCK LYMBA 30/01/2019 14 Construction of R Wall cum fencing PH II at Shnongpdeng VEC L 123m WO 2018 19 FP 114 5275 2534 0
45 SMT AINAM POHLONG 30/01/2019 14 Construction of R Wall cum fencing PH II at Shnongpdeng VEC L 123m WO 2018 19 FP 114 5275 2534 0
46 BADLUCK LYMBA 30/01/2019 8 Construction of R Wall cum fencing PH II at Shnongpdeng VEC L 123m WO 2018 19 FP 114 5291 1448 0
47 SMT AINAM POHLONG 30/01/2019 9 Construction of R Wall cum fencing PH II at Shnongpdeng VEC L 123m WO 2018 19 FP 114 5291 1629 0
Sub Total FY 1819 53 9593 0
48 SMT AINAM POHLONG 04/09/2019 14 Construction of Piggery shed and Soak pit A 112.2msq at Shnongpdeng VEC WO 2019 20 IF 43519 1195 2618 0
49 SMT AINAM POHLONG 20/09/2019 14 Construction of Piggery shed and Soak pit A 112.2msq at Shnongpdeng VEC WO 2019 20 IF 43519 1197 2618 0
50 SMT AINAM POHLONG 16/10/2019 14 Construction of Piggery shed and Soak pit A 112.2msq at Shnongpdeng VEC WO 2019 20 IF 43519 2508 2618 0
51 SMT AINAM POHLONG 01/11/2019 8 Construction of Piggery shed and Soak pit A 112.2msq at Shnongpdeng VEC WO 2019 20 IF 43519 2510 1496 0
Sub Total FY 1920 50 9350 0
52 SMT AINAM POHLONG 05/08/2020 13 Construction of R Wall Ph V at Shnongpdeng VEC WO 2020 21 FP 10263 1931 2639 0
53 SMT AINAM POHLONG 21/08/2020 14 Construction of R Wall Ph V at Shnongpdeng VEC WO 2020 21 FP 10263 1933 2842 0
54 SMT AINAM POHLONG 14/09/2020 14 Construction of R Wall Ph V at Shnongpdeng VEC WO 2020 21 FP 10263 3007 2842 0
55 SMT AINAM POHLONG 30/09/2020 14 Construction of R Wall Ph V at Shnongpdeng VEC WO 2020 21 FP 10263 3009 2842 0
56 SMT AINAM POHLONG 12/11/2020 14 Construction of R Wall Ph V at Shnongpdeng VEC WO 2020 21 FP 10263 4488 2842 0
57 SMT AINAM POHLONG 28/11/2020 13 Construction of R Wall Ph V at Shnongpdeng VEC WO 2020 21 FP 10263 4490 2639 0
58 SMT AINAM POHLONG 19/01/2021 14 Construction of R Wall Ph V at Shnongpdeng VEC WO 2020 21 FP 10263 6184 2842 0
59 SMT AINAM POHLONG 04/02/2021 4 Construction of R Wall Ph V at Shnongpdeng VEC WO 2020 21 FP 10263 6186 812 0
Sub Total FY 2021 100 20300 0