Back

Job card
MAHATMA GANDHI NATIONAL RURAL EMPLOYMENT GUARANTEE ACT
Job card No.: MG-01-006-024-003/83 Family Id: 83
Name of Head of Household: SHRI SOL POHSHNA
Name of Father/Husband: P LITING
Category: ST
Date of Registration: 8/20/2007
Address: 83
Villages:
Panchayat: Padu Masku
Block: AMLAREM
District: WEST JAINTIA HILLS(MEGHALAYA)
Whether BPL Family: NO Family Id: 83
Epic No.:
Details of the Applicants of the household willing to work
S.No Name of Applicant Gender Age Bank/Postoffice
1 SOI POHSHNA Male 43
2 SHNGAIN KHONGLAD Male 22
3 SMT BAHDU KHONGLAH Female 40 Meghalaya Co-operative Apex Bank
4 SHRI SOL POHSHNA Male 43 Meghalaya Co-operative Apex Bank


Signature/Thumb impression of Applicant
                  
Seal & Signature of Registering Authority

Requested Period of Employment

S.No Demand Id Name of Applicant Month & Date from which employment requested No of Days
1 7001 SHNGAIN KHONGLAD 06/09/2010~~12/09/2010~~7 7
2 100266 06/09/2010~~12/09/2010~~7 7
3 7407 SOI POHSHNA 22/07/2011~~29/07/2011~~8 7
4 13059 09/08/2011~~16/08/2011~~8 7
5 19277 03/10/2011~~10/10/2011~~8 7
6 11483 02/08/2012~~05/08/2012~~4 4
7 2192 10/07/2013~~25/07/2013~~16 14
8 63713 SMT BAHDU KHONGLAH 19/10/2015~~03/11/2015~~16 14
9 70306 14/12/2015~~29/12/2015~~16 14
10 76078 06/01/2016~~08/01/2016~~3 3
11 101156 24/02/2016~~10/03/2016~~16 14
12 614 28/04/2016~~05/05/2016~~8 7
13 21298 11/08/2016~~26/08/2016~~16 14
14 30126 29/08/2016~~22/09/2016~~25 22
15 58126 30/09/2016~~30/09/2016~~1 1
16 83409 07/11/2016~~08/12/2016~~32 28
17 109806 21/12/2016~~31/12/2016~~11 10
18 155030 SHRI SOL POHSHNA 02/03/2017~~23/03/2017~~22 19
19 19521 SMT BAHDU KHONGLAH 21/06/2017~~24/06/2017~~4 4
20 22136 29/06/2017~~21/07/2017~~23 20
21 65001 27/09/2017~~10/10/2017~~14 12
22 92071 04/12/2017~~04/01/2018~~32 28
23 126876 06/02/2018~~09/03/2018~~32 28
24 154122 21/03/2018~~29/03/2018~~9 8
25 25825 24/05/2018~~04/07/2018~~42 36
26 160623 SHRI SOL POHSHNA 15/01/2019~~12/02/2019~~29 25
27 160622 SMT BAHDU KHONGLAH 15/01/2019~~12/02/2019~~29 25
28 80631 SHRI SOL POHSHNA 22/08/2019~~22/09/2019~~32 28
29 127305 14/10/2019~~07/11/2019~~25 22
30 197602 13/01/2020~~13/02/2020~~32 28
31 246372 19/02/2020~~14/03/2020~~25 22
32 61745 20/07/2020~~20/08/2020~~32 28
33 135867 24/09/2020~~25/10/2020~~32 28
34 154870 27/10/2020~~24/11/2020~~29 25
35 277105 04/03/2021~~12/03/2021~~9 8
36 85244 27/09/2021~~03/10/2021~~7 6
37 122314 10/11/2021~~11/12/2021~~32 28
38 153202 14/12/2021~~29/12/2021~~16 14
39 167072 05/01/2022~~14/01/2022~~10 9

Period and Work on which Employment Offered

S.No Demand Id Name of Applicant Month & Date from which employment requested No of Days Work Name
1 100266 SHNGAIN KHONGLAD 06/09/2010~~12/09/2010~~7 7 Const of C.C Footpath at Padumasku
2 7407 SOI POHSHNA 22/07/2011~~29/07/2011~~8 34 const of rcc footpath at Padubad
3 13059 09/08/2011~~16/08/2011~~8 32 const of rcc footpath at Padubad
4 19277 03/10/2011~~10/10/2011~~8 27 const of rcc footpath at Padubad
5 11483 02/08/2012~~05/08/2012~~4 24 const of rcc footpath at Padubad
6 2192 10/07/2013~~25/07/2013~~16 49 2101006024/WC/39
7 63713 SMT BAHDU KHONGLAH 19/10/2015~~03/11/2015~~16 14 CONSTRUCTION OF SIDE DRAIN LENGTH=1440M PH- I AT PADUBAH VEC FY : 2015-16
8 70306 14/12/2015~~29/12/2015~~16 14 CONSTRUCTION OF SIDE DRAIN LENGTH=1440M PH- I AT PADUBAH VEC FY : 2015-16
9 76078 06/01/2016~~08/01/2016~~3 3 CONSTRUCTION OF SIDE DRAIN LENGTH=1440M PH- I AT PADUBAH VEC FY : 2015-16
10 101156 24/02/2016~~10/03/2016~~16 14 Construction of drainage at padubah Vec L= 1055 M PH-II FY 2015-16/124
11 614 28/04/2016~~05/05/2016~~8 7 Construction of drainage at padubah Vec L= 1055 M PH-II FY 2015-16/124
12 21298 11/08/2016~~26/08/2016~~16 14 Const.internal road at Padubah VEC L= 690 m R/W= 450 m & Culvert 16 nos FY 2016-17/57
13 30126 29/08/2016~~22/09/2016~~25 22 Const.internal road at Padubah VEC L= 690 m R/W= 450 m & Culvert 16 nos FY 2016-17/57
14 58126 30/09/2016~~30/09/2016~~1 1 Const.internal road at Padubah VEC L= 690 m R/W= 450 m & Culvert 16 nos FY 2016-17/57
15 83409 07/11/2016~~08/12/2016~~32 28 Construction of Earthern Road (Internal) at Padu Bah Vec PH-II W/O 2016-17/13
16 109806 21/12/2016~~31/12/2016~~11 10 Construction of Earthern Road (Internal) at Padu Bah Vec PH-II W/O 2016-17/13
17 155030 SHRI SOL POHSHNA 02/03/2017~~23/03/2017~~22 19 Const of Side Drain along with 10 Nos culvert at Padubah VEC L= 1299.70 m W/O 2016-17/174
18 19521 SMT BAHDU KHONGLAH 21/06/2017~~24/06/2017~~4 4 Roadside Tree Plantation at Padubah VEC L= 1.89 Km W/O 2017-18/DP 42
19 22136 29/06/2017~~21/07/2017~~23 20 Construction of Side Drain at PadubahVEC PH-II L=1858 m W/O 2017-18/FP-17
20 65001 27/09/2017~~10/10/2017~~14 12 Cnstruction of R/Wall Ph-I at Padubah VEC L=360 m W/O 2017-18/FP-47
21 92071 04/12/2017~~04/01/2018~~32 28 Construction of R Wall Ph II at Padubah VEC 2017-18
22 126876 06/02/2018~~09/03/2018~~32 28 Construction of Check Dam at Padubah VEC Length 14 m WO:2017-18/WC-25
23 154122 21/03/2018~~29/03/2018~~9 8 Construction of Check Dam at Padubah VEC Length 14 m WO:2017-18/WC-25
24 25825 24/05/2018~~04/07/2018~~42 36 Construction of Drainage PH-III at Padu Bah Vec L=133 Mtrs /2018-19/FP-3
25 160623 SHRI SOL POHSHNA 15/01/2019~~12/02/2019~~29 25 Construction of 8 Nos Piggery Sheds & Soak Pit at Padubah VEC WO 2018 19 IF 59
26 160622 SMT BAHDU KHONGLAH 15/01/2019~~12/02/2019~~29 25 Construction of 8 Nos Piggery Sheds & Soak Pit at Padubah VEC WO 2018 19 IF 59
27 80631 SHRI SOL POHSHNA 22/08/2019~~22/09/2019~~32 28 Construction of Compound Fencing at Padubah VEC PH V L 290 m WO 2019 20 FP 6836
28 127305 14/10/2019~~07/11/2019~~25 22 Construction of Compound Fencing at Padubah VEC PH V L 290 m WO 2019 20 FP 6836
29 197602 13/01/2020~~13/02/2020~~32 28 Construction of Compound Fencing L 430m at Padubah VEC WO 2019 20 FP 8565
30 246372 19/02/2020~~14/03/2020~~25 22 Construction of Compound Fencing L 430m at Padubah VEC WO 2019 20 FP 8565
31 61745 20/07/2020~~20/08/2020~~32 28 Construction of Compound Fencing at Padubah VEC WO 2020 21
32 135867 24/09/2020~~25/10/2020~~32 28 Construction of Compound Fencing at Padubah VEC WO 2020 21
33 154870 27/10/2020~~24/11/2020~~29 25 Construction of Compound Fencing at Padubah VEC WO 2020 21
34 277105 04/03/2021~~12/03/2021~~9 8 Construction of Check Dam convergence with MBDA at Padu Bah VEC WO 2020 21
35 85244 27/09/2021~~03/10/2021~~7 6 Improvement of Community Pond Ph I WO 2021 22
36 122314 10/11/2021~~11/12/2021~~32 28 Construction of C C Motorable Road at Padubah VEC WO 2021 22
37 153202 14/12/2021~~29/12/2021~~16 14 Construction of C C Motorable Road at Padubah VEC WO 2021 22
38 167072 05/01/2022~~14/01/2022~~10 9 Construction of C C Motorable Road at Padubah VEC WO 2021 22

Period and Work on which Employment Given

S.No Name of Applicant Month & Date from which employment requested No of Days Work Name MSR No. Total Amount of Work Done Payment Due
1 SHNGAIN KHONGLAD 06/09/2010 6 Const of C.C Footpath at Padumasku 22080 600 0
Sub Total FY 1011 6 600 0
2 SOI POHSHNA 22/07/2011 7 const of rcc footpath at Padubad 45714 819 0
3 SOI POHSHNA 09/08/2011 7 const of rcc footpath at Padubad 44446 700 0
4 SOI POHSHNA 03/10/2011 7 const of rcc footpath at Padubad 65641 700 0
Sub Total FY 1112 21 2219 0
5 SOI POHSHNA 02/08/2012 4 const of rcc footpath at Padubad 86907 512 0
Sub Total FY 1213 4 512 0
6 SOI POHSHNA 10/07/2013 14 2101006024/WC/39 109432 2030 0
Sub Total FY 1314 14 2030 0
7 SMT BAHDU KHONGLAH 19/10/2015 14 CONSTRUCTION OF SIDE DRAIN LENGTH=1440M PH- I AT PADUBAH VEC FY : 2015-16 2754 2282 0
8 SMT BAHDU KHONGLAH 14/12/2015 13 CONSTRUCTION OF SIDE DRAIN LENGTH=1440M PH- I AT PADUBAH VEC FY : 2015-16 3053 2119 0
9 SMT BAHDU KHONGLAH 06/01/2016 3 CONSTRUCTION OF SIDE DRAIN LENGTH=1440M PH- I AT PADUBAH VEC FY : 2015-16 3360 489 0
10 SMT BAHDU KHONGLAH 24/02/2016 14 Construction of drainage at padubah Vec L= 1055 M PH-II FY 2015-16/124 4693 2282 0
Sub Total FY 1516 44 7172 0
11 SMT BAHDU KHONGLAH 28/04/2016 7 Construction of drainage at padubah Vec L= 1055 M PH-II FY 2015-16/124 71 1183 0
12 SMT BAHDU KHONGLAH 11/08/2016 13 Const.internal road at Padubah VEC L= 690 m R/W= 450 m & Culvert 16 nos FY 2016-17/57 1158 2197 0
13 SMT BAHDU KHONGLAH 29/08/2016 14 Const.internal road at Padubah VEC L= 690 m R/W= 450 m & Culvert 16 nos FY 2016-17/57 1659 2366 0
14 SMT BAHDU KHONGLAH 14/09/2016 8 Const.internal road at Padubah VEC L= 690 m R/W= 450 m & Culvert 16 nos FY 2016-17/57 1691 1352 0
15 SMT BAHDU KHONGLAH 30/09/2016 1 Const.internal road at Padubah VEC L= 690 m R/W= 450 m & Culvert 16 nos FY 2016-17/57 2524 169 0
16 SMT BAHDU KHONGLAH 07/11/2016 14 Construction of Earthern Road (Internal) at Padu Bah Vec PH-II W/O 2016-17/13 3452 2366 0
17 SMT BAHDU KHONGLAH 23/11/2016 14 Construction of Earthern Road (Internal) at Padu Bah Vec PH-II W/O 2016-17/13 3484 2366 0
18 SMT BAHDU KHONGLAH 21/12/2016 10 Construction of Earthern Road (Internal) at Padu Bah Vec PH-II W/O 2016-17/13 4275 1690 0
19 SHRI SOL POHSHNA 02/03/2017 14 Const of Side Drain along with 10 Nos culvert at Padubah VEC L= 1299.70 m W/O 2016-17/174 5530 2366 0
20 SHRI SOL POHSHNA 18/03/2017 5 Const of Side Drain along with 10 Nos culvert at Padubah VEC L= 1299.70 m W/O 2016-17/174 5562 845 0
Sub Total FY 1617 100 16900 0
21 SMT BAHDU KHONGLAH 21/06/2017 4 Roadside Tree Plantation at Padubah VEC L= 1.89 Km W/O 2017-18/DP 42 827 700 0
22 SMT BAHDU KHONGLAH 29/06/2017 14 Construction of Side Drain at PadubahVEC PH-II L=1858 m W/O 2017-18/FP-17 1112 2450 0
23 SMT BAHDU KHONGLAH 15/07/2017 6 Construction of Side Drain at PadubahVEC PH-II L=1858 m W/O 2017-18/FP-17 1141 1050 0
24 SMT BAHDU KHONGLAH 27/09/2017 12 Cnstruction of R/Wall Ph-I at Padubah VEC L=360 m W/O 2017-18/FP-47 3835 2100 0
25 SMT BAHDU KHONGLAH 04/12/2017 14 Construction of R Wall Ph II at Padubah VEC 2017-18 5025 2450 0
26 SMT BAHDU KHONGLAH 20/12/2017 14 Construction of R Wall Ph II at Padubah VEC 2017-18 5039 2450 0
27 SMT BAHDU KHONGLAH 06/02/2018 14 Construction of Check Dam at Padubah VEC Length 14 m WO:2017-18/WC-25 6207 2450 0
28 SMT BAHDU KHONGLAH 22/02/2018 14 Construction of Check Dam at Padubah VEC Length 14 m WO:2017-18/WC-25 6214 2450 0
29 SMT BAHDU KHONGLAH 21/03/2018 8 Construction of Check Dam at Padubah VEC Length 14 m WO:2017-18/WC-25 7006 1400 0
Sub Total FY 1718 100 17500 0
30 SMT BAHDU KHONGLAH 24/05/2018 14 Construction of Drainage PH-III at Padu Bah Vec L=133 Mtrs /2018-19/FP-3 840 2534 0
31 SMT BAHDU KHONGLAH 09/06/2018 13 Construction of Drainage PH-III at Padu Bah Vec L=133 Mtrs /2018-19/FP-3 846 2353 0
32 SMT BAHDU KHONGLAH 24/06/2018 9 Construction of Drainage PH-III at Padu Bah Vec L=133 Mtrs /2018-19/FP-3 1036 1629 0
33 SHRI SOL POHSHNA 15/01/2019 14 Construction of 8 Nos Piggery Sheds & Soak Pit at Padubah VEC WO 2018 19 IF 59 4403 2534 0
34 SMT BAHDU KHONGLAH 15/01/2019 14 Construction of 8 Nos Piggery Sheds & Soak Pit at Padubah VEC WO 2018 19 IF 59 4403 2534 0
35 SHRI SOL POHSHNA 31/01/2019 11 Construction of 8 Nos Piggery Sheds & Soak Pit at Padubah VEC WO 2018 19 IF 59 4405 1991 0
36 SMT BAHDU KHONGLAH 31/01/2019 11 Construction of 8 Nos Piggery Sheds & Soak Pit at Padubah VEC WO 2018 19 IF 59 4405 1991 0
Sub Total FY 1819 86 15566 0
37 SHRI SOL POHSHNA 22/08/2019 14 Construction of Compound Fencing at Padubah VEC PH V L 290 m WO 2019 20 FP 6836 980 2618 0
38 SHRI SOL POHSHNA 07/09/2019 14 Construction of Compound Fencing at Padubah VEC PH V L 290 m WO 2019 20 FP 6836 991 2618 0
39 SHRI SOL POHSHNA 14/10/2019 14 Construction of Compound Fencing at Padubah VEC PH V L 290 m WO 2019 20 FP 6836 2294 2618 0
40 SHRI SOL POHSHNA 30/10/2019 8 Construction of Compound Fencing at Padubah VEC PH V L 290 m WO 2019 20 FP 6836 2305 1496 0
41 SHRI SOL POHSHNA 13/01/2020 14 Construction of Compound Fencing L 430m at Padubah VEC WO 2019 20 FP 8565 5025 2618 0
42 SHRI SOL POHSHNA 29/01/2020 14 Construction of Compound Fencing L 430m at Padubah VEC WO 2019 20 FP 8565 5035 2618 0
43 SHRI SOL POHSHNA 19/02/2020 14 Construction of Compound Fencing L 430m at Padubah VEC WO 2019 20 FP 8565 6894 2618 0
44 SHRI SOL POHSHNA 06/03/2020 8 Construction of Compound Fencing L 430m at Padubah VEC WO 2019 20 FP 8565 6904 1496 0
Sub Total FY 1920 100 18700 0
45 SHRI SOL POHSHNA 20/07/2020 14 Construction of Compound Fencing at Padubah VEC WO 2020 21 1290 2842 0
46 SHRI SOL POHSHNA 05/08/2020 14 Construction of Compound Fencing at Padubah VEC WO 2020 21 1332 2842 0
47 SHRI SOL POHSHNA 24/09/2020 14 Construction of Compound Fencing at Padubah VEC WO 2020 21 3347 2842 0
48 SHRI SOL POHSHNA 10/10/2020 13 Construction of Compound Fencing at Padubah VEC WO 2020 21 3353 2639 0
49 SHRI SOL POHSHNA 27/10/2020 14 Construction of Compound Fencing at Padubah VEC WO 2020 21 4020 2842 0
50 SHRI SOL POHSHNA 12/11/2020 11 Construction of Compound Fencing at Padubah VEC WO 2020 21 4026 2233 0
51 SHRI SOL POHSHNA 04/03/2021 8 Construction of Check Dam convergence with MBDA at Padu Bah VEC WO 2020 21 7564 1624 0
Sub Total FY 2021 88 17864 0
52 SHRI SOL POHSHNA 27/09/2021 6 Improvement of Community Pond Ph I WO 2021 22 894 1356 0
53 SHRI SOL POHSHNA 10/11/2021 14 Construction of C C Motorable Road at Padubah VEC WO 2021 22 1959 3164 0
54 SHRI SOL POHSHNA 26/11/2021 14 Construction of C C Motorable Road at Padubah VEC WO 2021 22 1976 3164 0
55 SHRI SOL POHSHNA 14/12/2021 13 Construction of C C Motorable Road at Padubah VEC WO 2021 22 2669 2938 0
56 SHRI SOL POHSHNA 05/01/2022 9 Construction of C C Motorable Road at Padubah VEC WO 2021 22 3293 2034 0
Sub Total FY 2122 56 12656 0