Back

Job card
MAHATMA GANDHI NATIONAL RURAL EMPLOYMENT GUARANTEE ACT
Job card No.: MG-01-006-021-004/74 Family Id: 74
Name of Head of Household: Lisong Pohlong
Name of Father/Husband: L. Amdep
Category: ST
Date of Registration: 8/20/2007
Address: 74
Villages:
Panchayat: Nongbareh Lyntiar
Block: AMLAREM
District: WEST JAINTIA HILLS(MEGHALAYA)
Whether BPL Family: NO Family Id: 74
Epic No.:
Details of the Applicants of the household willing to work
S.No Name of Applicant Gender Age Bank/Postoffice
1 Lisong Pohlong Female 38 Meghalaya Co-operative Apex Bank
2 Dep Pohlong Male 58 Meghalaya Co-operative Apex Bank


Signature/Thumb impression of Applicant
                  
Seal & Signature of Registering Authority

Requested Period of Employment

S.No Demand Id Name of Applicant Month & Date from which employment requested No of Days
1 12979 Lisong Pohlong 01/06/2009~~14/06/2009~~14 14
2 17210 17/09/2009~~23/09/2009~~7 7
3 18074 05/10/2009~~11/10/2009~~7 7
4 938 Dep Pohlong 22/05/2010~~04/06/2010~~14 14
5 100120 22/05/2010~~04/06/2010~~14 14
6 2120 08/06/2010~~21/06/2010~~14 14
7 101279 08/06/2010~~21/06/2010~~14 14
8 2679 Lisong Pohlong 24/06/2010~~30/06/2010~~7 7
9 103064 24/06/2010~~30/06/2010~~7 7
10 8077 Dep Pohlong 20/07/2010~~02/08/2010~~14 14
11 104523 20/07/2010~~02/08/2010~~14 14
12 14108 21/08/2010~~03/09/2010~~14 14
13 109274 21/08/2010~~03/09/2010~~14 14
14 14273 07/09/2010~~12/09/2010~~6 6
15 109409 07/09/2010~~12/09/2010~~6 6
16 2548 Lisong Pohlong 16/05/2011~~31/05/2011~~16 14
17 7618 01/06/2011~~08/06/2011~~8 7
18 12032 17/06/2011~~24/06/2011~~8 7
19 13274 25/06/2011~~10/07/2011~~16 14
20 9485 15/07/2011~~22/07/2011~~8 7
21 10141 23/07/2011~~30/07/2011~~8 7
22 14679 01/08/2011~~08/08/2011~~8 7
23 17420 09/08/2011~~24/08/2011~~16 14
24 27157 06/02/2012~~21/02/2012~~16 14
25 27317 22/02/2012~~26/02/2012~~5 5
26 3115 02/04/2013~~09/04/2013~~8 7
27 3921 10/04/2013~~25/04/2013~~16 14
28 124236 16/10/2014~~18/10/2014~~3 3
29 122501 20/01/2015~~11/02/2015~~23 20
30 94201 28/11/2016~~13/12/2016~~16 14
31 120152 12/01/2017~~27/01/2017~~16 14
32 150362 23/02/2017~~11/03/2017~~17 15
33 22468 03/07/2017~~13/07/2017~~11 10
34 35411 07/08/2017~~21/09/2017~~46 40
35 95770 11/12/2017~~25/01/2018~~46 40
36 121199 29/01/2018~~29/01/2018~~1 1
37 150553 16/03/2018~~26/03/2018~~11 10
38 3734 04/04/2018~~04/04/2018~~1 1
39 41644 10/07/2018~~25/07/2018~~16 14
40 89061 01/10/2018~~16/10/2018~~16 14
41 101184 17/10/2018~~01/11/2018~~16 14
42 112949 08/11/2018~~16/11/2018~~9 8
43 61477 29/07/2019~~13/08/2019~~16 14
44 85526 28/08/2019~~28/09/2019~~32 28
45 117195 03/10/2019~~11/10/2019~~9 8
46 142230 29/10/2019~~02/11/2019~~5 5
47 168907 29/11/2019~~30/12/2019~~32 28
48 202547 15/01/2020~~05/02/2020~~22 19
49 19732 19/05/2020~~19/06/2020~~32 28
50 39748 22/06/2020~~16/07/2020~~25 22
51 161666 06/11/2020~~07/12/2020~~32 28
52 200110 04/01/2021~~28/01/2021~~25 22
53 13129 13/05/2021~~26/05/2021~~14 12
54 99519 12/10/2021~~12/11/2021~~32 28
55 125008 15/11/2021~~01/12/2021~~17 15
56 155965 16/12/2021~~16/01/2022~~32 28
57 183969 18/01/2022~~31/01/2022~~14 12
58 201260 03/02/2022~~10/02/2022~~8 7

Period and Work on which Employment Offered

S.No Demand Id Name of Applicant Month & Date from which employment requested No of Days Work Name
1 12979 Lisong Pohlong 01/06/2009~~14/06/2009~~14 24 Const of Road at Nongbarehrim
2 17210 17/09/2009~~23/09/2009~~7 19 Const of Road at Nongbarehrim
3 18074 05/10/2009~~11/10/2009~~7 20 Const of Road at Nongbarehrim
4 100120 Dep Pohlong 22/05/2010~~04/06/2010~~14 14 Construction of Drainage at Nongbarehrim
5 101279 08/06/2010~~21/06/2010~~14 14 Construction of Drainage at Nongbarehrim
6 103064 Lisong Pohlong 24/06/2010~~30/06/2010~~7 7 Construction of Drainage at Nongbarehrim
7 104523 Dep Pohlong 20/07/2010~~02/08/2010~~14 14 Construction of Drainage at Nongbarehrim
8 109274 21/08/2010~~03/09/2010~~14 14 Construction of Drainage at Nongbarehrim
9 109409 07/09/2010~~12/09/2010~~6 6 Construction of Drainage at Nongbarehrim
10 2548 Lisong Pohlong 16/05/2011~~31/05/2011~~16 37 Const of Road at Nongbarehrim
11 7618 01/06/2011~~08/06/2011~~8 34 Const of Road at Nongbarehrim
12 12032 17/06/2011~~24/06/2011~~8 31 Const of Road at Nongbarehrim
13 13274 25/06/2011~~10/07/2011~~16 41 Const of Road at Nongbarehrim
14 9485 15/07/2011~~22/07/2011~~8 27 Const of Road at Nongbarehrim
15 10141 23/07/2011~~30/07/2011~~8 34 Const of Road at Nongbarehrim
16 14679 01/08/2011~~08/08/2011~~8 39 Const of Road at Nongbarehrim
17 17420 09/08/2011~~24/08/2011~~16 36 Const of Road at Nongbarehrim
18 27157 06/02/2012~~21/02/2012~~16 51 Const of Road at Nongbarehrim
19 27317 22/02/2012~~26/02/2012~~5 25 Const of Road at Nongbarehrim
20 3115 02/04/2013~~09/04/2013~~8 35 Const of R/Wall at Nongbarehrim
21 3921 10/04/2013~~25/04/2013~~16 53 Const of R/Wall at Nongbarehrim
22 124236 16/10/2014~~18/10/2014~~3 3 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec
23 122501 20/01/2015~~11/02/2015~~23 20 Construction of RetainingWall (ECW) at Nongbareh Rim Vec
24 94201 28/11/2016~~13/12/2016~~16 14 Const of R/Wall at Nongbareh Rim VEC Phase - III L=500 m W/O 2016-17/104
25 120152 12/01/2017~~27/01/2017~~16 14 Const of R/Wall at Nongbareh Rim VEC Phase - III L=500 m W/O 2016-17/104
26 150362 23/02/2017~~11/03/2017~~17 15 Const of R/Wall at Nongbareh Rim VEC Phase - III L=500 m W/O 2016-17/104
27 22468 03/07/2017~~13/07/2017~~11 10 Construction of Farm Pond at Nogbarehrim VEC W/O 2017-18/FR-2
28 35411 07/08/2017~~21/09/2017~~46 40 Construction of R/Wall at Nongbareh Rim VEC Ph-IV L= 280 m W/O 2017-18/FP-20
29 95770 11/12/2017~~25/01/2018~~46 40 Construction of R Wall Ph VI at Nongbareh rim 2017-18
30 121199 29/01/2018~~29/01/2018~~1 1 Construction of R Wall Ph VI at Nongbareh rim 2017-18
31 150553 16/03/2018~~26/03/2018~~11 10 Construction of R Wall Ph IX at Nongbareh Rim VEC Length 11.6 WO:2017-18/FP-118
32 3734 04/04/2018~~04/04/2018~~1 1 Construction of R Wall Ph IX at Nongbareh Rim VEC Length 11.6 WO:2017-18/FP-118
33 41644 10/07/2018~~25/07/2018~~16 14 Construction of 10 Nos Piggery Sheds & Soak Pit at Nongbareh Rim VEC WO 2018-19/IF-22
34 89061 01/10/2018~~16/10/2018~~16 14 Construction of 10 Nos Piggery Sheds & Soak Pit at Nongbareh Rim VEC WO 2018-19/IF-22
35 101184 17/10/2018~~01/11/2018~~16 14 Construction of 10 Nos Piggery Sheds & Soak Pit at Nongbareh Rim VEC WO 2018-19/IF-22
36 112949 08/11/2018~~16/11/2018~~9 8 Construction of 10 Nos Piggery Sheds & Soak Pit at Nongbareh Rim VEC WO 2018-19/IF-22
37 61477 29/07/2019~~13/08/2019~~16 14 Construction of Retaining Wall Ph XIV at Nongbarehrim VEC Length 166 m WO 2019 20 FP 8031
38 85526 28/08/2019~~28/09/2019~~32 28 Construction of Retaining Wall Ph XIV at Nongbarehrim VEC Length 166 m WO 2019 20 FP 8031
39 117195 03/10/2019~~11/10/2019~~9 8 Construction of Retaining Wall Ph XIV at Nongbarehrim VEC Length 166 m WO 2019 20 FP 8031
40 142230 29/10/2019~~02/11/2019~~5 5 Construction of Check Dam at Nongbarehrim VEC Length 17.5m2 WO 2019 20 WC 9646
41 168907 29/11/2019~~30/12/2019~~32 28 Construction of R Wall cum Fencing at Nongbarehrim VEC WO 2019 20 FP 8493
42 202547 15/01/2020~~05/02/2020~~22 19 Construction of R Wall cum Fencing at Nongbarehrim VEC WO 2019 20 FP 8493
43 19732 19/05/2020~~19/06/2020~~32 28 Construction of R Wall at Nongbareh Rim VEC WO 2020 21 FP 9008
44 39748 22/06/2020~~16/07/2020~~25 22 Construction of R Wall at Nongbareh Rim VEC WO 2020 21 FP 9008
45 161666 06/11/2020~~07/12/2020~~32 28 Construction of R Wall at NongbarehRim VEC WO 2020 21
46 200110 04/01/2021~~28/01/2021~~25 22 Construction of R Wall at NongbarehRim VEC WO 2020 21
47 13129 13/05/2021~~26/05/2021~~14 12 Construction of Check Dam in convergence with MBDA at Nongbareh Rim VEC WO 2021 22
48 99519 12/10/2021~~12/11/2021~~32 28 Construction of side drain at Nongbareh Rim VEC WO 2021 22
49 125008 15/11/2021~~01/12/2021~~17 15 Construction of side drain at Nongbareh Rim VEC WO 2021 22
50 155965 16/12/2021~~16/01/2022~~32 28 Construction of Internal road at Nongbareh Rim VEC WO 2021 22 RC 64705
51 183969 18/01/2022~~31/01/2022~~14 12 Construction of Internal road at Nongbareh Rim VEC WO 2021 22 RC 64705
52 201260 03/02/2022~~10/02/2022~~8 7 Construction of Drainage at Nongbareh Rim VEC WO 2021 22 FP 13671

Period and Work on which Employment Given

S.No Name of Applicant Month & Date from which employment requested No of Days Work Name MSR No. Total Amount of Work Done Payment Due
1 Lisong Pohlong 01/06/2009 14 Const of Road at Nongbarehrim 8099 980 0
2 Lisong Pohlong 17/09/2009 7 Const of Road at Nongbarehrim 8647 700 0
3 Lisong Pohlong 05/10/2009 7 Const of Road at Nongbarehrim 13167 700 0
Sub Total FY 0910 28 2380 0
4 Dep Pohlong 22/05/2010 14 Construction of Drainage at Nongbarehrim 22050 1400 0
5 Dep Pohlong 08/06/2010 14 Construction of Drainage at Nongbarehrim 28211 1400 0
6 Lisong Pohlong 24/06/2010 7 Construction of Drainage at Nongbarehrim 28532 700 0
7 Dep Pohlong 20/07/2010 14 Construction of Drainage at Nongbarehrim 30325 1400 0
8 Dep Pohlong 21/08/2010 14 Construction of Drainage at Nongbarehrim 38323 1400 0
9 Dep Pohlong 07/09/2010 6 Construction of Drainage at Nongbarehrim 38351 600 0
Sub Total FY 1011 69 6900 0
10 Lisong Pohlong 16/05/2011 14 Const of Road at Nongbarehrim 45356 1638 0
11 Lisong Pohlong 01/06/2011 7 Const of Road at Nongbarehrim 453658 819 0
12 Lisong Pohlong 17/06/2011 7 Const of Road at Nongbarehrim 62372 819 0
13 Lisong Pohlong 25/06/2011 14 Const of Road at Nongbarehrim 65108 1638 0
14 Lisong Pohlong 15/07/2011 7 Const of Road at Nongbarehrim 457458 819 0
15 Lisong Pohlong 23/07/2011 7 Const of Road at Nongbarehrim 61802 819 0
16 Lisong Pohlong 01/08/2011 7 Const of Road at Nongbarehrim 65370 819 0
17 Lisong Pohlong 09/08/2011 14 Const of Road at Nongbarehrim 65517 1638 0
18 Lisong Pohlong 06/02/2012 14 Const of Road at Nongbarehrim 71197 1638 0
19 Lisong Pohlong 22/02/2012 5 Const of Road at Nongbarehrim 71213 585 0
Sub Total FY 1112 96 11232 0
20 Lisong Pohlong 02/04/2013 7 Const of R/Wall at Nongbarehrim 109009 1015 0
21 Lisong Pohlong 10/04/2013 14 Const of R/Wall at Nongbarehrim 114172 2030 0
Sub Total FY 1314 21 3045 0
22 Lisong Pohlong 16/10/2014 3 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec 145942 459 0
23 Lisong Pohlong 20/01/2015 7 Construction of RetainingWall (ECW) at Nongbareh Rim Vec 147782 1071 0
24 Lisong Pohlong 28/01/2015 7 Construction of RetainingWall (ECW) at Nongbareh Rim Vec 147797 1071 0
25 Lisong Pohlong 05/02/2015 6 Construction of RetainingWall (ECW) at Nongbareh Rim Vec 147812 918 0
Sub Total FY 1415 23 3519 0
26 Lisong Pohlong 28/11/2016 14 Const of R/Wall at Nongbareh Rim VEC Phase - III L=500 m W/O 2016-17/104 3787 2366 0
27 Lisong Pohlong 12/01/2017 14 Const of R/Wall at Nongbareh Rim VEC Phase - III L=500 m W/O 2016-17/104 4420 2366 0
28 Lisong Pohlong 23/02/2017 14 Const of R/Wall at Nongbareh Rim VEC Phase - III L=500 m W/O 2016-17/104 5369 2366 0
29 Lisong Pohlong 11/03/2017 1 Const of R/Wall at Nongbareh Rim VEC Phase - III L=500 m W/O 2016-17/104 5381 169 0
Sub Total FY 1617 43 7267 0
30 Lisong Pohlong 03/07/2017 9 Construction of Farm Pond at Nogbarehrim VEC W/O 2017-18/FR-2 1168 1575 0
31 Lisong Pohlong 13/07/2017 1 Construction of Farm Pond at Nogbarehrim VEC W/O 2017-18/FR-2 1172 175 0
32 Lisong Pohlong 07/08/2017 14 Construction of R/Wall at Nongbareh Rim VEC Ph-IV L= 280 m W/O 2017-18/FP-20 1881 2450 0
33 Lisong Pohlong 23/08/2017 14 Construction of R/Wall at Nongbareh Rim VEC Ph-IV L= 280 m W/O 2017-18/FP-20 1979 2450 0
34 Lisong Pohlong 08/09/2017 12 Construction of R/Wall at Nongbareh Rim VEC Ph-IV L= 280 m W/O 2017-18/FP-20 2824 2100 0
35 Lisong Pohlong 11/12/2017 13 Construction of R Wall Ph VI at Nongbareh rim 2017-18 5171 2275 0
36 Lisong Pohlong 27/12/2017 14 Construction of R Wall Ph VI at Nongbareh rim 2017-18 5183 2450 0
37 Lisong Pohlong 12/01/2018 12 Construction of R Wall Ph VI at Nongbareh rim 2017-18 5537 2100 0
38 Lisong Pohlong 29/01/2018 1 Construction of R Wall Ph VI at Nongbareh rim 2017-18 6001 175 0
39 Lisong Pohlong 16/03/2018 9 Construction of R Wall Ph IX at Nongbareh Rim VEC Length 11.6 WO:2017-18/FP-118 6916 1575 0
Sub Total FY 1718 99 17325 0
40 Lisong Pohlong 04/04/2018 1 Construction of R Wall Ph IX at Nongbareh Rim VEC Length 11.6 WO:2017-18/FP-118 130 175 0
41 Lisong Pohlong 10/07/2018 14 Construction of 10 Nos Piggery Sheds & Soak Pit at Nongbareh Rim VEC WO 2018-19/IF-22 1563 2534 0
42 Lisong Pohlong 01/10/2018 14 Construction of 10 Nos Piggery Sheds & Soak Pit at Nongbareh Rim VEC WO 2018-19/IF-22 2819 2534 0
43 Lisong Pohlong 17/10/2018 14 Construction of 10 Nos Piggery Sheds & Soak Pit at Nongbareh Rim VEC WO 2018-19/IF-22 3182 2534 0
44 Lisong Pohlong 08/11/2018 8 Construction of 10 Nos Piggery Sheds & Soak Pit at Nongbareh Rim VEC WO 2018-19/IF-22 3443 1448 0
Sub Total FY 1819 51 9225 0
45 Lisong Pohlong 29/07/2019 14 Construction of Retaining Wall Ph XIV at Nongbarehrim VEC Length 166 m WO 2019 20 FP 8031 595 2618 0
46 Lisong Pohlong 28/08/2019 14 Construction of Retaining Wall Ph XIV at Nongbarehrim VEC Length 166 m WO 2019 20 FP 8031 1024 2618 0
47 Lisong Pohlong 13/09/2019 14 Construction of Retaining Wall Ph XIV at Nongbarehrim VEC Length 166 m WO 2019 20 FP 8031 1036 2618 0
48 Lisong Pohlong 03/10/2019 8 Construction of Retaining Wall Ph XIV at Nongbarehrim VEC Length 166 m WO 2019 20 FP 8031 2054 1496 0
49 Lisong Pohlong 29/10/2019 5 Construction of Check Dam at Nongbarehrim VEC Length 17.5m2 WO 2019 20 WC 9646 2961 935 0
50 Lisong Pohlong 29/11/2019 1 Construction of R Wall cum Fencing at Nongbarehrim VEC WO 2019 20 FP 8493 3763 187 0
51 Lisong Pohlong 30/11/2019 13 Construction of R Wall cum Fencing at Nongbarehrim VEC WO 2019 20 FP 8493 3775 2431 0
52 Lisong Pohlong 15/12/2019 12 Construction of R Wall cum Fencing at Nongbarehrim VEC WO 2019 20 FP 8493 3787 2244 0
53 Lisong Pohlong 15/01/2020 14 Construction of R Wall cum Fencing at Nongbarehrim VEC WO 2019 20 FP 8493 5303 2618 0
54 Lisong Pohlong 31/01/2020 5 Construction of R Wall cum Fencing at Nongbarehrim VEC WO 2019 20 FP 8493 5315 935 0
Sub Total FY 1920 100 18700 0
55 Lisong Pohlong 19/05/2020 14 Construction of R Wall at Nongbareh Rim VEC WO 2020 21 FP 9008 551 2842 0
56 Lisong Pohlong 04/06/2020 14 Construction of R Wall at Nongbareh Rim VEC WO 2020 21 FP 9008 559 2842 0
57 Lisong Pohlong 22/06/2020 14 Construction of R Wall at Nongbareh Rim VEC WO 2020 21 FP 9008 916 2842 0
58 Lisong Pohlong 08/07/2020 8 Construction of R Wall at Nongbareh Rim VEC WO 2020 21 FP 9008 923 1624 0
59 Lisong Pohlong 06/11/2020 14 Construction of R Wall at NongbarehRim VEC WO 2020 21 4210 2842 0
60 Lisong Pohlong 22/11/2020 13 Construction of R Wall at NongbarehRim VEC WO 2020 21 4222 2639 0
61 Lisong Pohlong 04/01/2021 14 Construction of R Wall at NongbarehRim VEC WO 2020 21 5420 2842 0
62 Lisong Pohlong 20/01/2021 8 Construction of R Wall at NongbarehRim VEC WO 2020 21 5436 1624 0
Sub Total FY 2021 99 20097 0
63 Lisong Pohlong 13/05/2021 12 Construction of Check Dam in convergence with MBDA at Nongbareh Rim VEC WO 2021 22 133 2712 0
64 Lisong Pohlong 12/10/2021 14 Construction of side drain at Nongbareh Rim VEC WO 2021 22 1181 3164 0
65 Lisong Pohlong 28/10/2021 14 Construction of side drain at Nongbareh Rim VEC WO 2021 22 1185 3164 0
66 Lisong Pohlong 15/11/2021 10 Construction of side drain at Nongbareh Rim VEC WO 2021 22 2071 2260 0
67 Lisong Pohlong 26/11/2021 5 Construction of side drain at Nongbareh Rim VEC WO 2021 22 2075 1130 0
68 Lisong Pohlong 16/12/2021 13 Construction of Internal road at Nongbareh Rim VEC WO 2021 22 RC 64705 2723 2938 0
69 Lisong Pohlong 01/01/2022 13 Construction of Internal road at Nongbareh Rim VEC WO 2021 22 RC 64705 2733 2938 0
70 Lisong Pohlong 18/01/2022 12 Construction of Internal road at Nongbareh Rim VEC WO 2021 22 RC 64705 3804 2712 0
71 Lisong Pohlong 03/02/2022 7 Construction of Drainage at Nongbareh Rim VEC WO 2021 22 FP 13671 4387 1582 0
Sub Total FY 2122 100 22600 0