Back

Job card
MAHATMA GANDHI NATIONAL RURAL EMPLOYMENT GUARANTEE ACT
Job card No.: MG-01-006-021-004/32 Family-Id: 32
Name of Head of Household: Fancyrose Talang
Name of Father/Husband: Hiah Gadiang
Category: ST
Date of Registration: 8/20/2007
Address: 32
Villages:
Panchayat: Nongbareh Lyntiar
Block: AMLAREM
District: WEST JAINTIA HILLS(MEGHALAYA)
: NO Family-Id: 32
Epic No.:
Details of the Applicants of the household willing to work
S.No Name of Applicant Gender Age Bank/Postoffice
1 Fincy Talang Female 21 NONGBAREH
2 Fancyrose Talang Female 30 Meghalaya Co-operative Apex Bank


Signature/Thumb impression of Applicant
                  
Seal & Signature of Registering Authority

Requested Period of Employment

S.No Name of Applicant Month & Date from which employment requested No of Days
1 12958 Fincy Talang 01/06/2009~~14/06/2009~~14 14
2 17189 17/09/2009~~23/09/2009~~7 7
3 907 22/05/2010~~04/06/2010~~14 14
4 100089 22/05/2010~~04/06/2010~~14 14
5 2089 08/06/2010~~21/06/2010~~14 14
6 101248 08/06/2010~~21/06/2010~~14 14
7 2648 24/06/2010~~30/06/2010~~7 7
8 103033 24/06/2010~~30/06/2010~~7 7
9 8035 20/07/2010~~02/08/2010~~14 14
10 104481 20/07/2010~~02/08/2010~~14 14
11 14067 21/08/2010~~03/09/2010~~14 14
12 109243 21/08/2010~~03/09/2010~~14 14
13 14242 07/09/2010~~12/09/2010~~6 6
14 109378 07/09/2010~~12/09/2010~~6 6
15 25429 22/11/2010~~23/11/2010~~2 2
16 2462 16/05/2011~~31/05/2011~~16 14
17 7577 01/06/2011~~08/06/2011~~8 7
18 11990 17/06/2011~~24/06/2011~~8 7
19 13232 25/06/2011~~10/07/2011~~16 14
20 9443 15/07/2011~~22/07/2011~~8 7
21 10099 23/07/2011~~30/07/2011~~8 7
22 14637 01/08/2011~~08/08/2011~~8 7
23 17379 09/08/2011~~24/08/2011~~16 14
24 27116 06/02/2012~~21/02/2012~~16 14
25 27275 22/02/2012~~26/02/2012~~5 5
26 3074 02/04/2013~~09/04/2013~~8 7
27 3879 10/04/2013~~25/04/2013~~16 14
28 49558 Fancyrose Talang 24/06/2014~~01/07/2014~~8 7
29 51510 02/07/2014~~09/07/2014~~8 7
30 52336 10/07/2014~~17/07/2014~~8 7
31 52932 21/07/2014~~28/07/2014~~8 7
32 53308 04/08/2014~~11/08/2014~~8 7
33 53683 13/08/2014~~20/08/2014~~8 7
34 54076 21/08/2014~~28/08/2014~~8 7
35 54258 01/09/2014~~08/09/2014~~8 7
36 103975 10/09/2014~~17/09/2014~~8 7
37 103706 22/09/2014~~29/09/2014~~8 7
38 116620 06/10/2014~~13/10/2014~~8 7
39 124173 16/10/2014~~18/10/2014~~3 3
40 122461 20/01/2015~~11/02/2015~~23 20
41 13069 04/05/2015~~19/05/2015~~16 14
42 15692 22/05/2015~~06/06/2015~~16 14
43 22503 08/06/2015~~09/06/2015~~2 2
44 69611 11/12/2015~~26/12/2015~~16 14
45 85046 25/01/2016~~09/02/2016~~16 14
46 93337 12/02/2016~~27/02/2016~~16 14
47 108125 02/03/2016~~17/03/2016~~16 14
48 2223 12/05/2016~~16/05/2016~~5 5
49 30228 19/07/2017~~02/09/2017~~46 40
50 90102 29/11/2017~~13/01/2018~~46 40
51 119252 24/01/2018~~24/01/2018~~1 1
52 150565 16/03/2018~~31/03/2018~~16 14
53 3435 04/04/2018~~10/04/2018~~7 6
54 41523 09/07/2018~~09/08/2018~~32 28
55 88829 01/10/2018~~11/10/2018~~11 10
56 144193 20/12/2018~~20/01/2019~~32 28
57 170318 24/01/2019~~22/02/2019~~30 26
58 51932 15/07/2019~~15/08/2019~~32 28
59 84985 28/08/2019~~28/09/2019~~32 28
60 117296 03/10/2019~~18/10/2019~~16 14
61 121633 22/10/2019~~06/11/2019~~16 14
62 177391 09/12/2019~~26/12/2019~~18 16
63 193682 08/01/2020~~08/01/2020~~1 1
64 27264 02/06/2020~~03/07/2020~~32 28
65 50852 06/07/2020~~30/07/2020~~25 22
66 168013 17/11/2020~~18/12/2020~~32 28
67 200040 04/01/2021~~22/01/2021~~19 17
68 79599 21/09/2021~~01/10/2021~~11 10
69 155776 16/12/2021~~16/01/2022~~32 28
70 183235 17/01/2022~~08/02/2022~~23 20
71 207052 10/02/2022~~13/03/2022~~32 28
72 258384 14/03/2022~~17/03/2022~~4 4
73 264859 19/03/2022~~30/03/2022~~12 11
74 272038 31/03/2022~~31/03/2022~~1 1

Period and Work on which Employment Offered

S.No Name of Applicant Month & Date from which employment requested No of Days Work Name
1 12958 Fincy Talang 01/06/2009~~14/06/2009~~14 33 Const of Road at Nongbarehrim
2 17189 17/09/2009~~23/09/2009~~7 19 Const of Road at Nongbarehrim
3 100089 22/05/2010~~04/06/2010~~14 14 Construction of Drainage at Nongbarehrim
4 101248 08/06/2010~~21/06/2010~~14 14 Construction of Drainage at Nongbarehrim
5 103033 24/06/2010~~30/06/2010~~7 7 Construction of Drainage at Nongbarehrim
6 104481 20/07/2010~~02/08/2010~~14 14 Construction of Drainage at Nongbarehrim
7 109243 21/08/2010~~03/09/2010~~14 14 Construction of Drainage at Nongbarehrim
8 109378 07/09/2010~~12/09/2010~~6 6 Construction of Drainage at Nongbarehrim
9 25429 22/11/2010~~23/11/2010~~2 14 Construction of Drainage at Nongbarehrim
10 2462 16/05/2011~~31/05/2011~~16 37 Const of Road at Nongbarehrim
11 7577 01/06/2011~~08/06/2011~~8 34 Const of Road at Nongbarehrim
12 11990 17/06/2011~~24/06/2011~~8 33 Const of Road at Nongbarehrim
13 13232 25/06/2011~~10/07/2011~~16 41 Const of Road at Nongbarehrim
14 9443 15/07/2011~~22/07/2011~~8 27 Const of Road at Nongbarehrim
15 10099 23/07/2011~~30/07/2011~~8 34 Const of Road at Nongbarehrim
16 14637 01/08/2011~~08/08/2011~~8 33 Const of Road at Nongbarehrim
17 17379 09/08/2011~~24/08/2011~~16 38 Const of Road at Nongbarehrim
18 27116 06/02/2012~~21/02/2012~~16 54 Const of Road at Nongbarehrim
19 27275 22/02/2012~~26/02/2012~~5 20 Const of Road at Nongbarehrim
20 3074 02/04/2013~~09/04/2013~~8 35 Const of R/Wall at Nongbarehrim
21 3879 10/04/2013~~25/04/2013~~16 52 Const of R/Wall at Nongbarehrim
22 49558 Fancyrose Talang 24/06/2014~~01/07/2014~~8 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec
23 51510 02/07/2014~~09/07/2014~~8 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec
24 52336 10/07/2014~~17/07/2014~~8 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec
25 52932 21/07/2014~~28/07/2014~~8 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec
26 53308 04/08/2014~~11/08/2014~~8 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec
27 53683 13/08/2014~~20/08/2014~~8 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec
28 54076 21/08/2014~~28/08/2014~~8 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec
29 54258 01/09/2014~~08/09/2014~~8 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec
30 103975 10/09/2014~~17/09/2014~~8 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec
31 103706 22/09/2014~~29/09/2014~~8 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec
32 116620 06/10/2014~~13/10/2014~~8 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec
33 124173 16/10/2014~~18/10/2014~~3 3 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec
34 122461 20/01/2015~~11/02/2015~~23 20 Construction of RetainingWall (ECW) at Nongbareh Rim Vec
35 13069 04/05/2015~~19/05/2015~~16 14 "Const. of Internal road at Nongbarehrim
36 15692 22/05/2015~~06/06/2015~~16 14 "Const. of Internal road at Nongbarehrim
37 22503 08/06/2015~~09/06/2015~~2 2 "Const. of Internal road at Nongbarehrim
38 69611 11/12/2015~~26/12/2015~~16 14 Consnt. of Internal Road at Nongbarehrim Vec L= 900M PH-II including R/Wall & Slab Cover Culvert
39 85046 25/01/2016~~09/02/2016~~16 14 Consnt. of Internal Road at Nongbarehrim Vec L= 900M PH-II including R/Wall & Slab Cover Culvert
40 93337 12/02/2016~~27/02/2016~~16 14 Consnt. of Internal Road at Nongbarehrim Vec L= 900M PH-II including R/Wall & Slab Cover Culvert
41 108125 02/03/2016~~17/03/2016~~16 14 Consnt. of Internal Road at Nongbarehrim Vec L= 900M PH-II including R/Wall & Slab Cover Culvert
42 2223 12/05/2016~~16/05/2016~~5 5 Consnt. of Internal Road at Nongbarehrim Vec L= 900M PH-II including R/Wall & Slab Cover Culvert
43 30228 19/07/2017~~02/09/2017~~46 40 Construction of R/Wall Ph-V at Nongbareh Rim VEC W.O 2017-18/FP-26
44 90102 29/11/2017~~13/01/2018~~46 40 Construction of R Wall Ph VII at Nongbareh Rim VEC 2017-18
45 119252 24/01/2018~~24/01/2018~~1 1 Construction of R Wall Ph VII at Nongbareh Rim VEC 2017-18
46 150565 16/03/2018~~31/03/2018~~16 14 Construction of R Wall Ph X at Nongbarehrim VEC Length 93.5 WO:2017-18/FP-117
47 3435 04/04/2018~~10/04/2018~~7 6 Construction of R Wall Ph X at Nongbarehrim VEC Length 93.5 WO:2017-18/FP-117
48 41523 09/07/2018~~09/08/2018~~32 28 Construction of R Wall Ph XI Length 160m at Nongbareh Rim VEC WO 2018-19/FP-23
49 88829 01/10/2018~~11/10/2018~~11 10 Construction of R Wall Ph XI Length 160m at Nongbareh Rim VEC WO 2018-19/FP-23
50 144193 20/12/2018~~20/01/2019~~32 28 Construction of R Wall Ph XIII at Nongbarehrim VEC Length 85m WO 2018 19 FP 94
51 170318 24/01/2019~~22/02/2019~~30 26 Construction of R Wall Ph XIII at Nongbarehrim VEC Length 85m WO 2018 19 FP 94
52 51932 15/07/2019~~15/08/2019~~32 28 Construction of Railing at Nongbareh Rim VEC Length 500 m WO 2019 20 FP 8
53 84985 28/08/2019~~28/09/2019~~32 28 Construction of Railing at Nongbareh Rim VEC Length 500 m WO 2019 20 FP 8
54 117296 03/10/2019~~18/10/2019~~16 14 Construction of Railing at Nongbareh Rim VEC Length 500 m WO 2019 20 FP 8
55 121633 22/10/2019~~06/11/2019~~16 14 Construction of Railing at Nongbareh Rim VEC Length 500 m WO 2019 20 FP 8
56 177391 09/12/2019~~26/12/2019~~18 16 Construction of Railing by GI Pipe at Nongbareh Rim VEC WO 2019 20 FP 8400
57 193682 08/01/2020~~08/01/2020~~1 1 Construction of Railing by GI Pipe at Nongbareh Rim VEC WO 2019 20 FP 8400
58 27264 02/06/2020~~03/07/2020~~32 28 Construction of Railing by GI Pipe at Nongbareh Rim VEC WO 2020 21 FP 10088
59 50852 06/07/2020~~30/07/2020~~25 22 Construction of Railing by GI Pipe at Nongbareh Rim VEC WO 2020 21 FP 10088
60 168013 17/11/2020~~18/12/2020~~32 28 Construction of R Wall at NongbarehRim VEC WO 2020 21
61 200040 04/01/2021~~22/01/2021~~19 17 Construction of R Wall at NongbarehRim VEC WO 2020 21
62 79599 21/09/2021~~01/10/2021~~11 10 Construction of Check Dam at Nongbareh Rim VEC WO 2021 22
63 155776 16/12/2021~~16/01/2022~~32 28 Improvement of Fishery pond at Nongbareh Rim VEC WO 2021 22 FR 5161
64 183235 17/01/2022~~08/02/2022~~23 20 Improvement of Fishery pond at Nongbareh Rim VEC WO 2021 22 FR 5161
65 207052 10/02/2022~~13/03/2022~~32 28 Improvement of Fishery pond at Nongbareh Rim VEC WO 2021 22 FR 5267
66 258384 14/03/2022~~17/03/2022~~4 4 Improvement of Fishery pond at Nongbareh Rim VEC WO 2021 22 FR 5268
67 264859 19/03/2022~~30/03/2022~~12 11 Construction of CC Motorable Road at Nongbareh Rim VEC WO 2021 22
68 272038 31/03/2022~~31/03/2022~~1 1 Construction of CC Motorable Road at Nongbareh Rim VEC WO 2021 22

Period and Work on which Employment Given

S.No Name of Applicant Month & Date from which employment requested No of Days Work Name MSR No. Total Amount of Work Done Payment Due
1 Fincy Talang 01/06/2009 14 Const of Road at Nongbarehrim 8097 980 0
2 Fincy Talang 17/09/2009 7 Const of Road at Nongbarehrim 8645 700 0
Sub Total FY 0910 21 1680 0
3 Fincy Talang 22/05/2010 14 Construction of Drainage at Nongbarehrim 22047 1400 0
4 Fincy Talang 08/06/2010 14 Construction of Drainage at Nongbarehrim 22298 1400 0
5 Fincy Talang 24/06/2010 7 Construction of Drainage at Nongbarehrim 28529 700 0
6 Fincy Talang 20/07/2010 14 Construction of Drainage at Nongbarehrim 30321 1400 0
7 Fincy Talang 21/08/2010 14 Construction of Drainage at Nongbarehrim 38320 1400 0
8 Fincy Talang 07/09/2010 6 Construction of Drainage at Nongbarehrim 38348 600 0
9 Fincy Talang 22/11/2010 1 Construction of Drainage at Nongbarehrim 39086 100 0
Sub Total FY 1011 70 7000 0
10 Fincy Talang 16/05/2011 14 Const of Road at Nongbarehrim 45352 1638 0
11 Fincy Talang 01/06/2011 7 Const of Road at Nongbarehrim 453654 819 0
12 Fincy Talang 17/06/2011 7 Const of Road at Nongbarehrim 62368 819 0
13 Fincy Talang 25/06/2011 14 Const of Road at Nongbarehrim 65104 1638 0
14 Fincy Talang 15/07/2011 7 Const of Road at Nongbarehrim 457454 819 0
15 Fincy Talang 23/07/2011 7 Const of Road at Nongbarehrim 61798 819 0
16 Fincy Talang 01/08/2011 7 Const of Road at Nongbarehrim 65366 819 0
17 Fincy Talang 09/08/2011 14 Const of Road at Nongbarehrim 65513 1638 0
18 Fincy Talang 06/02/2012 14 Const of Road at Nongbarehrim 71193 1638 0
19 Fincy Talang 22/02/2012 5 Const of Road at Nongbarehrim 71209 585 0
Sub Total FY 1112 96 11232 0
20 Fincy Talang 02/04/2013 7 Const of R/Wall at Nongbarehrim 109005 1015 0
21 Fincy Talang 10/04/2013 14 Const of R/Wall at Nongbarehrim 114168 2030 0
Sub Total FY 1314 21 3045 0
22 Fancyrose Talang 24/06/2014 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec 142445 1071 0
23 Fancyrose Talang 02/07/2014 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec 142459 1071 0
24 Fancyrose Talang 10/07/2014 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec 144267 1071 0
25 Fancyrose Talang 21/07/2014 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec 144281 1071 0
26 Fancyrose Talang 04/08/2014 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec 144656 1071 0
27 Fancyrose Talang 13/08/2014 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec 144670 1071 0
28 Fancyrose Talang 21/08/2014 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec 144837 1071 0
29 Fancyrose Talang 01/09/2014 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec 144851 1071 0
30 Fancyrose Talang 10/09/2014 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec 145103 1071 0
31 Fancyrose Talang 22/09/2014 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec 145117 1071 0
32 Fancyrose Talang 06/10/2014 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec 145928 1071 0
33 Fancyrose Talang 16/10/2014 3 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec 145938 459 0
34 Fancyrose Talang 20/01/2015 7 Construction of RetainingWall (ECW) at Nongbareh Rim Vec 147778 1071 0
35 Fancyrose Talang 28/01/2015 7 Construction of RetainingWall (ECW) at Nongbareh Rim Vec 147793 1071 0
36 Fancyrose Talang 05/02/2015 6 Construction of RetainingWall (ECW) at Nongbareh Rim Vec 147808 918 0
Sub Total FY 1415 100 15300 0
37 Fancyrose Talang 04/05/2015 14 "Const. of Internal road at Nongbarehrim 786 2282 0
38 Fancyrose Talang 22/05/2015 14 "Const. of Internal road at Nongbarehrim 801 2282 0
39 Fancyrose Talang 08/06/2015 2 "Const. of Internal road at Nongbarehrim 929 326 0
40 Fancyrose Talang 11/12/2015 13 Consnt. of Internal Road at Nongbarehrim Vec L= 900M PH-II including R/Wall & Slab Cover Culvert 2987 2119 0
41 Fancyrose Talang 25/01/2016 14 Consnt. of Internal Road at Nongbarehrim Vec L= 900M PH-II including R/Wall & Slab Cover Culvert 3869 2282 0
42 Fancyrose Talang 12/02/2016 14 Consnt. of Internal Road at Nongbarehrim Vec L= 900M PH-II including R/Wall & Slab Cover Culvert 4204 2282 0
43 Fancyrose Talang 02/03/2016 14 Consnt. of Internal Road at Nongbarehrim Vec L= 900M PH-II including R/Wall & Slab Cover Culvert 4782 2282 0
Sub Total FY 1516 85 13855 0
44 Fancyrose Talang 12/05/2016 5 Consnt. of Internal Road at Nongbarehrim Vec L= 900M PH-II including R/Wall & Slab Cover Culvert 139 845 0
Sub Total FY 1617 5 845 0
45 Fancyrose Talang 19/07/2017 14 Construction of R/Wall Ph-V at Nongbareh Rim VEC W.O 2017-18/FP-26 1599 2450 0
46 Fancyrose Talang 04/08/2017 14 Construction of R/Wall Ph-V at Nongbareh Rim VEC W.O 2017-18/FP-26 1605 2450 0
47 Fancyrose Talang 20/08/2017 12 Construction of R/Wall Ph-V at Nongbareh Rim VEC W.O 2017-18/FP-26 2033 2100 0
48 Fancyrose Talang 29/11/2017 14 Construction of R Wall Ph VII at Nongbareh Rim VEC 2017-18 4888 2450 0
49 Fancyrose Talang 15/12/2017 13 Construction of R Wall Ph VII at Nongbareh Rim VEC 2017-18 4894 2275 0
50 Fancyrose Talang 31/12/2017 12 Construction of R Wall Ph VII at Nongbareh Rim VEC 2017-18 5414 2100 0
51 Fancyrose Talang 24/01/2018 1 Construction of R Wall Ph VII at Nongbareh Rim VEC 2017-18 5955 175 0
52 Fancyrose Talang 16/03/2018 14 Construction of R Wall Ph X at Nongbarehrim VEC Length 93.5 WO:2017-18/FP-117 6930 2450 0
Sub Total FY 1718 94 16450 0
53 Fancyrose Talang 04/04/2018 6 Construction of R Wall Ph X at Nongbarehrim VEC Length 93.5 WO:2017-18/FP-117 106 1050 0
54 Fancyrose Talang 09/07/2018 14 Construction of R Wall Ph XI Length 160m at Nongbareh Rim VEC WO 2018-19/FP-23 1538 2534 0
55 Fancyrose Talang 25/07/2018 14 Construction of R Wall Ph XI Length 160m at Nongbareh Rim VEC WO 2018-19/FP-23 1544 2534 0
56 Fancyrose Talang 01/10/2018 10 Construction of R Wall Ph XI Length 160m at Nongbareh Rim VEC WO 2018-19/FP-23 2803 1810 0
57 Fancyrose Talang 20/12/2018 13 Construction of R Wall Ph XIII at Nongbarehrim VEC Length 85m WO 2018 19 FP 94 4032 2353 0
58 Fancyrose Talang 05/01/2019 13 Construction of R Wall Ph XIII at Nongbarehrim VEC Length 85m WO 2018 19 FP 94 4038 2353 0
59 Fancyrose Talang 24/01/2019 14 Construction of R Wall Ph XIII at Nongbarehrim VEC Length 85m WO 2018 19 FP 94 4958 2534 0
60 Fancyrose Talang 09/02/2019 12 Construction of R Wall Ph XIII at Nongbarehrim VEC Length 85m WO 2018 19 FP 94 4964 2172 0
Sub Total FY 1819 96 17340 0
61 Fancyrose Talang 15/07/2019 14 Construction of Railing at Nongbareh Rim VEC Length 500 m WO 2019 20 FP 8 428 2618 0
62 Fancyrose Talang 31/07/2019 8 Construction of Railing at Nongbareh Rim VEC Length 500 m WO 2019 20 FP 8 434 1496 0
63 Fancyrose Talang 09/08/2019 6 Construction of Railing at Nongbareh Rim VEC Length 500 m WO 2019 20 FP 8 440 1122 0
64 Fancyrose Talang 28/08/2019 14 Construction of Railing at Nongbareh Rim VEC Length 500 m WO 2019 20 FP 8 1005 2618 0
65 Fancyrose Talang 13/09/2019 14 Construction of Railing at Nongbareh Rim VEC Length 500 m WO 2019 20 FP 8 1011 2618 0
66 Fancyrose Talang 03/10/2019 14 Construction of Railing at Nongbareh Rim VEC Length 500 m WO 2019 20 FP 8 2065 2618 0
67 Fancyrose Talang 22/10/2019 14 Construction of Railing at Nongbareh Rim VEC Length 500 m WO 2019 20 FP 8 2144 2618 0
68 Fancyrose Talang 09/12/2019 14 Construction of Railing by GI Pipe at Nongbareh Rim VEC WO 2019 20 FP 8400 4117 2618 0
69 Fancyrose Talang 25/12/2019 1 Construction of Railing by GI Pipe at Nongbareh Rim VEC WO 2019 20 FP 8400 4123 187 0
70 Fancyrose Talang 08/01/2020 1 Construction of Railing by GI Pipe at Nongbareh Rim VEC WO 2019 20 FP 8400 4865 187 0
Sub Total FY 1920 100 18700 0
71 Fancyrose Talang 02/06/2020 14 Construction of Railing by GI Pipe at Nongbareh Rim VEC WO 2020 21 FP 10088 625 2842 0
72 Fancyrose Talang 18/06/2020 14 Construction of Railing by GI Pipe at Nongbareh Rim VEC WO 2020 21 FP 10088 631 2842 0
73 Fancyrose Talang 06/07/2020 14 Construction of Railing by GI Pipe at Nongbareh Rim VEC WO 2020 21 FP 10088 1109 2842 0
74 Fancyrose Talang 22/07/2020 8 Construction of Railing by GI Pipe at Nongbareh Rim VEC WO 2020 21 FP 10088 1115 1624 0
75 Fancyrose Talang 17/11/2020 14 Construction of R Wall at NongbarehRim VEC WO 2020 21 4525 2842 0
76 Fancyrose Talang 03/12/2020 14 Construction of R Wall at NongbarehRim VEC WO 2020 21 4531 2842 0
77 Fancyrose Talang 04/01/2021 14 Construction of R Wall at NongbarehRim VEC WO 2020 21 5402 2842 0
78 Fancyrose Talang 20/01/2021 3 Construction of R Wall at NongbarehRim VEC WO 2020 21 5408 609 0
Sub Total FY 2021 95 19285 0
79 Fancyrose Talang 21/09/2021 10 Construction of Check Dam at Nongbareh Rim VEC WO 2021 22 782 2260 0
80 Fancyrose Talang 16/12/2021 13 Improvement of Fishery pond at Nongbareh Rim VEC WO 2021 22 FR 5161 2706 2938 0
81 Fancyrose Talang 01/01/2022 12 Improvement of Fishery pond at Nongbareh Rim VEC WO 2021 22 FR 5161 2712 2712 0
82 Fancyrose Talang 17/01/2022 14 Improvement of Fishery pond at Nongbareh Rim VEC WO 2021 22 FR 5161 3749 3164 0
83 Fancyrose Talang 02/02/2022 6 Improvement of Fishery pond at Nongbareh Rim VEC WO 2021 22 FR 5161 3757 1356 0
84 Fancyrose Talang 10/02/2022 14 Improvement of Fishery pond at Nongbareh Rim VEC WO 2021 22 FR 5267 4627 3164 0
85 Fancyrose Talang 26/02/2022 14 Improvement of Fishery pond at Nongbareh Rim VEC WO 2021 22 FR 5267 4756 3164 0
86 Fancyrose Talang 14/03/2022 4 Improvement of Fishery pond at Nongbareh Rim VEC WO 2021 22 FR 5268 5808 904 0
87 Fancyrose Talang 19/03/2022 12 Construction of CC Motorable Road at Nongbareh Rim VEC WO 2021 22 5954 2712 0
88 Fancyrose Talang 31/03/2022 1 Construction of CC Motorable Road at Nongbareh Rim VEC WO 2021 22 6170 226 0
Sub Total FY 2122 100 22600 0