Details of the Applicants of the household willing to work
S.No Name of Applicant Gender Age Bank/Postoffice
1 Larsing Amdep Male 42 JOWAI
2 Mercy Pohlong Female 41 JOWAI
3 Farken Pohlong Female 23
4 Larsingh Amdep Male 42 Meghalaya Co-operative Apex Bank
5 MENSI POHLONG Female 52 Meghalaya Co-operative Apex Bank
6 LARSINGH AMDEP Male 51


Signature/Thumb impression of Applicant
                  
Seal & Signature of Registering Authority

Requested Period of Employment

S.No Name of Applicant Month & Date from which employment requested No of Days
1 18114 Larsing Amdep 17/10/2009~~23/10/2009~~7 7
2 974 22/05/2010~~04/06/2010~~14 14
3 100156 22/05/2010~~04/06/2010~~14 14
4 2156 08/06/2010~~21/06/2010~~14 14
5 101315 08/06/2010~~21/06/2010~~14 14
6 2715 24/06/2010~~30/06/2010~~7 7
7 103100 24/06/2010~~30/06/2010~~7 7
8 8119 20/07/2010~~02/08/2010~~14 14
9 104565 20/07/2010~~02/08/2010~~14 14
10 14164 Mercy Pohlong 21/08/2010~~03/09/2010~~14 14
11 109310 21/08/2010~~03/09/2010~~14 14
12 14309 Larsing Amdep 07/09/2010~~12/09/2010~~6 6
13 120032 07/09/2010~~12/09/2010~~6 6
14 25684 Mercy Pohlong 22/11/2010~~23/11/2010~~2 2
15 2600 Larsing Amdep 16/05/2011~~31/05/2011~~16 14
16 7660 01/06/2011~~08/06/2011~~8 7
17 12074 17/06/2011~~24/06/2011~~8 7
18 13315 25/06/2011~~10/07/2011~~16 14
19 9527 15/07/2011~~22/07/2011~~8 7
20 10183 23/07/2011~~30/07/2011~~8 7
21 14721 01/08/2011~~08/08/2011~~8 7
22 17462 09/08/2011~~24/08/2011~~16 14
23 27198 06/02/2012~~21/02/2012~~16 14
24 27359 22/02/2012~~26/02/2012~~5 5
25 3158 02/04/2013~~09/04/2013~~8 7
26 3964 10/04/2013~~25/04/2013~~16 14
27 49516 Larsingh Amdep 24/06/2014~~01/07/2014~~8 7
28 51850 02/07/2014~~09/07/2014~~8 7
29 52524 10/07/2014~~17/07/2014~~8 7
30 53072 21/07/2014~~28/07/2014~~8 7
31 53465 04/08/2014~~11/08/2014~~8 7
32 53919 13/08/2014~~20/08/2014~~8 7
33 54134 21/08/2014~~28/08/2014~~8 7
34 54397 01/09/2014~~08/09/2014~~8 7
35 104086 10/09/2014~~17/09/2014~~8 7
36 103823 22/09/2014~~29/09/2014~~8 7
37 116700 06/10/2014~~13/10/2014~~8 7
38 124274 Mercy Pohlong 16/10/2014~~18/10/2014~~3 3
39 122537 20/01/2015~~11/02/2015~~23 20
40 13287 Larsingh Amdep 04/05/2015~~19/05/2015~~16 14
41 15757 22/05/2015~~06/06/2015~~16 14
42 22426 08/06/2015~~09/06/2015~~2 2
43 69665 11/12/2015~~26/12/2015~~16 14
44 85101 25/01/2016~~09/02/2016~~16 14
45 93444 12/02/2016~~27/02/2016~~16 14
46 108246 02/03/2016~~17/03/2016~~16 14
47 2271 12/05/2016~~16/05/2016~~5 5
48 30248 MENSI POHLONG 19/07/2017~~02/09/2017~~46 40
49 90132 29/11/2017~~13/01/2018~~46 40
50 119311 24/01/2018~~24/01/2018~~1 1
51 150584 16/03/2018~~31/03/2018~~16 14
52 3470 04/04/2018~~10/04/2018~~7 6
53 41541 09/07/2018~~09/08/2018~~32 28
54 88875 01/10/2018~~11/10/2018~~11 10
55 144231 20/12/2018~~20/01/2019~~32 28
56 170335 24/01/2019~~22/02/2019~~30 26
57 51996 15/07/2019~~15/08/2019~~32 28
58 85008 28/08/2019~~28/09/2019~~32 28
59 117319 03/10/2019~~18/10/2019~~16 14
60 121310 22/10/2019~~06/11/2019~~16 14
61 177575 09/12/2019~~26/12/2019~~18 16
62 193647 08/01/2020~~08/01/2020~~1 1
63 28179 02/06/2020~~03/07/2020~~32 28
64 50817 06/07/2020~~30/07/2020~~25 22
65 168091 17/11/2020~~18/12/2020~~32 28
66 199952 04/01/2021~~22/01/2021~~19 17
67 79668 21/09/2021~~02/10/2021~~12 11

Period and Work on which Employment Offered

S.No Name of Applicant Month & Date from which employment requested No of Days Work Name
1 18114 Larsing Amdep 17/10/2009~~23/10/2009~~7 19 Const of Road at Nongbarehrim
2 100156 22/05/2010~~04/06/2010~~14 14 Construction of Drainage at Nongbarehrim
3 101315 08/06/2010~~21/06/2010~~14 14 Construction of Drainage at Nongbarehrim
4 103100 24/06/2010~~30/06/2010~~7 7 Construction of Drainage at Nongbarehrim
5 104565 20/07/2010~~02/08/2010~~14 14 Construction of Drainage at Nongbarehrim
6 109310 Mercy Pohlong 21/08/2010~~03/09/2010~~14 14 Construction of Drainage at Nongbarehrim
7 120032 Larsing Amdep 07/09/2010~~12/09/2010~~6 6 Construction of Drainage at Nongbarehrim
8 25684 Mercy Pohlong 22/11/2010~~23/11/2010~~2 14 Construction of Drainage at Nongbarehrim
9 2600 Larsing Amdep 16/05/2011~~31/05/2011~~16 40 Const of Road at Nongbarehrim
10 7660 01/06/2011~~08/06/2011~~8 34 Const of Road at Nongbarehrim
11 12074 17/06/2011~~24/06/2011~~8 31 Const of Road at Nongbarehrim
12 13315 25/06/2011~~10/07/2011~~16 38 Const of Road at Nongbarehrim
13 9527 15/07/2011~~22/07/2011~~8 27 Const of Road at Nongbarehrim
14 10183 23/07/2011~~30/07/2011~~8 34 Const of Road at Nongbarehrim
15 14721 01/08/2011~~08/08/2011~~8 37 Const of Road at Nongbarehrim
16 17462 09/08/2011~~24/08/2011~~16 41 Const of Road at Nongbarehrim
17 27198 06/02/2012~~21/02/2012~~16 45 Const of Road at Nongbarehrim
18 27359 22/02/2012~~26/02/2012~~5 25 Const of Road at Nongbarehrim
19 3158 02/04/2013~~09/04/2013~~8 35 Const of R/Wall at Nongbarehrim
20 3964 10/04/2013~~25/04/2013~~16 53 Const of R/Wall at Nongbarehrim
21 49516 Larsingh Amdep 24/06/2014~~01/07/2014~~8 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec
22 51850 02/07/2014~~09/07/2014~~8 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec
23 52524 10/07/2014~~17/07/2014~~8 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec
24 53072 21/07/2014~~28/07/2014~~8 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec
25 53465 04/08/2014~~11/08/2014~~8 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec
26 53919 13/08/2014~~20/08/2014~~8 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec
27 54134 21/08/2014~~28/08/2014~~8 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec
28 54397 01/09/2014~~08/09/2014~~8 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec
29 104086 10/09/2014~~17/09/2014~~8 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec
30 103823 22/09/2014~~29/09/2014~~8 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec
31 116700 06/10/2014~~13/10/2014~~8 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec
32 124274 Mercy Pohlong 16/10/2014~~18/10/2014~~3 3 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec
33 122537 20/01/2015~~11/02/2015~~23 20 Construction of RetainingWall (ECW) at Nongbareh Rim Vec
34 13287 Larsingh Amdep 04/05/2015~~19/05/2015~~16 14 "Const. of Internal road at Nongbarehrim
35 15757 22/05/2015~~06/06/2015~~16 14 "Const. of Internal road at Nongbarehrim
36 22426 08/06/2015~~09/06/2015~~2 2 "Const. of Internal road at Nongbarehrim
37 69665 11/12/2015~~26/12/2015~~16 14 Consnt. of Internal Road at Nongbarehrim Vec L= 900M PH-II including R/Wall & Slab Cover Culvert
38 85101 25/01/2016~~09/02/2016~~16 14 Consnt. of Internal Road at Nongbarehrim Vec L= 900M PH-II including R/Wall & Slab Cover Culvert
39 93444 12/02/2016~~27/02/2016~~16 14 Consnt. of Internal Road at Nongbarehrim Vec L= 900M PH-II including R/Wall & Slab Cover Culvert
40 108246 02/03/2016~~17/03/2016~~16 14 Consnt. of Internal Road at Nongbarehrim Vec L= 900M PH-II including R/Wall & Slab Cover Culvert
41 2271 12/05/2016~~16/05/2016~~5 5 Consnt. of Internal Road at Nongbarehrim Vec L= 900M PH-II including R/Wall & Slab Cover Culvert
42 30248 MENSI POHLONG 19/07/2017~~02/09/2017~~46 40 Construction of R/Wall Ph-V at Nongbareh Rim VEC W.O 2017-18/FP-26
43 90132 29/11/2017~~13/01/2018~~46 40 Construction of R Wall Ph VII at Nongbareh Rim VEC 2017-18
44 119311 24/01/2018~~24/01/2018~~1 1 Construction of R Wall Ph VII at Nongbareh Rim VEC 2017-18
45 150584 16/03/2018~~31/03/2018~~16 14 Construction of R Wall Ph X at Nongbarehrim VEC Length 93.5 WO:2017-18/FP-117
46 3470 04/04/2018~~10/04/2018~~7 6 Construction of R Wall Ph X at Nongbarehrim VEC Length 93.5 WO:2017-18/FP-117
47 41541 09/07/2018~~09/08/2018~~32 28 Construction of R Wall Ph XI Length 160m at Nongbareh Rim VEC WO 2018-19/FP-23
48 88875 01/10/2018~~11/10/2018~~11 10 Construction of R Wall Ph XI Length 160m at Nongbareh Rim VEC WO 2018-19/FP-23
49 144231 20/12/2018~~20/01/2019~~32 28 Construction of R Wall Ph XIII at Nongbarehrim VEC Length 85m WO 2018 19 FP 94
50 170335 24/01/2019~~22/02/2019~~30 26 Construction of R Wall Ph XIII at Nongbarehrim VEC Length 85m WO 2018 19 FP 94
51 51996 15/07/2019~~15/08/2019~~32 28 Construction of Railing at Nongbareh Rim VEC Length 500 m WO 2019 20 FP 8
52 85008 28/08/2019~~28/09/2019~~32 28 Construction of Railing at Nongbareh Rim VEC Length 500 m WO 2019 20 FP 8
53 117319 03/10/2019~~18/10/2019~~16 14 Construction of Railing at Nongbareh Rim VEC Length 500 m WO 2019 20 FP 8
54 121310 22/10/2019~~06/11/2019~~16 14 Construction of Railing at Nongbareh Rim VEC Length 500 m WO 2019 20 FP 8
55 177575 09/12/2019~~26/12/2019~~18 16 Construction of Railing by GI Pipe at Nongbareh Rim VEC WO 2019 20 FP 8400
56 193647 08/01/2020~~08/01/2020~~1 1 Construction of Railing by GI Pipe at Nongbareh Rim VEC WO 2019 20 FP 8400
57 28179 02/06/2020~~03/07/2020~~32 28 Construction of Railing by GI Pipe at Nongbareh Rim VEC WO 2020 21 FP 10088
58 50817 06/07/2020~~30/07/2020~~25 22 Construction of Railing by GI Pipe at Nongbareh Rim VEC WO 2020 21 FP 10088
59 168091 17/11/2020~~18/12/2020~~32 28 Construction of R Wall at NongbarehRim VEC WO 2020 21
60 199952 04/01/2021~~22/01/2021~~19 17 Construction of R Wall at NongbarehRim VEC WO 2020 21
61 79668 21/09/2021~~02/10/2021~~12 11 Construction of Check Dam at Nongbareh Rim VEC WO 2021 22

Period and Work on which Employment Given

S.No Name of Applicant Month & Date from which employment requested No of Days Work Name MSR No. Total Amount of Work Done Payment Due
1 Larsing Amdep 17/10/2009 7 Const of Road at Nongbarehrim 13169 700 0
Sub Total FY 0910 7 700 0
2 Larsing Amdep 22/05/2010 14 Construction of Drainage at Nongbarehrim 22054 1400 0
3 Larsing Amdep 08/06/2010 14 Construction of Drainage at Nongbarehrim 28215 1400 0
4 Larsing Amdep 24/06/2010 7 Construction of Drainage at Nongbarehrim 28536 700 0
5 Larsing Amdep 20/07/2010 14 Construction of Drainage at Nongbarehrim 30329 1400 0
6 Mercy Pohlong 21/08/2010 14 Construction of Drainage at Nongbarehrim 38327 1400 0
7 Larsing Amdep 07/09/2010 6 Construction of Drainage at Nongbarehrim 383551 600 0
8 Mercy Pohlong 22/11/2010 2 Construction of Drainage at Nongbarehrim 39086 200 0
Sub Total FY 1011 71 7100 0
9 Larsing Amdep 16/05/2011 14 Const of Road at Nongbarehrim 45360 1638 0
10 Larsing Amdep 01/06/2011 7 Const of Road at Nongbarehrim 453662 819 0
11 Larsing Amdep 17/06/2011 7 Const of Road at Nongbarehrim 62376 819 0
12 Larsing Amdep 25/06/2011 14 Const of Road at Nongbarehrim 65112 1638 0
13 Larsing Amdep 15/07/2011 7 Const of Road at Nongbarehrim 457462 819 0
14 Larsing Amdep 23/07/2011 7 Const of Road at Nongbarehrim 61806 819 0
15 Larsing Amdep 01/08/2011 7 Const of Road at Nongbarehrim 65374 819 0
16 Larsing Amdep 09/08/2011 14 Const of Road at Nongbarehrim 65521 1638 0
17 Larsing Amdep 06/02/2012 14 Const of Road at Nongbarehrim 71201 1638 0
18 Larsing Amdep 22/02/2012 5 Const of Road at Nongbarehrim 71217 585 0
Sub Total FY 1112 96 11232 0
19 Larsing Amdep 02/04/2013 7 Const of R/Wall at Nongbarehrim 109013 1015 0
20 Larsing Amdep 10/04/2013 14 Const of R/Wall at Nongbarehrim 114176 2030 0
Sub Total FY 1314 21 3045 0
21 Larsingh Amdep 24/06/2014 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec 142451 1071 0
22 Larsingh Amdep 02/07/2014 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec 142465 1071 0
23 Larsingh Amdep 10/07/2014 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec 144273 1071 0
24 Larsingh Amdep 21/07/2014 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec 144287 1071 0
25 Larsingh Amdep 04/08/2014 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec 144662 1071 0
26 Larsingh Amdep 13/08/2014 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec 144676 1071 0
27 Larsingh Amdep 21/08/2014 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec 144843 1071 0
28 Larsingh Amdep 01/09/2014 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec 144857 1071 0
29 Larsingh Amdep 10/09/2014 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec 145108 1071 0
30 Larsingh Amdep 22/09/2014 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec 145122 1071 0
31 Larsingh Amdep 06/10/2014 7 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec 145922 1071 0
32 Mercy Pohlong 16/10/2014 3 Construction of Retaining Wall (Erosion Control Work at Nongbarehrim Vec 145944 459 0
33 Mercy Pohlong 20/01/2015 7 Construction of RetainingWall (ECW) at Nongbareh Rim Vec 147772 1071 0
34 Mercy Pohlong 28/01/2015 7 Construction of RetainingWall (ECW) at Nongbareh Rim Vec 147787 1071 0
35 Mercy Pohlong 05/02/2015 6 Construction of RetainingWall (ECW) at Nongbareh Rim Vec 147802 918 0
Sub Total FY 1415 100 15300 0
36 Larsingh Amdep 04/05/2015 14 "Const. of Internal road at Nongbarehrim 779 2282 0
37 Larsingh Amdep 22/05/2015 14 "Const. of Internal road at Nongbarehrim 794 2282 0
38 Larsingh Amdep 08/06/2015 2 "Const. of Internal road at Nongbarehrim 921 326 0
39 Larsingh Amdep 11/12/2015 13 Consnt. of Internal Road at Nongbarehrim Vec L= 900M PH-II including R/Wall & Slab Cover Culvert 2979 2119 0
40 Larsingh Amdep 25/01/2016 14 Consnt. of Internal Road at Nongbarehrim Vec L= 900M PH-II including R/Wall & Slab Cover Culvert 3861 2282 0
41 Larsingh Amdep 12/02/2016 14 Consnt. of Internal Road at Nongbarehrim Vec L= 900M PH-II including R/Wall & Slab Cover Culvert 4198 2282 0
42 Larsingh Amdep 02/03/2016 14 Consnt. of Internal Road at Nongbarehrim Vec L= 900M PH-II including R/Wall & Slab Cover Culvert 4776 2282 0
Sub Total FY 1516 85 13855 0
43 Larsingh Amdep 12/05/2016 5 Consnt. of Internal Road at Nongbarehrim Vec L= 900M PH-II including R/Wall & Slab Cover Culvert 133 845 0
Sub Total FY 1617 5 845 0
44 MENSI POHLONG 19/07/2017 14 Construction of R/Wall Ph-V at Nongbareh Rim VEC W.O 2017-18/FP-26 1596 2450 0
45 MENSI POHLONG 04/08/2017 14 Construction of R/Wall Ph-V at Nongbareh Rim VEC W.O 2017-18/FP-26 1602 2450 0
46 MENSI POHLONG 20/08/2017 12 Construction of R/Wall Ph-V at Nongbareh Rim VEC W.O 2017-18/FP-26 2030 2100 0
47 MENSI POHLONG 29/11/2017 14 Construction of R Wall Ph VII at Nongbareh Rim VEC 2017-18 4885 2450 0
48 MENSI POHLONG 15/12/2017 13 Construction of R Wall Ph VII at Nongbareh Rim VEC 2017-18 4891 2275 0
49 MENSI POHLONG 31/12/2017 12 Construction of R Wall Ph VII at Nongbareh Rim VEC 2017-18 5411 2100 0
50 MENSI POHLONG 24/01/2018 1 Construction of R Wall Ph VII at Nongbareh Rim VEC 2017-18 5952 175 0
51 MENSI POHLONG 16/03/2018 14 Construction of R Wall Ph X at Nongbarehrim VEC Length 93.5 WO:2017-18/FP-117 6927 2450 0
Sub Total FY 1718 94 16450 0
52 MENSI POHLONG 04/04/2018 6 Construction of R Wall Ph X at Nongbarehrim VEC Length 93.5 WO:2017-18/FP-117 103 1050 0
53 MENSI POHLONG 09/07/2018 14 Construction of R Wall Ph XI Length 160m at Nongbareh Rim VEC WO 2018-19/FP-23 1535 2534 0
54 MENSI POHLONG 25/07/2018 14 Construction of R Wall Ph XI Length 160m at Nongbareh Rim VEC WO 2018-19/FP-23 1541 2534 0
55 MENSI POHLONG 01/10/2018 10 Construction of R Wall Ph XI Length 160m at Nongbareh Rim VEC WO 2018-19/FP-23 2800 1810 0
56 MENSI POHLONG 20/12/2018 13 Construction of R Wall Ph XIII at Nongbarehrim VEC Length 85m WO 2018 19 FP 94 4029 2353 0
57 MENSI POHLONG 05/01/2019 13 Construction of R Wall Ph XIII at Nongbarehrim VEC Length 85m WO 2018 19 FP 94 4035 2353 0
58 MENSI POHLONG 24/01/2019 14 Construction of R Wall Ph XIII at Nongbarehrim VEC Length 85m WO 2018 19 FP 94 4955 2534 0
59 MENSI POHLONG 09/02/2019 12 Construction of R Wall Ph XIII at Nongbarehrim VEC Length 85m WO 2018 19 FP 94 4961 2172 0
Sub Total FY 1819 96 17340 0
60 MENSI POHLONG 15/07/2019 14 Construction of Railing at Nongbareh Rim VEC Length 500 m WO 2019 20 FP 8 425 2618 0
61 MENSI POHLONG 31/07/2019 8 Construction of Railing at Nongbareh Rim VEC Length 500 m WO 2019 20 FP 8 431 1496 0
62 MENSI POHLONG 09/08/2019 6 Construction of Railing at Nongbareh Rim VEC Length 500 m WO 2019 20 FP 8 437 1122 0
63 MENSI POHLONG 28/08/2019 14 Construction of Railing at Nongbareh Rim VEC Length 500 m WO 2019 20 FP 8 1002 2618 0
64 MENSI POHLONG 13/09/2019 14 Construction of Railing at Nongbareh Rim VEC Length 500 m WO 2019 20 FP 8 1008 2618 0
65 MENSI POHLONG 03/10/2019 14 Construction of Railing at Nongbareh Rim VEC Length 500 m WO 2019 20 FP 8 2062 2618 0
66 MENSI POHLONG 22/10/2019 14 Construction of Railing at Nongbareh Rim VEC Length 500 m WO 2019 20 FP 8 2141 2618 0
67 MENSI POHLONG 09/12/2019 14 Construction of Railing by GI Pipe at Nongbareh Rim VEC WO 2019 20 FP 8400 4113 2618 0
68 MENSI POHLONG 25/12/2019 1 Construction of Railing by GI Pipe at Nongbareh Rim VEC WO 2019 20 FP 8400 4119 187 0
69 MENSI POHLONG 08/01/2020 1 Construction of Railing by GI Pipe at Nongbareh Rim VEC WO 2019 20 FP 8400 4861 187 0
Sub Total FY 1920 100 18700 0
70 MENSI POHLONG 02/06/2020 14 Construction of Railing by GI Pipe at Nongbareh Rim VEC WO 2020 21 FP 10088 621 2842 0
71 MENSI POHLONG 18/06/2020 14 Construction of Railing by GI Pipe at Nongbareh Rim VEC WO 2020 21 FP 10088 627 2842 0
72 MENSI POHLONG 06/07/2020 14 Construction of Railing by GI Pipe at Nongbareh Rim VEC WO 2020 21 FP 10088 1105 2842 0
73 MENSI POHLONG 22/07/2020 8 Construction of Railing by GI Pipe at Nongbareh Rim VEC WO 2020 21 FP 10088 1111 1624 0
74 MENSI POHLONG 17/11/2020 14 Construction of R Wall at NongbarehRim VEC WO 2020 21 4521 2842 0
75 MENSI POHLONG 03/12/2020 14 Construction of R Wall at NongbarehRim VEC WO 2020 21 4527 2842 0
76 MENSI POHLONG 04/01/2021 14 Construction of R Wall at NongbarehRim VEC WO 2020 21 5398 2842 0
77 MENSI POHLONG 20/01/2021 3 Construction of R Wall at NongbarehRim VEC WO 2020 21 5404 609 0
Sub Total FY 2021 95 19285 0
78 MENSI POHLONG 21/09/2021 11 Construction of Check Dam at Nongbareh Rim VEC WO 2021 22 779 2486 0
Sub Total FY 2122 11 2486 0