Back

Job card
MAHATMA GANDHI NATIONAL RURAL EMPLOYMENT GUARANTEE ACT
Job card No.: MG-01-006-013-001/248 Family-Id: 248
Name of Head of Household: DRAKEN POHLONG
Name of Father/Husband: R DHAR
Category: ST
Date of Registration: 7/22/2009
Address:
Villages:
Panchayat: Khonglah
Block: AMLAREM
District: WEST JAINTIA HILLS(MEGHALAYA)
: NO Family-Id: 248
Epic No.:
Details of the Applicants of the household willing to work
S.No Name of Applicant Gender Age Bank/Postoffice
1 NIK POHLONG Male 64 Meghalaya Co-operative Apex Bank
2 DRAKEN POHLONG Male 22
3 TUROI KHYRIEM Female 37


Signature/Thumb impression of Applicant
                  
Seal & Signature of Registering Authority

Requested Period of Employment

S.No Name of Applicant Month & Date from which employment requested No of Days
1 14391 NIK POHLONG 23/09/2009~~29/09/2009~~7 7
2 15099 01/10/2009~~07/10/2009~~7 7
3 23405 08/02/2010~~21/02/2010~~14 14
4 24574 01/03/2010~~14/03/2010~~14 14
5 24832 15/03/2010~~21/03/2010~~7 7
6 12295 01/04/2010~~14/04/2010~~14 14
7 98586 01/04/2010~~14/04/2010~~14 14
8 3542 05/06/2010~~11/06/2010~~7 7
9 101959 05/06/2010~~11/06/2010~~7 7
10 3552 13/06/2010~~19/06/2010~~7 7
11 101968 13/06/2010~~19/06/2010~~7 7
12 27836 20/10/2010~~27/10/2010~~8 8
13 21423 23/11/2010~~06/12/2010~~14 14
14 118214 23/11/2010~~06/12/2010~~14 14
15 24022 09/12/2010~~15/12/2010~~7 7
16 119003 09/12/2010~~15/12/2010~~7 7
17 26830 17/12/2010~~30/12/2010~~14 14
18 1740 01/04/2011~~16/04/2011~~16 14
19 4414 26/05/2011~~02/06/2011~~8 7
20 4707 16/06/2011~~01/07/2011~~16 14
21 11318 01/09/2011~~08/09/2011~~8 7
22 11804 01/10/2011~~16/10/2011~~16 14
23 16329 17/10/2011~~20/10/2011~~4 4
24 25434 01/02/2012~~16/02/2012~~16 14
25 26292 03/03/2012~~18/03/2012~~16 14
26 3537 17/05/2012~~24/05/2012~~8 7
27 20845 17/05/2012~~23/05/2012~~7 7
28 4560 25/05/2012~~01/06/2012~~8 7
29 21106 25/05/2012~~31/05/2012~~7 7
30 6394 02/06/2012~~17/06/2012~~16 14
31 23935 02/06/2012~~15/06/2012~~14 14
32 8479 19/06/2012~~26/06/2012~~8 7
33 9462 05/07/2012~~20/07/2012~~16 14
34 1886 27/06/2013~~12/07/2013~~16 14
35 6087 13/07/2013~~20/07/2013~~8 7
36 7451 01/09/2013~~16/09/2013~~16 14
37 10487 17/09/2013~~02/10/2013~~16 14
38 10767 03/10/2013~~18/10/2013~~16 14
39 57679 11/08/2014~~18/08/2014~~8 7
40 60379 19/08/2014~~26/08/2014~~8 7
41 62630 27/08/2014~~03/09/2014~~8 7
42 63944 08/09/2014~~12/09/2014~~5 5
43 64451 27/10/2014~~03/11/2014~~8 7
44 65832 04/11/2014~~07/11/2014~~4 4
45 111869 20/11/2014~~27/11/2014~~8 7
46 102454 28/11/2014~~05/12/2014~~8 7
47 114858 06/12/2014~~13/12/2014~~8 7
48 119406 15/12/2014~~07/01/2015~~24 21
49 120299 24/01/2015~~16/02/2015~~24 21
50 10824 13/04/2015~~17/05/2015~~35 30
51 27518 20/07/2015~~23/08/2015~~35 30
52 59312 18/11/2015~~03/12/2015~~16 14
53 67533 07/12/2015~~22/12/2015~~16 14
54 78353 11/01/2016~~12/01/2016~~2 2
55 88582 08/02/2016~~18/02/2016~~11 10
56 17038 04/08/2016~~04/09/2016~~32 28
57 36529 05/09/2016~~15/09/2016~~11 10
58 56781 28/09/2016~~28/09/2016~~1 1
59 86805 09/11/2016~~12/11/2016~~4 4
60 99615 02/12/2016~~17/12/2016~~16 14
61 118976 11/01/2017~~07/02/2017~~28 24
62 147911 21/02/2017~~09/03/2017~~17 15
63 168909 21/03/2017~~24/03/2017~~4 4
64 170612 25/03/2017~~25/03/2017~~1 1
65 20576 22/06/2017~~23/06/2017~~2 2
66 32376 31/07/2017~~14/09/2017~~46 40
67 91587 04/12/2017~~24/12/2017~~21 18
68 116258 22/01/2018~~06/02/2018~~16 14
69 131266 13/02/2018~~14/03/2018~~30 26
70 42730 TUROI KHYRIEM 11/07/2018~~11/08/2018~~32 28
71 59007 DRAKEN POHLONG 13/08/2018~~24/08/2018~~12 11
72 59008 TUROI KHYRIEM 13/08/2018~~24/08/2018~~12 11
73 163450 DRAKEN POHLONG 16/01/2019~~13/02/2019~~29 25
74 163451 TUROI KHYRIEM 16/01/2019~~13/02/2019~~29 25
75 67050 05/08/2019~~05/09/2019~~32 28
76 96436 11/09/2019~~12/10/2019~~32 28
77 131364 16/10/2019~~12/11/2019~~28 24
78 159596 19/11/2019~~23/11/2019~~5 5
79 191739 08/01/2020~~24/01/2020~~17 15
80 39608 17/06/2020~~18/07/2020~~32 28
81 63855 20/07/2020~~13/08/2020~~25 22
82 163520 09/11/2020~~15/11/2020~~7 6
83 226234 25/01/2021~~25/02/2021~~32 28
84 268680 01/03/2021~~18/03/2021~~18 16
85 73735 13/09/2021~~22/09/2021~~10 9
86 101739 19/10/2021~~19/11/2021~~32 28
87 134231 24/11/2021~~25/12/2021~~32 28

Period and Work on which Employment Offered

S.No Name of Applicant Month & Date from which employment requested No of Days Work Name
1 14391 NIK POHLONG 23/09/2009~~29/09/2009~~7 35 Const of CC Footpath at Khonglah VEC
2 15099 01/10/2009~~07/10/2009~~7 42 Const of CC Footpath at Khonglah VEC
3 23405 08/02/2010~~21/02/2010~~14 34 Const of CC Footpath at Khonglah VEC
4 24574 01/03/2010~~14/03/2010~~14 20 Const of CC Footpath at Khonglah VEC
5 24832 15/03/2010~~21/03/2010~~7 27 Const of CC Footpath at Khonglah VEC
6 98586 01/04/2010~~14/04/2010~~14 14 Const of CC Footpath at Khonglah VEC
7 101959 05/06/2010~~11/06/2010~~7 7 Const of CC Footpath at Khonglah VEC
8 101968 13/06/2010~~19/06/2010~~7 7 Const of CC Footpath at Khonglah VEC
9 27836 20/10/2010~~27/10/2010~~8 59 Const of CC Footpath at Khonglah VEC
10 118214 23/11/2010~~06/12/2010~~14 14 Const of CC Footpath at Khonglah VEC
11 119003 09/12/2010~~15/12/2010~~7 7 Const of CC Footpath at Khonglah VEC
12 26830 17/12/2010~~30/12/2010~~14 39 Const of CC Footpath at Khonglah VEC
13 1740 01/04/2011~~16/04/2011~~16 41 Const of CC Footpath at Khonglah VEC
14 4414 26/05/2011~~02/06/2011~~8 34 Const of CC Footpath at Khonglah VEC
15 4707 16/06/2011~~01/07/2011~~16 41 Const of CC Footpath at Khonglah VEC
16 11318 01/09/2011~~08/09/2011~~8 33 Const of CC Footpath at Khonglah VEC
17 11804 01/10/2011~~16/10/2011~~16 39 Const of CC Footpath at Khonglah VEC
18 16329 17/10/2011~~20/10/2011~~4 24 Const of CC Footpath at Khonglah VEC
19 25434 01/02/2012~~16/02/2012~~16 40 Construction of Drainage at Khonglah
20 26292 03/03/2012~~18/03/2012~~16 40 Construction of Drainage at Khonglah
21 3537 17/05/2012~~24/05/2012~~8 36 Construction of Drainage at Khonglah
22 20845 17/05/2012~~23/05/2012~~7 31 Construction of Drainage at Khonglah
23 4560 25/05/2012~~01/06/2012~~8 32 Construction of Drainage at Khonglah
24 21106 25/05/2012~~31/05/2012~~7 35 Construction of Drainage at Khonglah
25 6394 02/06/2012~~17/06/2012~~16 42 Construction of Drainage at Khonglah
26 23935 02/06/2012~~15/06/2012~~14 35 Construction of Drainage at Khonglah
27 8479 19/06/2012~~26/06/2012~~8 41 Construction of Drainage at Khonglah
28 9462 05/07/2012~~20/07/2012~~16 42 Construction of Drainage at Khonglah
29 1886 27/06/2013~~12/07/2013~~16 42 Const of CC Footpath at Khonglah VEC
30 6087 13/07/2013~~20/07/2013~~8 35 Const of CC Footpath at Khonglah VEC
31 7451 01/09/2013~~16/09/2013~~16 49 Const of CC Footpath at Khonglah VEC Phase II
32 10487 17/09/2013~~02/10/2013~~16 42 Const of CC Footpath at Khonglah VEC Phase II
33 10767 03/10/2013~~18/10/2013~~16 43 Const of CC Footpath at Khonglah VEC Phase II
34 57679 11/08/2014~~18/08/2014~~8 7 Construction of Internal Road ( Including S/T, R/W , Culvert & S/ D) Leng=400m ,SD= Nos 8 SD =300m
35 60379 19/08/2014~~26/08/2014~~8 7 Construction of Internal Road ( Including S/T, R/W , Culvert & S/ D) Leng=400m ,SD= Nos 8 SD =300m
36 62630 27/08/2014~~03/09/2014~~8 7 Construction of Internal Road ( Including S/T, R/W , Culvert & S/ D) Leng=400m ,SD= Nos 8 SD =300m
37 63944 08/09/2014~~12/09/2014~~5 5 Construction of Internal Road ( Including S/T, R/W , Culvert & S/ D) Leng=400m ,SD= Nos 8 SD =300m
38 64451 27/10/2014~~03/11/2014~~8 7 Construction of Internal Road at Khonglah Vec
39 65832 04/11/2014~~07/11/2014~~4 4 Construction of Internal Road at Khonglah Vec
40 111869 20/11/2014~~27/11/2014~~8 7 Construction of Check dam/Community Pond at Khonglah Vec PH-I
41 102454 28/11/2014~~05/12/2014~~8 7 Construction of Check dam/Community Pond at Khonglah Vec PH-I
42 114858 06/12/2014~~13/12/2014~~8 7 Construction of Check dam/Community Pond at Khonglah Vec PH-I
43 119406 15/12/2014~~07/01/2015~~24 21 Construction of Check dam/Community Pond at Khonglah Vec PH-I
44 120299 24/01/2015~~16/02/2015~~24 21 Construction of Community Pond at Khonglah Vec Ph-II
45 10824 13/04/2015~~17/05/2015~~35 30 Construction of drainage/R/Wall Phase- I at Khonglah Vec
46 27518 20/07/2015~~23/08/2015~~35 30 Construction of R/Wall (Erosion Control work at Khonglah Vec Phase -II 2015-16
47 59312 18/11/2015~~03/12/2015~~16 14 CONSTRUCTION OF R/WALL ( EROSION ) LENGTH =828 AREA H==3M/4M FY=2015-16 AT KHONGLAH VEC
48 67533 07/12/2015~~22/12/2015~~16 14 CONSTRUCTION OF R/WALL ( EROSION ) LENGTH =828 AREA H==3M/4M FY=2015-16 AT KHONGLAH VEC
49 78353 11/01/2016~~12/01/2016~~2 2 CONSTRUCTION OF R/WALL ( EROSION ) LENGTH =828 AREA H==3M/4M FY=2015-16 AT KHONGLAH VEC
50 88582 08/02/2016~~18/02/2016~~11 10 Construction of R/W( Erosion Control Work) at Khonglah Vec FY 2015-16/116 Ph-IV L=274 M
51 17038 04/08/2016~~04/09/2016~~32 28 Const. of R/Wall Ph V at khonglah VEC L=341 m FY 2016-17/49
52 36529 05/09/2016~~15/09/2016~~11 10 Const. of R/Wall Ph V at khonglah VEC L=341 m FY 2016-17/49
53 56781 28/09/2016~~28/09/2016~~1 1 Const. of R/Wall Ph V at khonglah VEC L=341 m FY 2016-17/49
54 86805 09/11/2016~~12/11/2016~~4 4 Construction of R wall at Khonglah Vec PH-II L= 161 m W/O 2016-17/142
55 99615 02/12/2016~~17/12/2016~~16 14 Const of Internal Road at Khonglah Vec L= 553.75 m Culvert- 16 nos W/O 2016-17/76
56 118976 11/01/2017~~07/02/2017~~28 24 Const of Internal Road at Khonglah Vec L= 553.75 m Culvert- 16 nos W/O 2016-17/76
57 147911 21/02/2017~~09/03/2017~~17 15 Const of side drain slab cover at Khonglah Vec L= 555.48 m W/O 2016-17/180
58 168909 21/03/2017~~24/03/2017~~4 4 Constn of Railing at Khonglah VEC L=1295m W/O 2016-17/196
59 170612 25/03/2017~~25/03/2017~~1 1 Construction of Side Drain at Khonglah VEC L=53.12 m W/O 2016-17/195
60 20576 22/06/2017~~23/06/2017~~2 2 Roadside Tree Plantation at Khonglah VEC L=0.9 m W/O 2017-18/DP-41
61 32376 31/07/2017~~14/09/2017~~46 40 Construction of Internal Road PH-Bat Khonglah VEC 10 nos Culvert L=1350m W/O 2017-18/RC-8
62 91587 04/12/2017~~24/12/2017~~21 18 Construction of Railing cum Compound Fencing at Khonglah VEC 2017-18
63 116258 22/01/2018~~06/02/2018~~16 14 Construction of 4 Nos Bathing Sheds at Khonglah VEC 2017-18
64 131266 13/02/2018~~14/03/2018~~30 26 Construction of 4 Nos Bathing Sheds at Khonglah VEC 2017-18
65 42730 TUROI KHYRIEM 11/07/2018~~11/08/2018~~32 28 Construction of Side Drain Slab Cover L= 262 m at Khonglah VEC W/O 2018-19/FP-14
66 59007 DRAKEN POHLONG 13/08/2018~~24/08/2018~~12 11 Construction of Side Drain Slab Cover L= 262 m at Khonglah VEC W/O 2018-19/FP-14
67 59008 TUROI KHYRIEM 13/08/2018~~24/08/2018~~12 11 Construction of Side Drain Slab Cover L= 262 m at Khonglah VEC W/O 2018-19/FP-14
68 163450 DRAKEN POHLONG 16/01/2019~~13/02/2019~~29 25 Construction of Football Playground at Khonglah VEC WO 2018 19 LD 2
69 163451 TUROI KHYRIEM 16/01/2019~~13/02/2019~~29 25 Construction of Football Playground at Khonglah VEC WO 2018 19 LD 2
70 67050 05/08/2019~~05/09/2019~~32 28 Construction of Compound fencing Cum Side Drain L 346m at Khonglah VEC WO 2019 20 FP 13
71 96436 11/09/2019~~12/10/2019~~32 28 Construction of Compound fencing Cum Side Drain L 346m at Khonglah VEC WO 2019 20 FP 13
72 131364 16/10/2019~~12/11/2019~~28 24 Construction of Compound fencing Cum Side Drain L 346m at Khonglah VEC WO 2019 20 FP 13
73 159596 19/11/2019~~23/11/2019~~5 5 Construction of Water Tank Convergence A 9msq at Khonglah VEC WO 2019 20 WC 12147
74 191739 08/01/2020~~24/01/2020~~17 15 Construction of Internal Road at Khonglah VEC WO 2019 20 RC 35636
75 39608 17/06/2020~~18/07/2020~~32 28 Construction of Compound Fencing Cum Side drain at Khonglah VEC WO 2020 21
76 63855 20/07/2020~~13/08/2020~~25 22 Construction of Compound Fencing Cum Side drain at Khonglah VEC WO 2020 21
77 163520 09/11/2020~~15/11/2020~~7 6 Improvement of Check Dam at Khonglah VEC WO 2020 21 WC 22426
78 226234 25/01/2021~~25/02/2021~~32 28 Construction of Check Dam at Khonglah VEC WO 20020 21 WC
79 268680 01/03/2021~~18/03/2021~~18 16 Construction of Check Dam at Khonglah VEC WO 20020 21 WC
80 73735 13/09/2021~~22/09/2021~~10 9 Construction of Water Drinking Source In Kor Wah Sohrai with MBDA at Khanglah Vec WO 2021 22
81 101739 19/10/2021~~19/11/2021~~32 28 Construction of Check Dam at Khonglah VEC WO 2021 22
82 134231 24/11/2021~~25/12/2021~~32 28 Construction of Check Dam at Khonglah VEC WO 2021 22

Period and Work on which Employment Given

S.No Name of Applicant Month & Date from which employment requested No of Days Work Name MSR No. Total Amount of Work Done Payment Due
1 NIK POHLONG 23/09/2009 7 Const of CC Footpath at Khonglah VEC 12649 700 0
2 NIK POHLONG 01/10/2009 7 Const of CC Footpath at Khonglah VEC 12936 700 0
3 NIK POHLONG 08/02/2010 14 Const of CC Footpath at Khonglah VEC 20164 1400 0
4 NIK POHLONG 01/03/2010 14 Const of CC Footpath at Khonglah VEC 15122 1400 0
5 NIK POHLONG 15/03/2010 7 Const of CC Footpath at Khonglah VEC 21399 700 0
Sub Total FY 0910 49 4900 0
6 NIK POHLONG 01/04/2010 14 Const of CC Footpath at Khonglah VEC 21491 1400 0
7 NIK POHLONG 05/06/2010 7 Const of CC Footpath at Khonglah VEC 28314 700 0
8 NIK POHLONG 13/06/2010 1 Const of CC Footpath at Khonglah VEC 28315 100 0
9 NIK POHLONG 20/10/2010 7 Const of CC Footpath at Khonglah VEC 45001 700 700
10 NIK POHLONG 23/11/2010 14 Const of CC Footpath at Khonglah VEC 43891 1400 0
11 NIK POHLONG 09/12/2010 7 Const of CC Footpath at Khonglah VEC 44074 700 0
12 NIK POHLONG 17/12/2010 14 Const of CC Footpath at Khonglah VEC 44452 1400 0
Sub Total FY 1011 64 6400 700
13 NIK POHLONG 01/04/2011 14 Const of CC Footpath at Khonglah VEC 45001 1638 0
14 NIK POHLONG 16/06/2011 14 Const of CC Footpath at Khonglah VEC 45705 1638 0
15 NIK POHLONG 01/09/2011 7 Const of CC Footpath at Khonglah VEC 62112 819 0
16 NIK POHLONG 01/10/2011 14 Const of CC Footpath at Khonglah VEC 62137 1638 0
17 NIK POHLONG 17/10/2011 4 Const of CC Footpath at Khonglah VEC 62062 468 0
18 NIK POHLONG 01/02/2012 14 Construction of Drainage at Khonglah 71049 1638 0
Sub Total FY 1112 67 7839 0
19 NIK POHLONG 17/05/2012 7 Construction of Drainage at Khonglah 86111 896 0
20 NIK POHLONG 25/05/2012 7 Construction of Drainage at Khonglah 86138 896 0
21 NIK POHLONG 02/06/2012 14 Construction of Drainage at Khonglah 86400 1792 0
22 NIK POHLONG 19/06/2012 7 Construction of Drainage at Khonglah 86527 896 0
23 NIK POHLONG 05/07/2012 14 Construction of Drainage at Khonglah 86545 1792 0
Sub Total FY 1213 49 6272 0
24 NIK POHLONG 27/06/2013 14 Const of CC Footpath at Khonglah VEC 109244 2030 0
25 NIK POHLONG 13/07/2013 7 Const of CC Footpath at Khonglah VEC 114596 1015 0
26 NIK POHLONG 01/09/2013 14 Const of CC Footpath at Khonglah VEC Phase II 119181 2030 0
27 NIK POHLONG 17/09/2013 14 Const of CC Footpath at Khonglah VEC Phase II 119237 2030 0
28 NIK POHLONG 03/10/2013 14 Const of CC Footpath at Khonglah VEC Phase II 119265 2030 0
Sub Total FY 1314 63 9135 0
29 NIK POHLONG 11/08/2014 7 Construction of Internal Road ( Including S/T, R/W , Culvert & S/ D) Leng=400m ,SD= Nos 8 SD =300m 142855 1071 0
30 NIK POHLONG 19/08/2014 7 Construction of Internal Road ( Including S/T, R/W , Culvert & S/ D) Leng=400m ,SD= Nos 8 SD =300m 142882 1071 0
31 NIK POHLONG 27/08/2014 7 Construction of Internal Road ( Including S/T, R/W , Culvert & S/ D) Leng=400m ,SD= Nos 8 SD =300m 144422 1071 0
32 NIK POHLONG 08/09/2014 5 Construction of Internal Road ( Including S/T, R/W , Culvert & S/ D) Leng=400m ,SD= Nos 8 SD =300m 144449 765 0
33 NIK POHLONG 27/10/2014 7 Construction of Internal Road at Khonglah Vec 145799 1071 0
34 NIK POHLONG 04/11/2014 4 Construction of Internal Road at Khonglah Vec 145827 612 0
35 NIK POHLONG 20/11/2014 7 Construction of Check dam/Community Pond at Khonglah Vec PH-I 146247 1071 0
36 NIK POHLONG 28/11/2014 7 Construction of Check dam/Community Pond at Khonglah Vec PH-I 146276 1071 0
37 NIK POHLONG 06/12/2014 7 Construction of Check dam/Community Pond at Khonglah Vec PH-I 146297 1071 0
38 NIK POHLONG 15/12/2014 7 Construction of Check dam/Community Pond at Khonglah Vec PH-I 146330 1071 0
39 NIK POHLONG 23/12/2014 7 Construction of Check dam/Community Pond at Khonglah Vec PH-I 146355 1071 0
40 NIK POHLONG 31/12/2014 7 Construction of Check dam/Community Pond at Khonglah Vec PH-I 146865 1071 0
41 NIK POHLONG 24/01/2015 7 Construction of Community Pond at Khonglah Vec Ph-II 146786 1071 0
42 NIK POHLONG 01/02/2015 7 Construction of Community Pond at Khonglah Vec Ph-II 146815 1071 0
43 NIK POHLONG 09/02/2015 7 Construction of Community Pond at Khonglah Vec Ph-II 146844 1071 0
Sub Total FY 1415 100 15300 0
44 NIK POHLONG 13/04/2015 7 Construction of drainage/R/Wall Phase- I at Khonglah Vec 223 1141 0
45 NIK POHLONG 21/04/2015 7 Construction of drainage/R/Wall Phase- I at Khonglah Vec 252 1141 0
46 NIK POHLONG 29/04/2015 7 Construction of drainage/R/Wall Phase- I at Khonglah Vec 281 1141 0
47 NIK POHLONG 07/05/2015 7 Construction of drainage/R/Wall Phase- I at Khonglah Vec 310 1141 0
48 NIK POHLONG 15/05/2015 2 Construction of drainage/R/Wall Phase- I at Khonglah Vec 339 326 0
49 NIK POHLONG 20/07/2015 14 Construction of R/Wall (Erosion Control work at Khonglah Vec Phase -II 2015-16 1077 2282 0
50 NIK POHLONG 05/08/2015 14 Construction of R/Wall (Erosion Control work at Khonglah Vec Phase -II 2015-16 1320 2282 0
51 NIK POHLONG 21/08/2015 2 Construction of R/Wall (Erosion Control work at Khonglah Vec Phase -II 2015-16 1349 326 0
52 NIK POHLONG 18/11/2015 14 CONSTRUCTION OF R/WALL ( EROSION ) LENGTH =828 AREA H==3M/4M FY=2015-16 AT KHONGLAH VEC 2589 2282 0
53 NIK POHLONG 07/12/2015 14 CONSTRUCTION OF R/WALL ( EROSION ) LENGTH =828 AREA H==3M/4M FY=2015-16 AT KHONGLAH VEC 2825 2282 0
54 NIK POHLONG 11/01/2016 2 CONSTRUCTION OF R/WALL ( EROSION ) LENGTH =828 AREA H==3M/4M FY=2015-16 AT KHONGLAH VEC 3417 326 0
55 NIK POHLONG 08/02/2016 10 Construction of R/W( Erosion Control Work) at Khonglah Vec FY 2015-16/116 Ph-IV L=274 M 4094 1630 0
Sub Total FY 1516 100 16300 0
56 NIK POHLONG 04/08/2016 14 Const. of R/Wall Ph V at khonglah VEC L=341 m FY 2016-17/49 1031 2366 0
57 NIK POHLONG 20/08/2016 13 Const. of R/Wall Ph V at khonglah VEC L=341 m FY 2016-17/49 1057 2197 0
58 NIK POHLONG 05/09/2016 10 Const. of R/Wall Ph V at khonglah VEC L=341 m FY 2016-17/49 1961 1690 0
59 NIK POHLONG 28/09/2016 1 Const. of R/Wall Ph V at khonglah VEC L=341 m FY 2016-17/49 2469 169 0
60 NIK POHLONG 09/11/2016 4 Construction of R wall at Khonglah Vec PH-II L= 161 m W/O 2016-17/142 3512 676 0
61 NIK POHLONG 02/12/2016 14 Const of Internal Road at Khonglah Vec L= 553.75 m Culvert- 16 nos W/O 2016-17/76 3908 2366 0
62 NIK POHLONG 11/01/2017 14 Const of Internal Road at Khonglah Vec L= 553.75 m Culvert- 16 nos W/O 2016-17/76 4351 2366 0
63 NIK POHLONG 27/01/2017 10 Const of Internal Road at Khonglah Vec L= 553.75 m Culvert- 16 nos W/O 2016-17/76 4379 1690 0
64 NIK POHLONG 21/02/2017 14 Const of side drain slab cover at Khonglah Vec L= 555.48 m W/O 2016-17/180 5258 2366 0
65 NIK POHLONG 09/03/2017 1 Const of side drain slab cover at Khonglah Vec L= 555.48 m W/O 2016-17/180 5284 169 0
66 NIK POHLONG 21/03/2017 4 Constn of Railing at Khonglah VEC L=1295m W/O 2016-17/196 6006 676 0
67 NIK POHLONG 25/03/2017 1 Construction of Side Drain at Khonglah VEC L=53.12 m W/O 2016-17/195 6105 169 0
Sub Total FY 1617 100 16900 0
68 NIK POHLONG 22/06/2017 2 Roadside Tree Plantation at Khonglah VEC L=0.9 m W/O 2017-18/DP-41 867 350 0
69 NIK POHLONG 31/07/2017 14 Construction of Internal Road PH-Bat Khonglah VEC 10 nos Culvert L=1350m W/O 2017-18/RC-8 1699 2450 0
70 NIK POHLONG 16/08/2017 14 Construction of Internal Road PH-Bat Khonglah VEC 10 nos Culvert L=1350m W/O 2017-18/RC-8 1826 2450 0
71 NIK POHLONG 01/09/2017 12 Construction of Internal Road PH-Bat Khonglah VEC 10 nos Culvert L=1350m W/O 2017-18/RC-8 2481 2100 0
72 NIK POHLONG 04/12/2017 7 Construction of Railing cum Compound Fencing at Khonglah VEC 2017-18 4927 1225 0
73 NIK POHLONG 12/12/2017 7 Construction of Railing cum Compound Fencing at Khonglah VEC 2017-18 4948 1225 0
74 NIK POHLONG 20/12/2017 4 Construction of Railing cum Compound Fencing at Khonglah VEC 2017-18 4969 700 0
75 NIK POHLONG 22/01/2018 14 Construction of 4 Nos Bathing Sheds at Khonglah VEC 2017-18 5908 2450 0
76 NIK POHLONG 13/02/2018 14 Construction of 4 Nos Bathing Sheds at Khonglah VEC 2017-18 6344 2450 0
77 NIK POHLONG 01/03/2018 12 Construction of 4 Nos Bathing Sheds at Khonglah VEC 2017-18 6346 2100 0
Sub Total FY 1718 100 17500 0
78 TUROI KHYRIEM 11/07/2018 14 Construction of Side Drain Slab Cover L= 262 m at Khonglah VEC W/O 2018-19/FP-14 1662 2534 0
79 TUROI KHYRIEM 27/07/2018 14 Construction of Side Drain Slab Cover L= 262 m at Khonglah VEC W/O 2018-19/FP-14 1666 2534 0
80 DRAKEN POHLONG 13/08/2018 11 Construction of Side Drain Slab Cover L= 262 m at Khonglah VEC W/O 2018-19/FP-14 2284 1991 0
81 TUROI KHYRIEM 13/08/2018 11 Construction of Side Drain Slab Cover L= 262 m at Khonglah VEC W/O 2018-19/FP-14 2284 1991 0
82 DRAKEN POHLONG 16/01/2019 14 Construction of Football Playground at Khonglah VEC WO 2018 19 LD 2 4549 2534 0
83 TUROI KHYRIEM 16/01/2019 14 Construction of Football Playground at Khonglah VEC WO 2018 19 LD 2 4549 2534 0
84 DRAKEN POHLONG 16/01/2019 11 Construction of Football Playground at Khonglah VEC WO 2018 19 LD 2 4562 1991 0
85 TUROI KHYRIEM 16/01/2019 11 Construction of Football Playground at Khonglah VEC WO 2018 19 LD 2 4562 1991 0
Sub Total FY 1819 100 18100 0
86 TUROI KHYRIEM 05/08/2019 14 Construction of Compound fencing Cum Side Drain L 346m at Khonglah VEC WO 2019 20 FP 13 680 2618 0
87 TUROI KHYRIEM 21/08/2019 14 Construction of Compound fencing Cum Side Drain L 346m at Khonglah VEC WO 2019 20 FP 13 686 2618 0
88 TUROI KHYRIEM 11/09/2019 14 Construction of Compound fencing Cum Side Drain L 346m at Khonglah VEC WO 2019 20 FP 13 1338 2618 0
89 TUROI KHYRIEM 27/09/2019 14 Construction of Compound fencing Cum Side Drain L 346m at Khonglah VEC WO 2019 20 FP 13 1344 2618 0
90 TUROI KHYRIEM 16/10/2019 14 Construction of Compound fencing Cum Side Drain L 346m at Khonglah VEC WO 2019 20 FP 13 2477 2618 0
91 TUROI KHYRIEM 01/11/2019 10 Construction of Compound fencing Cum Side Drain L 346m at Khonglah VEC WO 2019 20 FP 13 2483 1870 0
92 TUROI KHYRIEM 19/11/2019 5 Construction of Water Tank Convergence A 9msq at Khonglah VEC WO 2019 20 WC 12147 3514 935 0
93 TUROI KHYRIEM 08/01/2020 14 Construction of Internal Road at Khonglah VEC WO 2019 20 RC 35636 4691 2618 0
94 TUROI KHYRIEM 24/01/2020 1 Construction of Internal Road at Khonglah VEC WO 2019 20 RC 35636 4718 187 0
Sub Total FY 1920 100 18700 0
95 TUROI KHYRIEM 17/06/2020 14 Construction of Compound Fencing Cum Side drain at Khonglah VEC WO 2020 21 856 2842 0
96 TUROI KHYRIEM 03/07/2020 14 Construction of Compound Fencing Cum Side drain at Khonglah VEC WO 2020 21 865 2842 0
97 TUROI KHYRIEM 20/07/2020 14 Construction of Compound Fencing Cum Side drain at Khonglah VEC WO 2020 21 1397 2842 0
98 TUROI KHYRIEM 05/08/2020 8 Construction of Compound Fencing Cum Side drain at Khonglah VEC WO 2020 21 1406 1624 0
99 TUROI KHYRIEM 09/11/2020 6 Improvement of Check Dam at Khonglah VEC WO 2020 21 WC 22426 4328 1218 0
100 TUROI KHYRIEM 25/01/2021 14 Construction of Check Dam at Khonglah VEC WO 20020 21 WC 6331 2842 0
101 TUROI KHYRIEM 10/02/2021 14 Construction of Check Dam at Khonglah VEC WO 20020 21 WC 6345 2842 0
102 TUROI KHYRIEM 01/03/2021 14 Construction of Check Dam at Khonglah VEC WO 20020 21 WC 7359 2842 0
103 TUROI KHYRIEM 17/03/2021 2 Construction of Check Dam at Khonglah VEC WO 20020 21 WC 7373 406 0
Sub Total FY 2021 100 20300 0
104 TUROI KHYRIEM 13/09/2021 9 Construction of Water Drinking Source In Kor Wah Sohrai with MBDA at Khanglah Vec WO 2021 22 563 2034 0
105 TUROI KHYRIEM 19/10/2021 14 Construction of Check Dam at Khonglah VEC WO 2021 22 1223 3164 0
106 TUROI KHYRIEM 04/11/2021 14 Construction of Check Dam at Khonglah VEC WO 2021 22 1227 3164 0
Sub Total FY 2122 37 8362 0