Details of the Applicants of the household willing to work
S.No Name of Applicant Gender Age Bank/Postoffice
1 S.SUMER Female 22 JOWAI
2 S.SUMER Male 19 JOWAI
3 BEVAN SUMER Male 27 Meghalaya Co-operative Apex Bank
4 SWEETHEART SUMER Female 31 Meghalaya Co-operative Apex Bank


Signature/Thumb impression of Applicant
                  
Seal & Signature of Registering Authority

Requested Period of Employment

S.No Demand Id Name of Applicant Month & Date from which employment requested No of Days
1 5886 S.SUMER 01/07/2008~~10/07/2008~~10 10
2 12240 17/11/2008~~21/11/2008~~5 5
3 14312 23/09/2009~~29/09/2009~~7 7
4 15020 01/10/2009~~07/10/2009~~7 7
5 23326 08/02/2010~~21/02/2010~~14 14
6 24495 01/03/2010~~14/03/2010~~14 14
7 24753 15/03/2010~~21/03/2010~~7 7
8 12188 01/04/2010~~14/04/2010~~14 14
9 98507 01/04/2010~~14/04/2010~~14 14
10 27762 20/10/2010~~27/10/2010~~8 8
11 21349 23/11/2010~~06/12/2010~~14 14
12 118132 23/11/2010~~06/12/2010~~14 14
13 23943 09/12/2010~~15/12/2010~~7 7
14 118924 09/12/2010~~15/12/2010~~7 7
15 26756 17/12/2010~~30/12/2010~~14 14
16 1662 01/04/2011~~16/04/2011~~16 14
17 4336 26/05/2011~~02/06/2011~~8 7
18 4630 16/06/2011~~01/07/2011~~16 14
19 11240 01/09/2011~~16/09/2011~~16 14
20 11727 01/10/2011~~16/10/2011~~16 14
21 16250 17/10/2011~~20/10/2011~~4 4
22 24488 23/01/2012~~30/01/2012~~8 7
23 25356 01/02/2012~~16/02/2012~~16 14
24 26214 03/03/2012~~18/03/2012~~16 14
25 3459 17/05/2012~~24/05/2012~~8 7
26 20767 17/05/2012~~23/05/2012~~7 7
27 4481 25/05/2012~~01/06/2012~~8 7
28 21027 25/05/2012~~31/05/2012~~7 7
29 6315 02/06/2012~~17/06/2012~~16 14
30 23856 02/06/2012~~15/06/2012~~14 14
31 8401 19/06/2012~~26/06/2012~~8 7
32 9383 05/07/2012~~20/07/2012~~16 14
33 1807 27/06/2013~~12/07/2013~~16 14
34 6008 13/07/2013~~20/07/2013~~8 7
35 7373 01/09/2013~~16/09/2013~~16 14
36 10410 17/09/2013~~02/10/2013~~16 14
37 10688 03/10/2013~~18/10/2013~~16 14
38 57470 SWEETHEART SUMER 11/08/2014~~18/08/2014~~8 7
39 60156 19/08/2014~~26/08/2014~~8 7
40 62475 27/08/2014~~03/09/2014~~8 7
41 63868 08/09/2014~~12/09/2014~~5 5
42 64263 27/10/2014~~03/11/2014~~8 7
43 65629 04/11/2014~~07/11/2014~~4 4
44 111655 20/11/2014~~27/11/2014~~8 7
45 101439 28/11/2014~~05/12/2014~~8 7
46 114779 06/12/2014~~13/12/2014~~8 7
47 118659 15/12/2014~~07/01/2015~~24 21
48 120126 24/01/2015~~16/02/2015~~24 21
49 10846 13/04/2015~~17/05/2015~~35 30
50 27235 20/07/2015~~23/08/2015~~35 30
51 59235 18/11/2015~~03/12/2015~~16 14
52 67445 07/12/2015~~22/12/2015~~16 14
53 78245 11/01/2016~~12/01/2016~~2 2
54 88498 08/02/2016~~18/02/2016~~11 10
55 21937 16/08/2016~~31/08/2016~~16 14
56 27221 01/09/2016~~16/09/2016~~16 14
57 58070 30/09/2016~~15/10/2016~~16 14
58 58145 17/10/2016~~01/11/2016~~16 14
59 90872 14/11/2016~~20/11/2016~~7 6
60 99950 02/12/2016~~17/12/2016~~16 14
61 119102 11/01/2017~~07/02/2017~~28 24
62 20501 22/06/2017~~23/06/2017~~2 2
63 32287 31/07/2017~~14/09/2017~~46 40
64 91545 04/12/2017~~24/12/2017~~21 18
65 127308 06/02/2018~~09/03/2018~~32 28
66 149691 16/03/2018~~29/03/2018~~14 12
67 42243 11/07/2018~~11/08/2018~~32 28
68 58332 13/08/2018~~06/09/2018~~25 22
69 165254 BEVAN SUMER 17/01/2019~~14/02/2019~~29 25
70 165255 SWEETHEART SUMER 17/01/2019~~14/02/2019~~29 25
71 66873 05/08/2019~~05/09/2019~~32 28
72 96492 11/09/2019~~12/10/2019~~32 28
73 131158 16/10/2019~~12/11/2019~~28 24
74 159700 19/11/2019~~23/11/2019~~5 5
75 191866 08/01/2020~~24/01/2020~~17 15
76 39801 17/06/2020~~18/07/2020~~32 28
77 64557 21/07/2020~~14/08/2020~~25 22
78 163461 09/11/2020~~15/11/2020~~7 6
79 216121 18/01/2021~~18/02/2021~~32 28
80 256808 19/02/2021~~06/03/2021~~16 14
81 291776 15/03/2021~~16/03/2021~~2 2
82 73598 13/09/2021~~22/09/2021~~10 9
83 101758 19/10/2021~~19/11/2021~~32 28
84 134199 24/11/2021~~25/12/2021~~32 28
85 162985 03/01/2022~~03/02/2022~~32 28
86 202193 04/02/2022~~08/02/2022~~5 5
87 223578 21/02/2022~~23/02/2022~~3 3

Period and Work on which Employment Offered

S.No Demand Id Name of Applicant Month & Date from which employment requested No of Days Work Name
1 5886 S.SUMER 01/07/2008~~10/07/2008~~10 30 Afforestation and trees plantation at Khonglah
2 12240 17/11/2008~~21/11/2008~~5 15 Afforestation and trees plantation at Khonglah
3 14312 23/09/2009~~29/09/2009~~7 42 Const of CC Footpath at Khonglah VEC
4 15020 01/10/2009~~07/10/2009~~7 42 Const of CC Footpath at Khonglah VEC
5 23326 08/02/2010~~21/02/2010~~14 34 Const of CC Footpath at Khonglah VEC
6 24495 01/03/2010~~14/03/2010~~14 35 Const of CC Footpath at Khonglah VEC
7 24753 15/03/2010~~21/03/2010~~7 27 Const of CC Footpath at Khonglah VEC
8 98507 01/04/2010~~14/04/2010~~14 14 Const of CC Footpath at Khonglah VEC
9 27762 20/10/2010~~27/10/2010~~8 59 Const of CC Footpath at Khonglah VEC
10 118132 23/11/2010~~06/12/2010~~14 14 Const of CC Footpath at Khonglah VEC
11 118924 09/12/2010~~15/12/2010~~7 7 Const of CC Footpath at Khonglah VEC
12 26756 17/12/2010~~30/12/2010~~14 48 Const of CC Footpath at Khonglah VEC
13 1662 01/04/2011~~16/04/2011~~16 41 Const of CC Footpath at Khonglah VEC
14 4336 26/05/2011~~02/06/2011~~8 34 Const of CC Footpath at Khonglah VEC
15 4630 16/06/2011~~01/07/2011~~16 41 Const of CC Footpath at Khonglah VEC
16 11240 01/09/2011~~16/09/2011~~16 39 Const of CC Footpath at Khonglah VEC
17 11727 01/10/2011~~16/10/2011~~16 41 Const of CC Footpath at Khonglah VEC
18 16250 17/10/2011~~20/10/2011~~4 24 Const of CC Footpath at Khonglah VEC
19 24488 23/01/2012~~30/01/2012~~8 34 Construction of Drainage at Khonglah
20 25356 01/02/2012~~16/02/2012~~16 45 Construction of Drainage at Khonglah
21 26214 03/03/2012~~18/03/2012~~16 40 Construction of Drainage at Khonglah
22 3459 17/05/2012~~24/05/2012~~8 26 Construction of Drainage at Khonglah
23 20767 17/05/2012~~23/05/2012~~7 34 Construction of Drainage at Khonglah
24 4481 25/05/2012~~01/06/2012~~8 40 Construction of Drainage at Khonglah
25 21027 25/05/2012~~31/05/2012~~7 35 Construction of Drainage at Khonglah
26 6315 02/06/2012~~17/06/2012~~16 42 Construction of Drainage at Khonglah
27 23856 02/06/2012~~15/06/2012~~14 35 Construction of Drainage at Khonglah
28 8401 19/06/2012~~26/06/2012~~8 42 Construction of Drainage at Khonglah
29 9383 05/07/2012~~20/07/2012~~16 50 Construction of Drainage at Khonglah
30 1807 27/06/2013~~12/07/2013~~16 45 Const of CC Footpath at Khonglah VEC
31 6008 13/07/2013~~20/07/2013~~8 35 Const of CC Footpath at Khonglah VEC
32 7373 01/09/2013~~16/09/2013~~16 42 Const of CC Footpath at Khonglah VEC Phase II
33 10410 17/09/2013~~02/10/2013~~16 42 Const of CC Footpath at Khonglah VEC Phase II
34 10688 03/10/2013~~18/10/2013~~16 49 Const of CC Footpath at Khonglah VEC Phase II
35 57470 SWEETHEART SUMER 11/08/2014~~18/08/2014~~8 7 Construction of Internal Road ( Including S/T, R/W , Culvert & S/ D) Leng=400m ,SD= Nos 8 SD =300m
36 60156 19/08/2014~~26/08/2014~~8 7 Construction of Internal Road ( Including S/T, R/W , Culvert & S/ D) Leng=400m ,SD= Nos 8 SD =300m
37 62475 27/08/2014~~03/09/2014~~8 7 Construction of Internal Road ( Including S/T, R/W , Culvert & S/ D) Leng=400m ,SD= Nos 8 SD =300m
38 63868 08/09/2014~~12/09/2014~~5 5 Construction of Internal Road ( Including S/T, R/W , Culvert & S/ D) Leng=400m ,SD= Nos 8 SD =300m
39 64263 27/10/2014~~03/11/2014~~8 7 Construction of Internal Road at Khonglah Vec
40 65629 04/11/2014~~07/11/2014~~4 4 Construction of Internal Road at Khonglah Vec
41 111655 20/11/2014~~27/11/2014~~8 7 Construction of Check dam/Community Pond at Khonglah Vec PH-I
42 101439 28/11/2014~~05/12/2014~~8 7 Construction of Check dam/Community Pond at Khonglah Vec PH-I
43 114779 06/12/2014~~13/12/2014~~8 7 Construction of Check dam/Community Pond at Khonglah Vec PH-I
44 118659 15/12/2014~~07/01/2015~~24 21 Construction of Check dam/Community Pond at Khonglah Vec PH-I
45 120126 24/01/2015~~16/02/2015~~24 21 Construction of Community Pond at Khonglah Vec Ph-II
46 10846 13/04/2015~~17/05/2015~~35 30 Construction of drainage/R/Wall Phase- I at Khonglah Vec
47 27235 20/07/2015~~23/08/2015~~35 30 Construction of R/Wall (Erosion Control work at Khonglah Vec Phase -II 2015-16
48 59235 18/11/2015~~03/12/2015~~16 14 CONSTRUCTION OF R/WALL ( EROSION ) LENGTH =828 AREA H==3M/4M FY=2015-16 AT KHONGLAH VEC
49 67445 07/12/2015~~22/12/2015~~16 14 CONSTRUCTION OF R/WALL ( EROSION ) LENGTH =828 AREA H==3M/4M FY=2015-16 AT KHONGLAH VEC
50 78245 11/01/2016~~12/01/2016~~2 2 CONSTRUCTION OF R/WALL ( EROSION ) LENGTH =828 AREA H==3M/4M FY=2015-16 AT KHONGLAH VEC
51 88498 08/02/2016~~18/02/2016~~11 10 Construction of R/W( Erosion Control Work) at Khonglah Vec FY 2015-16/116 Ph-IV L=274 M
52 21937 16/08/2016~~31/08/2016~~16 14 Construction of Piggery Shed by SMT.SWEARTHEART SUMER MG01006013001/169 at Khonglah Vec FY- 2016-17
53 27221 01/09/2016~~16/09/2016~~16 14 Construction of Piggery Shed by SMT.SWEARTHEART SUMER MG01006013001/169 at Khonglah Vec FY- 2016-17
54 58070 30/09/2016~~15/10/2016~~16 14 Construction of Piggery Shed by SMT.SWEARTHEART SUMER MG01006013001/169 at Khonglah Vec FY- 2016-17
55 58145 17/10/2016~~01/11/2016~~16 14 Construction of Piggery Shed by SMT.SWEARTHEART SUMER MG01006013001/169 at Khonglah Vec FY- 2016-17
56 90872 14/11/2016~~20/11/2016~~7 6 Construction of Piggery Shed by SMT.SWEARTHEART SUMER MG01006013001/169 at Khonglah Vec FY- 2016-17
57 99950 02/12/2016~~17/12/2016~~16 14 Const of Internal Road at Khonglah Vec L= 553.75 m Culvert- 16 nos W/O 2016-17/76
58 119102 11/01/2017~~07/02/2017~~28 24 Const of Internal Road at Khonglah Vec L= 553.75 m Culvert- 16 nos W/O 2016-17/76
59 20501 22/06/2017~~23/06/2017~~2 2 Roadside Tree Plantation at Khonglah VEC L=0.9 m W/O 2017-18/DP-41
60 32287 31/07/2017~~14/09/2017~~46 40 Construction of Internal Road PH-Bat Khonglah VEC 10 nos Culvert L=1350m W/O 2017-18/RC-8
61 91545 04/12/2017~~24/12/2017~~21 18 Construction of Railing cum Compound Fencing at Khonglah VEC 2017-18
62 127308 06/02/2018~~09/03/2018~~32 28 Construction of Side Drain Slab Cover at Khonglah VEC Length 337.3 m WO:2017-18/FP-97
63 149691 16/03/2018~~29/03/2018~~14 12 Construction of Side Drain Slab Cover at Khonglah VEC Length 337.3 m WO:2017-18/FP-97
64 42243 11/07/2018~~11/08/2018~~32 28 Construction of Play Ground at Khonglah VEC Gallery L= 188m W/O 2018-19/LD-1
65 58332 13/08/2018~~06/09/2018~~25 22 Construction of Play Ground at Khonglah VEC Gallery L= 188m W/O 2018-19/LD-1
66 165254 BEVAN SUMER 17/01/2019~~14/02/2019~~29 25 Construction of View Point at Khonglah VEC WO 2018 19 LD 5
67 165255 SWEETHEART SUMER 17/01/2019~~14/02/2019~~29 25 Construction of View Point at Khonglah VEC WO 2018 19 LD 5
68 66873 05/08/2019~~05/09/2019~~32 28 Construction of Internal Road n 5 nos Culvert L 230m at Khonglah VEC WO 2019 20 RC 5
69 96492 11/09/2019~~12/10/2019~~32 28 Construction of Internal Road n 5 nos Culvert L 230m at Khonglah VEC WO 2019 20 RC 5
70 131158 16/10/2019~~12/11/2019~~28 24 Construction of Internal Road n 5 nos Culvert L 230m at Khonglah VEC WO 2019 20 RC 5
71 159700 19/11/2019~~23/11/2019~~5 5 Construction of Water Tank Convergence A 9msq at Khonglah VEC WO 2019 20 WC 12147
72 191866 08/01/2020~~24/01/2020~~17 15 Construction of Internal Road at Khonglah VEC WO 2019 20 RC 35636
73 39801 17/06/2020~~18/07/2020~~32 28 Land preperation for cultivation at Khonglah VEC WO 2020 21
74 64557 21/07/2020~~14/08/2020~~25 22 Land preperation for cultivation at Khonglah VEC WO 2020 21
75 163461 09/11/2020~~15/11/2020~~7 6 Improvement of Check Dam at Khonglah VEC WO 2020 21 WC 22426
76 216121 18/01/2021~~18/02/2021~~32 28 Construction of Drainage at Khonglah VEC WO 2020 21 FP
77 256808 19/02/2021~~06/03/2021~~16 14 Construction of Drainage at Khonglah VEC WO 2020 21 FP
78 291776 15/03/2021~~16/03/2021~~2 2 Construction of Drainage at Khonglah VEC WO 2020 21 FP
79 73598 13/09/2021~~22/09/2021~~10 9 Construction of Water Drinking Source In Kor Wah Sohrai with MBDA at Khanglah Vec WO 2021 22
80 101758 19/10/2021~~19/11/2021~~32 28 Construction of Check Dam at Khonglah VEC WO 2021 22
81 134199 24/11/2021~~25/12/2021~~32 28 Construction of Check Dam at Khonglah VEC WO 2021 22
82 162985 03/01/2022~~03/02/2022~~32 28 Construction of Check Dam at Khonglah VEC WO 2021 22
83 202193 04/02/2022~~08/02/2022~~5 5 Construction of Check Dam at Khonglah VEC WO 2021 22
84 223578 21/02/2022~~23/02/2022~~3 3 Construction of Internal Road at Khonglah VEC WO 2021 22

Period and Work on which Employment Given

S.No Name of Applicant Month & Date from which employment requested No of Days Work Name MSR No. Total Amount of Work Done Payment Due
1 S.SUMER 01/07/2008 8 Afforestation and trees plantation at Khonglah -13 560 0
2 S.SUMER 17/11/2008 5 Afforestation and trees plantation at Khonglah 5959 350 0
Sub Total FY 0809 13 910 0
3 S.SUMER 23/09/2009 7 Const of CC Footpath at Khonglah VEC 12644 700 0
4 S.SUMER 01/10/2009 7 Const of CC Footpath at Khonglah VEC 12931 700 0
5 S.SUMER 08/02/2010 14 Const of CC Footpath at Khonglah VEC 20156 1400 0
6 S.SUMER 01/03/2010 14 Const of CC Footpath at Khonglah VEC 15114 1400 0
7 S.SUMER 15/03/2010 7 Const of CC Footpath at Khonglah VEC 21391 700 0
Sub Total FY 0910 49 4900 0
8 S.SUMER 01/04/2010 14 Const of CC Footpath at Khonglah VEC 21483 1400 0
9 S.SUMER 20/10/2010 7 Const of CC Footpath at Khonglah VEC 45001 700 700
10 S.SUMER 23/11/2010 14 Const of CC Footpath at Khonglah VEC 43891 1400 0
11 S.SUMER 09/12/2010 7 Const of CC Footpath at Khonglah VEC 44074 700 0
12 S.SUMER 17/12/2010 14 Const of CC Footpath at Khonglah VEC 44452 1400 0
Sub Total FY 1011 56 5600 700
13 S.SUMER 01/04/2011 14 Const of CC Footpath at Khonglah VEC 45001 1638 0
14 S.SUMER 26/05/2011 7 Const of CC Footpath at Khonglah VEC 45310 700 0
15 S.SUMER 16/06/2011 14 Const of CC Footpath at Khonglah VEC 45698 1638 0
16 S.SUMER 01/09/2011 14 Const of CC Footpath at Khonglah VEC 62104 1638 0
17 S.SUMER 01/10/2011 14 Const of CC Footpath at Khonglah VEC 62129 1638 0
18 S.SUMER 17/10/2011 4 Const of CC Footpath at Khonglah VEC 62054 468 0
19 S.SUMER 23/01/2012 7 Construction of Drainage at Khonglah 71014 819 0
20 S.SUMER 01/02/2012 14 Construction of Drainage at Khonglah 71041 1638 0
Sub Total FY 1112 88 10177 0
21 S.SUMER 17/05/2012 7 Construction of Drainage at Khonglah 86103 896 0
22 S.SUMER 25/05/2012 7 Construction of Drainage at Khonglah 86130 896 0
23 S.SUMER 02/06/2012 14 Construction of Drainage at Khonglah 86392 1792 0
24 S.SUMER 19/06/2012 7 Construction of Drainage at Khonglah 86519 896 0
25 S.SUMER 05/07/2012 14 Construction of Drainage at Khonglah 86543 1792 0
Sub Total FY 1213 49 6272 0
26 S.SUMER 27/06/2013 14 Const of CC Footpath at Khonglah VEC 109236 2030 0
27 S.SUMER 13/07/2013 7 Const of CC Footpath at Khonglah VEC 114588 1015 0
28 S.SUMER 01/09/2013 14 Const of CC Footpath at Khonglah VEC Phase II 119173 2030 0
29 S.SUMER 17/09/2013 14 Const of CC Footpath at Khonglah VEC Phase II 119229 2030 0
30 S.SUMER 03/10/2013 14 Const of CC Footpath at Khonglah VEC Phase II 119257 2030 0
Sub Total FY 1314 63 9135 0
31 SWEETHEART SUMER 11/08/2014 7 Construction of Internal Road ( Including S/T, R/W , Culvert & S/ D) Leng=400m ,SD= Nos 8 SD =300m 142847 1071 0
32 SWEETHEART SUMER 19/08/2014 7 Construction of Internal Road ( Including S/T, R/W , Culvert & S/ D) Leng=400m ,SD= Nos 8 SD =300m 142874 1071 0
33 SWEETHEART SUMER 27/08/2014 7 Construction of Internal Road ( Including S/T, R/W , Culvert & S/ D) Leng=400m ,SD= Nos 8 SD =300m 144414 1071 0
34 SWEETHEART SUMER 08/09/2014 5 Construction of Internal Road ( Including S/T, R/W , Culvert & S/ D) Leng=400m ,SD= Nos 8 SD =300m 144441 765 0
35 SWEETHEART SUMER 27/10/2014 7 Construction of Internal Road at Khonglah Vec 145791 1071 0
36 SWEETHEART SUMER 04/11/2014 4 Construction of Internal Road at Khonglah Vec 145819 612 0
37 SWEETHEART SUMER 20/11/2014 7 Construction of Check dam/Community Pond at Khonglah Vec PH-I 146239 1071 0
38 SWEETHEART SUMER 28/11/2014 7 Construction of Check dam/Community Pond at Khonglah Vec PH-I 146268 1071 0
39 SWEETHEART SUMER 06/12/2014 7 Construction of Check dam/Community Pond at Khonglah Vec PH-I 146288 1071 0
40 SWEETHEART SUMER 15/12/2014 7 Construction of Check dam/Community Pond at Khonglah Vec PH-I 146321 1071 0
41 SWEETHEART SUMER 23/12/2014 7 Construction of Check dam/Community Pond at Khonglah Vec PH-I 146346 1071 0
42 SWEETHEART SUMER 31/12/2014 7 Construction of Check dam/Community Pond at Khonglah Vec PH-I 146856 1071 0
43 SWEETHEART SUMER 24/01/2015 7 Construction of Community Pond at Khonglah Vec Ph-II 146778 1071 0
44 SWEETHEART SUMER 01/02/2015 7 Construction of Community Pond at Khonglah Vec Ph-II 146807 1071 0
45 SWEETHEART SUMER 09/02/2015 7 Construction of Community Pond at Khonglah Vec Ph-II 146836 1071 0
Sub Total FY 1415 100 15300 0
46 SWEETHEART SUMER 13/04/2015 7 Construction of drainage/R/Wall Phase- I at Khonglah Vec 214 1141 0
47 SWEETHEART SUMER 21/04/2015 7 Construction of drainage/R/Wall Phase- I at Khonglah Vec 243 1141 0
48 SWEETHEART SUMER 29/04/2015 7 Construction of drainage/R/Wall Phase- I at Khonglah Vec 272 1141 0
49 SWEETHEART SUMER 07/05/2015 7 Construction of drainage/R/Wall Phase- I at Khonglah Vec 301 1141 0
50 SWEETHEART SUMER 15/05/2015 2 Construction of drainage/R/Wall Phase- I at Khonglah Vec 330 326 0
51 SWEETHEART SUMER 20/07/2015 14 Construction of R/Wall (Erosion Control work at Khonglah Vec Phase -II 2015-16 1068 2282 0
52 SWEETHEART SUMER 05/08/2015 14 Construction of R/Wall (Erosion Control work at Khonglah Vec Phase -II 2015-16 1311 2282 0
53 SWEETHEART SUMER 21/08/2015 2 Construction of R/Wall (Erosion Control work at Khonglah Vec Phase -II 2015-16 1340 326 0
54 SWEETHEART SUMER 18/11/2015 14 CONSTRUCTION OF R/WALL ( EROSION ) LENGTH =828 AREA H==3M/4M FY=2015-16 AT KHONGLAH VEC 2580 2282 0
55 SWEETHEART SUMER 07/12/2015 14 CONSTRUCTION OF R/WALL ( EROSION ) LENGTH =828 AREA H==3M/4M FY=2015-16 AT KHONGLAH VEC 2816 2282 0
56 SWEETHEART SUMER 11/01/2016 2 CONSTRUCTION OF R/WALL ( EROSION ) LENGTH =828 AREA H==3M/4M FY=2015-16 AT KHONGLAH VEC 3408 326 0
57 SWEETHEART SUMER 08/02/2016 10 Construction of R/W( Erosion Control Work) at Khonglah Vec FY 2015-16/116 Ph-IV L=274 M 4085 1630 0
Sub Total FY 1516 100 16300 0
58 SWEETHEART SUMER 16/08/2016 14 Construction of Piggery Shed by SMT.SWEARTHEART SUMER MG01006013001/169 at Khonglah Vec FY- 2016-17 1182 2366 0
59 SWEETHEART SUMER 01/09/2016 14 Construction of Piggery Shed by SMT.SWEARTHEART SUMER MG01006013001/169 at Khonglah Vec FY- 2016-17 1570 2366 0
60 SWEETHEART SUMER 30/09/2016 14 Construction of Piggery Shed by SMT.SWEARTHEART SUMER MG01006013001/169 at Khonglah Vec FY- 2016-17 2539 2366 0
61 SWEETHEART SUMER 17/10/2016 14 Construction of Piggery Shed by SMT.SWEARTHEART SUMER MG01006013001/169 at Khonglah Vec FY- 2016-17 2578 2366 0
62 SWEETHEART SUMER 14/11/2016 6 Construction of Piggery Shed by SMT.SWEARTHEART SUMER MG01006013001/169 at Khonglah Vec FY- 2016-17 3676 1014 0
63 SWEETHEART SUMER 02/12/2016 14 Const of Internal Road at Khonglah Vec L= 553.75 m Culvert- 16 nos W/O 2016-17/76 3900 2366 0
64 SWEETHEART SUMER 11/01/2017 14 Const of Internal Road at Khonglah Vec L= 553.75 m Culvert- 16 nos W/O 2016-17/76 4343 2366 0
65 SWEETHEART SUMER 27/01/2017 10 Const of Internal Road at Khonglah Vec L= 553.75 m Culvert- 16 nos W/O 2016-17/76 4371 1690 0
Sub Total FY 1617 100 16900 0
66 SWEETHEART SUMER 22/06/2017 2 Roadside Tree Plantation at Khonglah VEC L=0.9 m W/O 2017-18/DP-41 859 350 0
67 SWEETHEART SUMER 31/07/2017 14 Construction of Internal Road PH-Bat Khonglah VEC 10 nos Culvert L=1350m W/O 2017-18/RC-8 1692 2450 0
68 SWEETHEART SUMER 16/08/2017 14 Construction of Internal Road PH-Bat Khonglah VEC 10 nos Culvert L=1350m W/O 2017-18/RC-8 1819 2450 0
69 SWEETHEART SUMER 01/09/2017 12 Construction of Internal Road PH-Bat Khonglah VEC 10 nos Culvert L=1350m W/O 2017-18/RC-8 2474 2100 0
70 SWEETHEART SUMER 04/12/2017 7 Construction of Railing cum Compound Fencing at Khonglah VEC 2017-18 4921 1225 0
71 SWEETHEART SUMER 12/12/2017 7 Construction of Railing cum Compound Fencing at Khonglah VEC 2017-18 4942 1225 0
72 SWEETHEART SUMER 20/12/2017 4 Construction of Railing cum Compound Fencing at Khonglah VEC 2017-18 4963 700 0
73 SWEETHEART SUMER 06/02/2018 14 Construction of Side Drain Slab Cover at Khonglah VEC Length 337.3 m WO:2017-18/FP-97 6254 2450 0
74 SWEETHEART SUMER 22/02/2018 14 Construction of Side Drain Slab Cover at Khonglah VEC Length 337.3 m WO:2017-18/FP-97 6260 2450 0
75 SWEETHEART SUMER 16/03/2018 12 Construction of Side Drain Slab Cover at Khonglah VEC Length 337.3 m WO:2017-18/FP-97 6898 2100 0
Sub Total FY 1718 100 17500 0
76 SWEETHEART SUMER 11/07/2018 14 Construction of Play Ground at Khonglah VEC Gallery L= 188m W/O 2018-19/LD-1 1616 2534 0
77 SWEETHEART SUMER 27/07/2018 14 Construction of Play Ground at Khonglah VEC Gallery L= 188m W/O 2018-19/LD-1 1626 2534 0
78 SWEETHEART SUMER 13/08/2018 14 Construction of Play Ground at Khonglah VEC Gallery L= 188m W/O 2018-19/LD-1 2227 2534 0
79 SWEETHEART SUMER 29/08/2018 8 Construction of Play Ground at Khonglah VEC Gallery L= 188m W/O 2018-19/LD-1 2237 1448 0
80 BEVAN SUMER 17/01/2019 14 Construction of View Point at Khonglah VEC WO 2018 19 LD 5 4640 2534 0
81 SWEETHEART SUMER 17/01/2019 14 Construction of View Point at Khonglah VEC WO 2018 19 LD 5 4640 2534 0
82 BEVAN SUMER 17/01/2019 11 Construction of View Point at Khonglah VEC WO 2018 19 LD 5 4643 1991 0
83 SWEETHEART SUMER 17/01/2019 11 Construction of View Point at Khonglah VEC WO 2018 19 LD 5 4643 1991 0
Sub Total FY 1819 100 18100 0
84 SWEETHEART SUMER 05/08/2019 14 Construction of Internal Road n 5 nos Culvert L 230m at Khonglah VEC WO 2019 20 RC 5 668 2618 0
85 SWEETHEART SUMER 21/08/2019 14 Construction of Internal Road n 5 nos Culvert L 230m at Khonglah VEC WO 2019 20 RC 5 674 2618 0
86 SWEETHEART SUMER 11/09/2019 14 Construction of Internal Road n 5 nos Culvert L 230m at Khonglah VEC WO 2019 20 RC 5 1350 2618 0
87 SWEETHEART SUMER 27/09/2019 14 Construction of Internal Road n 5 nos Culvert L 230m at Khonglah VEC WO 2019 20 RC 5 1356 2618 0
88 SWEETHEART SUMER 16/10/2019 14 Construction of Internal Road n 5 nos Culvert L 230m at Khonglah VEC WO 2019 20 RC 5 2453 2618 0
89 SWEETHEART SUMER 01/11/2019 10 Construction of Internal Road n 5 nos Culvert L 230m at Khonglah VEC WO 2019 20 RC 5 2459 1870 0
90 SWEETHEART SUMER 19/11/2019 5 Construction of Water Tank Convergence A 9msq at Khonglah VEC WO 2019 20 WC 12147 3507 935 0
91 SWEETHEART SUMER 08/01/2020 14 Construction of Internal Road at Khonglah VEC WO 2019 20 RC 35636 4684 2618 0
92 SWEETHEART SUMER 24/01/2020 1 Construction of Internal Road at Khonglah VEC WO 2019 20 RC 35636 4711 187 0
Sub Total FY 1920 100 18700 0
93 SWEETHEART SUMER 17/06/2020 14 Land preperation for cultivation at Khonglah VEC WO 2020 21 871 2842 0
94 SWEETHEART SUMER 03/07/2020 14 Land preperation for cultivation at Khonglah VEC WO 2020 21 880 2842 0
95 SWEETHEART SUMER 21/07/2020 14 Land preperation for cultivation at Khonglah VEC WO 2020 21 1430 2842 0
96 SWEETHEART SUMER 06/08/2020 8 Land preperation for cultivation at Khonglah VEC WO 2020 21 1439 1624 0
97 SWEETHEART SUMER 09/11/2020 6 Improvement of Check Dam at Khonglah VEC WO 2020 21 WC 22426 4321 1218 0
98 SWEETHEART SUMER 18/01/2021 14 Construction of Drainage at Khonglah VEC WO 2020 21 FP 6030 2842 0
99 SWEETHEART SUMER 03/02/2021 14 Construction of Drainage at Khonglah VEC WO 2020 21 FP 6156 2842 0
100 SWEETHEART SUMER 19/02/2021 14 Construction of Drainage at Khonglah VEC WO 2020 21 FP 7031 2842 0
101 SWEETHEART SUMER 15/03/2021 2 Construction of Drainage at Khonglah VEC WO 2020 21 FP 7891 406 0
Sub Total FY 2021 100 20300 0
102 SWEETHEART SUMER 13/09/2021 9 Construction of Water Drinking Source In Kor Wah Sohrai with MBDA at Khanglah Vec WO 2021 22 555 2034 0
103 SWEETHEART SUMER 19/10/2021 14 Construction of Check Dam at Khonglah VEC WO 2021 22 1220 3164 0
104 SWEETHEART SUMER 04/11/2021 14 Construction of Check Dam at Khonglah VEC WO 2021 22 1224 3164 0
105 SWEETHEART SUMER 24/11/2021 14 Construction of Check Dam at Khonglah VEC WO 2021 22 2241 3164 0
106 SWEETHEART SUMER 10/12/2021 13 Construction of Check Dam at Khonglah VEC WO 2021 22 2245 2938 0
107 SWEETHEART SUMER 03/01/2022 14 Construction of Check Dam at Khonglah VEC WO 2021 22 2975 3164 0
108 SWEETHEART SUMER 19/01/2022 14 Construction of Check Dam at Khonglah VEC WO 2021 22 2979 3164 0
109 SWEETHEART SUMER 04/02/2022 5 Construction of Check Dam at Khonglah VEC WO 2021 22 4413 1130 0
110 SWEETHEART SUMER 21/02/2022 3 Construction of Internal Road at Khonglah VEC WO 2021 22 4935 678 0
Sub Total FY 2122 100 22600 0